Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Schools Head

#Rowing: Enniskillen RBC had two outstanding results at the Schools’ Head of the River in London. The girls’ eight won their category, the First Eights, and were fifth overall. The boys’ eight finished second in the equivalent category behind Bedford. When the revised results were published this placed them 10th overall, the best placing by an Irish crew at the event since 2010, when Bann Rowing Club finished ninth and 2011 when Portora (now Enniskillen) matched this. Enniskillen finished seventh in an event shortened due to weather in 2017.

Schools’ Head of the River, London (Selected Results; Irish interest; REVISED)

Men, Schools First Eight: 1 Bedford 17 min 15.1 sec; 2 Enniskillen Royal Boat Club (S Balcombe, R Mills, M McBrien, P Murphy, O Donaghy, J McDade, J Kennedy, N Timoney; cox: R Farragher) 17:18.4; 16 Methodist, Belfast A 19:10.2

First Junior 16 Eight: 9 Methody 19:44.4. 

Sculling, Quadruple – Championship: 17 Methody 19:15.6.

Women, Schools First Eight: 1 Enniskillen RBC (T McComb, A Corry, V Wilson, C Leonard, Z McCutcheon, M Donnelly, J Long; C Fee; cox: S Dolan) 19:01.3; 13 Methody 21:49.7.

 

Published in Rowing

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.