Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: detained

Operator P&O Ferries which has a ship on the North Channel route has been detained in Larne Port for being “unfit to sail”.

The vessel European Causeway reports Belfast Telegraph, has been held in the Northern Ireland port due to “failures on crew familiarisation, vessel documentation and crew training”, the Maritime and Coastguard Agency (MCA) said.

Transport Secretary Grant Shapps said he will not compromise the safety of P&O vessels and insisted that the company will not be able to rush training for inexperienced people.

The company has sacked almost 800 seafarers and plans to replace them with agency staff on cheaper salaries.

A spokesperson for the Maritime and Coastguard Agency said: “We can confirm that the European Causeway has been detained in Larne.

“It has been detained due to failures on crew familiarisation, vessel documentation and crew training.

“The vessel will remain under detention until all these issues are resolved by P&O Ferries. Only then will it be reinspected.”

The MCA said there were no passengers or freight on board the European Causeway vessel when it was detained.

For much more on the this story from the Co. Antrim ferryport click here.

Published in Ferry
Tagged under

A fishing vessel registered in France according to RTE News, has been detained off the Cork coast.

The Naval Service vessel LÉ Niamh detained the boat (on Wednesday) and its crew around 150 nautical miles south west of Fastnet Rock.

The detention was in connection with an alleged breach of fishing regulations.

The fishing boat is being escorted by the LÉ Niamh to Castletownbere, where it will be handed over to gardaí.

The Naval Service says this is the ninth vessel to be detained so far this year.

Published in Navy

In Irish waters a Portuguese-registered fishing vessel, reports The Irish Times, was detained by the Navy Service on Thursday.

The Lé Samuel Beckett, a Naval Service patrol vessel, detained the Portuguese boat approximately 200 nautical miles south of Fastnet Rock, after an alleged breach of fishing regulations.

In a statement, the service said the Portuguese vessel was being escorted to Castletownbere, County Cork, where it will be handed over to An Garda Síochána. The detention is now a garda matter and the nature of the infringement has not been disclosed.

It is the second detainment by the service this week and the eighth of 2019. On Tuesday, Lé George Bernard Shaw detained an Irish fishing vessel off Howth.

More here on this latest detention. 

Published in Navy

#navy - In Dundalk Bay, two Northern Ireland-registered fishing vessels were detained on Tuesday evening of this week.

As RTE News reports, they were detained by the crew of the LÉ Orla who were carrying out their normal patrols in the area.

The Irish Naval Service has confirmed the two boats were detained for alleged breach of fishing regulations.

They were escorted to Clogherhead where they were handed over to gardaí yesterday.

Gardaí say the vessels, The Boy Joseph and The Amity, were detained under the 2006 Fisheries Act and an order to hold the boats for 48 hours was issued at Dundalk District Court.

The fishing boats remain at Clogherhead.

The detention of the two vessels comes amid an ongoing dispute caused by the demise of an informal deal between the UK and Irish governments.

For further reading on the fishery detention, click here.

Published in Navy
Tagged under

#NavalService- A fishing vessel has been detained by the Irish Naval Service off the coast of Mizen Head, Co. Cork in relation to “an alleged breach of fishing regulations”.

The vessel writes Independent.ie was detained by the Naval Service offshore patrol ship LÉ Samuel Beckett approximately 170 nautical miles west of Mizen Head, and is currently being escorted to Dingle in Co Kerry.

It is expected to arrive alongside LÉ Samuel Beckett tomorrow morning (today, 5 Dec) where it will be handed over to gardai on arrival.

For more on the detention click here.

Published in Navy

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.