Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: HMS Victory

Scientists have discovered that a replica of the figurehead from the warship Admiral Nelson commanded in the Battle of Trafalgar dates from just years after the event.

Unfortunately, the 10-foot-tall sculpture was cut up by chainsaw into six pieces more than a decade ago under the mistaken belief it was a modern recreation, as the Independent reports.

Experts working with the National Museum of the Royal Navy, which took stewardship of all material related to HMS Victory from the UK’s Ministry of Defence in 2012, took another look at the destroyed sculpture two years ago.

And they discovered that it was actually made in 1815 as a replacement for the original that suffered damage during that key naval battle of the Napoleonic Wars in 1805.

Now its remnants are set to be displayed to the public for the first time alongside the surviving HMS Victory in Portsmouth, once pandemic restrictions allow.

The Independent has more on the story HERE.

Published in News Update

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.