Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Subsea

Fugro, a Dutch geotechnical, survey, subsea, and geoscience services provider, will be carrying out marine operations on behalf of TE Subsea Communications LLC (TESubCom) for the HAVFRUE Subsea Cable System Project. The project is scheduled to begin on Saturday 20th January 2018 and last for approximately 14 days (weather permitting).

Havfrue (Norwegian for Mermaid) is the brand name for the wider cable system, of which Aqua Comms will own and operate a large proportion. It is the first subsea cable system to connect Northern Europe and the US in almost twenty years. The project was commissioned by a consortium of companies that includes Bulk Infrastructure, Facebook and Google.

photo fugro 63989The Department of Transport, Tourism and Sport has been advised that Fugro (pictured above) will be carrying out marine operations on behalf of TE Subsea Communications LLC for the HAVFRUE Subsea Cable System Project

Irish Submarine cable supplier and operator Aqua Comms has joined forces with TESubCom, a company specializing in fiber optic cable deployments and marine services, to prepare the groundwork for a transatlantic cable network connecting New Jersey in the US with Ireland and Denmark. At present, Aqua Comms operates Ireland’s first dedicated subsea fibre-optic network connecting New York, London and Dublin.

Aqua Comms will also market and sell capacity services on its portion of the Havfrue cable system under the brand name America Europe Connect-2 (AEC-2) as complementary to its existing transatlantic cable, America Europe Connect-1 (AEC-1), running between New York and Killala in Co Mayo. The AEC-2 cable system will complete a ring-based network connecting the US, Ireland, the UK and Denmark.

Whereas the AEC-1 cable comes ashore in Killala, Co. Mayo, the AEC-2 cable loks like it is set to come ashore in Westport Co. Mayo, which lies on Clew Bay.

cable googleThe AEC-2 Cable run into Clew Bay, Co. Mayo Source: Department of Transport, Tourism and Sport

This system is due to come online in the fourth quarter of 2019. TESubCom has already launched the cable route survey operations.

The network will connect Dublin to Manchester and the North Sea Connect cable linking Stellium-operated data centre in Newcastle, England to Esbjerg in Denmark, creating a circular network connecting each of the above mentioned locations to one another.

Survey operations for the link to Ireland will be conducted on a 24 hour basis. Throughout survey operations the vessel will be displaying the shapes and lights prescribed in the International Rules for the Prevention of Collisions at Sea (COLREGS) Rule 27, to indicate that the survey vessel is restricted in its ability to manoeuvre.
The vessel that will undertake the project is the MV Fugro Discovery (Callsign: 3EKE6). A listening watch will be maintained on VHF Channel 16, and the vessel will actively transmit an AIS signal.

Published in News Update

#Subsea - The Irish Times has more details on the new transatlantic subsea internet cable Hibernia Express, work on which got underway this past March.

Clearance and pre-laying work continued this month in the Celtic Sea to prepare for the arrival of the 4,600km fibre optic cable in Cork Harbour in the coming weeks.

Once connected to the new Cork Internet Exchange (CIX), it will be the first modern telecommunications cable of its kind to link North America and Europe in well over a decade.

And its speed and capacity – offering the lowest latency between New York and London – will be a boon for businesses that depend on the fastest possible and most robust data connections.

Combined with the shorter Ireland-France Subsea Cable, it's also set to make Cork a leading global internet switching centre, eliminating the need for Ireland's internet traffic to go through the UK before the rest of the world, as TechCentral reports.

Published in Cork Harbour
Tagged under

#HiberniaExpress - The Department of Transport, Tourism and Sport advises that TE SubCom, on behalf of Hibernia Express, is carrying out a route clearance operation and a pre-lay grapnel run along the Hibernia Express cable route using the M/V Ile d’Aix (Callsign FICI) and M/V Atlantic Guardian (Callsign HO6566.

The operations, which follow earlier work on the same subsea cable route in March, commenced on 17 and 13 May 2015 respectively are expected to last until the end of June 2015, weather permitting.

The vessels will be towing grapnels astern at a distance depending on water depth, and as such, will be restricted in their ability to manoeuvre.

All vessels are requested to give these operation a wide berth. The project vessels will be listening on VHF Channel 16 throughout the project.

Details of co-ordinates for both vessels' work areas are included in Marine Notices Nos 18 and 19 of 2015, available to read or download HERE and HERE.

Published in Marine Warning

Ireland's Trading Ketch Ilen

The Ilen is the last of Ireland’s traditional wooden sailing ships.

Designed by Limerick man Conor O’Brien and built in Baltimore in 1926, she was delivered by Munster men to the Falkland Islands where she served valiantly for seventy years, enduring and enjoying the Roaring Forties, the Furious Fifties, and Screaming Sixties.

Returned now to Ireland and given a new breath of life, Ilen may be described as the last of Ireland’s timber-built ocean-going sailing ships, yet at a mere 56ft, it is capable of visiting most of the small harbours of Ireland.

Wooden Sailing Ship Ilen FAQs

The Ilen is the last of Ireland’s traditional wooden sailing ships.

The Ilen was designed by Conor O’Brien, the first Irish man to circumnavigate the world.

Ilen is named for the West Cork River which flows to the sea at Baltimore, her home port.

The Ilen was built by Baltimore Sea Fisheries School, West Cork in 1926. Tom Moynihan was foreman.

Ilen's wood construction is of oak ribs and planks of larch.

As-built initially, she is 56 feet in length overall with a beam of 14 feet and a displacement of 45 tonnes.

Conor O’Brien set sail in August 1926 with two Cadogan cousins from Cape Clear in West Cork, arriving at Port Stanley in January 1927 and handed it over to the new owners.

The Ilen was delivered to the Falkland Islands Company, in exchange for £1,500.

Ilen served for over 70 years as a cargo ship and a ferry in the Falkland Islands, enduring and enjoying the Roaring Forties, the Furious Fifties, and Screaming Sixties. She stayed in service until the early 1990s.

Limerick sailor Gary McMahon and his team located Ilen. MacMahon started looking for her in 1996 and went out to the Falklands and struck a deal with the owner to bring her back to Ireland.

After a lifetime of hard work in the Falklands, Ilen required a ground-up rebuild.

A Russian cargo ship transported her back on a 12,000-mile trip from the Southern Oceans to Dublin. The Ilen was discharged at the Port of Dublin 1997, after an absence from Ireland of 70 years.

It was a collaboration between the Ilen Project in Limerick and Hegarty’s Boatyard in Old Court, near Skibbereen. Much of the heavy lifting, of frames, planking, deadwood & backbone, knees, floors, shelves and stringers, deck beams, and carlins, was done in Hegarty’s. The generally lighter work of preparing sole, bulkheads, deck‐houses fixed furniture, fixtures & fittings, deck fittings, machinery, systems, tanks, spar making and rigging is being done at the Ilen boat building school in Limerick.

Ten years. The boat was much the worse for wear when it returned to West Cork in May 1998, and it remained dormant for ten years before the start of a decade-long restoration.

Ilen now serves as a community floating classroom and cargo vessel – visiting 23 ports in 2019 and making a transatlantic crossing to Greenland as part of a relationship-building project to link youth in Limerick City with youth in Nuuk, west Greenland.

At a mere 56ft, Ilen is capable of visiting most of the small harbours of Ireland.

©Afloat 2020