Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Flagship to Fastferry

#Overhauls- Ulysses flagship of Irish Ferries departed today fresh from annual overhaul having dry-docked at Cammel Laird, Birkenhead on Merseyside, writes Jehan Ashmore.

From Birkenhead the 50,000 gross tonnage Ulysses the 1,875 passenger/ 1,342 car capacity giant proceeded in the early hours along the north Wales coast to Holyhead. The repositioning passage is understood to have almost taken seven hours with an arrival at Anglesey just after 08.00hrs.

Currently occupying a dry-dock of the Merseyside facility is that of Dublin-Holyhead fleetmate, high-speed craft HSC Jonathan Swift. The 800 passenger/200 cars fastferry is also undergoing routine maintenance work. Launched in 1999 as an Austal built Auto Express 86m fastcraft ferry in Fremantle Australia, the 5,000 tonnes catamaran is the only such type of vessel operating between Ireland and the UK.

For almost two decades the ‘Dublin Swift’ as she is marketed has been the workhorse of the Irish Sea operating on the 1 hour 49 minute crossing. Each crossing is at 40knots /80kph on the 60 nautical miles / 111 Kms route which totals annually to an impressive 162,000 Kms.

There is another fastcraft, Manannan but this ferry only operates between the Isle of Man and Liverpool and seasonal calls elsewhere to include Dublin Port.

Providing sailing coverage whilst Ulysses was off service and now that of Jonathan Swift fast is that of Isle of Inishmore which in recent weeks was transferred from Rosslare-Pembroke. The cruiseferry having taken the roster of Ulysses. This is set to change as Ulysses resumes on an afternoon crossing bound to Dublin, permitting Isle of Inishmore to also receive attention of annual overhaul.

Taking her place on the Rosslare-Pembroke service since late last year so to cover demands of seasonal capacity on the busy Dublin route, is Oscar Wilde which does not sail at this time of year to France. The cruiseferry however is to resume service with a crossings from the Wexford port to Cherbourg beginning in March.

Returning to the Dublin-Holyhead route which is also operated by ropax Epsilon. As previously reported on Afloat, the chartered Italian flagged ferry made her first sailing of 2017 on the weekend round trip Dublin-Cherbourg connection.

 

Published in Ferry

About Warrenpoint Port

The Original Port of Warrenpoint was constructed in the late 1770s and acted as a lightering port for the much larger Port of Newry.

Following the demise of Newry Port Warrenpoint Harbour Authority was created as a Trust Port by legislation in 1971. The modern Port was completed in 1974 when it covered 28 acres. Since then the port has expanded to its current size of approximately 53 Acres. The Authority has just completed a £22 Million capital infrastructure project (under the terms of a Service of General Economic Interest with the Department for Regional Development) that includes, the construction of a 300 Metres of Deep Water Quay (7.5 Metres C.D), new Ro-Ro berthing facilities, additional lands and covered storage facilities and a new 100 Tonne mobile crane.

  • Warrenpoint Port is the second largest port in Northern Ireland and the fifth-biggest on the island of Ireland.
  • Warrenpoint Harbour Authority was created as a Trust Port by legislation in 1971.
  • In 2018, the value of goods moving through Warrenpoint Port was £6.5 billion. The Port handled 3.56 million tonnes in 2017, increasing to 3.6m in 2018.
  • The port employs 70 staff directly and supports over 1,500 in the local economy.
  • In addition to serving the markets in Great Britain and the Republic of Ireland, the Port deals with imports and exports from countries and regions across the world including to Spain, Italy, Sweden, Belgium, Germany, Ukraine and the Americas.