Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: New Directors

Belfast Harbour has recently made the appointment of three new Directors to its Leadership Team.

The appointments are designed so to continue developing its strategy to become a world leading regional port and a key economic hub for the region. As well to growing economic activity, adopting new technology and to the highest environmental standards.

Ian Lang joined Belfast Harbour as Infrastructure and Sustainability Director. This follows 15 years’ experience in the transport and aviation sector, leading the development agenda at airports in various geographies, most recently including Gatwick, Edinburgh and Glasgow.

Significant experience by Lang has been in delivering complex infrastructure projects, including the project management of large-scale capital investment portfolios, and will bolster Teams in developing high-quality, sustainable infrastructure. In addition the role involves promoting Belfast Harbour’s Green Port strategy.

Mike Dawson has been appointed as People and Corporate Services Director. From his previous roles, including Group HR and Corporate Services

Director at Dale Farm, Dawson brings a wealth of experience in developing progressive HR policies and procedures, and will drive Belfast’s Harbour’s commitment to nurturing and attracting diverse talent.

Kevin Ryan's appointment is as the new Development Director, which follows a previous position with Dublin based international property company, Hines, where he was Development Director for 6 years.

Prior to this Ryan was Head of Property for Tesco Ireland. His depth of experience will support Belfast Harbour and partners in realising ambitions around future growth, enabling the organisation to continue to stimulate and grow the regional economy.

Published in Belfast Lough

New appointments at the Isle of Man Steam Packet Company have been confirmed by the ferry operator.

Brian Thomson has become the new Managing Director. A maritime leader with a wealth of experience and knowledge, he will officially begin in the role on 5th July.

With a Naval Architecture and Marine Engineering background, Brian began his professional career with the UK Maritime and Coastguard Agency. He relocated to the Isle of Man in 2014 to work as a Surveyor for the Isle of Man Ship Registry and, in 2019, was promoted to Principal Surveyor.

Brian recently led the Isle of Man Government Ill Code Compliance Project.

The second appointment at the Steam Packet is Kane Taha in the role of Operations Director.

A former Marine Manager with the Company, over the past six years he has broadened his maritime experience in Dubai as both a General Manager and a Chief Marine Specialist for the Dubai Government Road and Transport Authority.

He will take up his new post on 19th July.

Chairman Lars Ugland said: ‘On behalf of the Board, I am delighted to welcome both Brian and Kane, two highly motivated and experienced individuals who will ensure continued stable leadership and growth.

‘The Isle of Man Steam Packet Company impacts on every facet of Island life and this is truly an interesting time in our history with many exciting projects on the horizon.

‘I am sure their contributions to the business will be invaluable going forward and we wish them every success in their new positions.’

Published in Ferry
Tagged under

#irishports - Minister for Transport, Tourism & Sport, Shane Ross, has appointed two new directors to the board of the Port of Waterford Company following a competitive process managed by the Public Appointments Service.

Waterford Live writes, William Johnston and Derry O’Sullivan will join the existing board members Joe Dreelan; Louise Grubb; John Kehoe; Mary Mosse; Frank Ronan, CEO and Des Whelan, chairman.

Mr Johnston recently retired as a partner with Arthur Cox Solicitors where he specialised in banking law, capital markets and regulation. A board member at the National Maternity Hospital and the Housing Finance Agency, he is a former chair of the Law Society’s Business Law Committee and former co-chair of the Banking Law Division at the International Bar Association.

To read more on the appointments, click here. 

Published in Irish Ports

About Safehaven Marine 

Safehaven Marine are designers and builders of FRP Pilot boats, Patrol boats, Crew transfer vessels, Hydrographic survey catamarans, Naval & Military craft and unique custom private motor yachts. All our vessels are built to the highest standards of strength & engineering and are renowned worldwide for their exceptional sea-keeping abilities, we set a new World long-range speed record in 2017 with our own vessel and crew. Established in 1996 we have built over 138 vessels supplied to 27 countries worldwide with over 40 pilot vessels in operation globally, and have become leaders in our field.

Based in Youghal, Co Cork Ireland, Safehaven manufacture our vessels from two modern factories, with all design work carried out in house, and built with our own experienced team of engineers, carpenters, electricians, shipwrights and laminators.

Always at the forefront of new technology and designs we continuously develop our range and push the frontiers of design: In 2020 we aim to set a UIM Transatlantic World record with our unique (patent applied for) new 22m high-speed vessel XSV20

Interceptor 42 pilot boat

The Pilot 42 model built by Safehaven Marine has been delivered to ports worldwide and has proved to be a superb sea boat performing admirably in pilotage operations with all owners extolling its virtues of seakeeping, strength and stability.

L.O.A. (Length overall) 13.2m

L.W.L. (Length along waterline) 11.5m

Length moulded (GRP hull only) 12.7

Beam Moulded (GRP only ex fender) 4.0m

Beam overall (Including fenders) 4.4m

Draft (Depth of hull below waterline) 1.35m

Displacement Lightship 14,500kg

Fully loaded 16,000kg

Fuel capacity 1600 litres

Water capacity 110 litres

Crew capacity 5 persons

Engines Volvo D9 425hp

Gearboxes ZF325

Subdivision 4 x separate watertight compartments

Crew capacity 1-2 crew plus 3- 4 pilots

Classification PRS

Speed 23.5kts fully loaded