Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: bridge

#INLAND WATERWAYS - RTÉ News reports that An Bord Pleanála and NI Environment Minister Alex Attwood have granted planning permission for a new cross-border bridge spanning the River Newry near Carlingford Lough.

The single carriageway cable bridge will be 660 metres in length, with most of the funds required being sought from the EU`s €30 million fund for development in border regions. It is hoped to be completed and open to traffic by 2015.

The bridge will cross the river at Narrow Water, an area once notorious for an IRA ambush in 1979 that saw 18 British soldiers killed in a series of explosions.

It will also be able to open to allow tall ships and other vessels to access Victoria Lock and Albert Basin in nearby Newry.

Quoted in the Irish Independent is Pamela Arthurs, who helped lead the project on behalf of both Louth and Down county councils, who said the bridge was first mooted as far back as 1976.

"This has been a major project but it is not just about the fact that we will have a bridge, it is what it symbolises in how far we have come as a country," she said.

Minister Attwood also hailed the project as improving accessibility in a region of substantial natural beauty.

"It will be a great economic boost for the area, creating construction jobs in the short term, enhance tourism and promote greater community interaction across the border," he added.

The Irish Independent has more on the story HERE.

Published in Inland Waterways

#RIVER CORRIB - A consultant’s report on Wolfe Tone Bridge in Galway could clear the way for a new crossing of the River Corrib, according to The Connacht Sentinel.

Galway City Council has confirmed that the €400,000 report will look at the possibility of a new bridge for vehicular traffic downstream of the existing span.

“Given the age of the current structure, we have to look at plans for the construction of a new bridge and the retention of the existing crossing as part of a walkway over the Corrib," said the council's director of services Ciarán Hayes.

“There is no doubt that such a walkway, as part as an overall regeneration plan for the area, would be a most welcome addition to the amenity infrastructure of this historic part of the city."

The €400,000 allocation for the report commission will comes from the National Roads Authority and Department of the Environment budget for regional and local roads in 2012. The report is expected to be carried out later this year.

Published in Inland Waterways
14th December 2010

No Passage Through Achill Sound

Mayo County Council has advised it will not be possible for boats to pass through Achill Sound until further notice.  The announcement came in a Marine Notice issued on December 10th. This is due to on-going works connected with the bridge at the location.

Further details are available from Mayo County Council at telephone +353 (0)98 41169. A new Marine Notice will issue once passage through Achill Sound becomes possible again.

 

Published in Coastal Notes

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.