Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: ASL Newbuild Latest

#Ports&ShippingReview: Over the last fortnight, Jehan Ashmore has reported on the shipping scene, where former officers, crew and staff attended a reunion to mark the 30th anniversary of Irish Shipping Ltd, the state company which went into liquidation in 1984.

The Irish Maritime Development Office (IMDO) released figures that showed container shipping volumes, Lo/Lo have risen by 9% in the third quarter of 2014.

Arklow Shipping's fifth out of six B class general cargo 'green' newbuilds, Arklow Brave is to be christened and launched next month at a Dutch shipyard.

French global containership giant, CMA CGM in the third quarter, announced net profit of $201m as cargo volumes reached an all-time high and order for six mega 18,000TEU capacity ships due 2015.

Published in Arklow Shipping

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.