Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: HSS Festive Sailings

#HSSresumes – Stena Line sailings will resume on the Dun Laoghaire-Holyhead route for the Christmas Season and early New Year period. The HSS fast-craft Stena Explorer returns to service having ceased summer sailings in early September.

Stena Explorer will sail over the Christmas period on the following dates, December 20th, 21st, 22nd, 23rd, 24th, 27th, 28th, 29th, 30th and in January on the 2nd, 3rd, 4th and 5th.

Crossing times on the Ireland-Wales route takes 2 hours and 20 minutes. A single round trip is made on each of the selected sailings dates. For further information, including the sailing schedule, visit the Stena Line website HERE.

 

Published in Ferry

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.