Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Administors

Administrators of the Harland and Wolff shipyard, reports BBC News, say they have received a number of non-binding offers to buy the business as a going concern.

The yard, best known for building the Titanic, was placed into administration earlier this month.

Administrators, BDO, said there are other interested parties which may result in further offers.

BDO has agreed with the unions to extend the unpaid temporary lay-off of staff until 30 September.

For more on this latest development at the east Belfast yard, click here.

Published in Belfast Lough

Potential bidders, reports Belfast Telegraph, have expressed an interest in buying Harland and Wolff, administrators have confirmed.

Insolvency experts Brian Murphy and Michael Jennings from business advisory firm BDO are now running the business.

On Wednesday the majority of the 123 staff have been able to opt for temporary lay-offs, a move which maintains their employment contracts. However, some have already opted for redundancy.

A spokesperson for BDO said on Friday: "In light of insufficient funds to cover the current running costs of the business and in the absence of any other funds being available at this point, in conjunction with Unions, the administrators have agreed to facilitate an unpaid temporary lay-off until Friday 16th August.

The newspaper here has more on the story. 

Published in Belfast Lough

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.