Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Southampton fittings

Manxman the new flagship ferry of the Isle of Man Steam Packet has finally arrived in UK waters, having berthed in Southampton.

The largest ferry ever built for the Steam Packet had set off from the South Korean shipyard of Hyundai Mipo Dockyard where during a ceremony the newbuild was transferred to the company on 11 May.

Two days later under the charge of Captain Andy Atkinson and Chief Engineer Dean Ellis, Manxman departed the shipyard on its delivery voyage.

The newbuild took a route via the Suez Canal as part of the voyage that took approximately 23 days at sea, and steamed over 10,000 nautical miles.

Manxman is to remain in the south of England port in Hampshire to enable final fixtures and fittings to be added, including the children’s play area.

Isle of Man Today has further details of the newbuild which is to serve the main Douglas-Heysham route.

Published in Ferry

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.