Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: J24 Eastern Championshiup

Flor O’Driscoll, who recently retained his J24 National title and won Class 3 in the Dublin Bay Challenge, added to his season’s haul of trophies by winning the Malahide Marina-sponsored J24 Eastern Championships hosted by Malahide Yacht Club last weekend.

Something of a dress rehearsal for Irish entries in next week’s BMW J24 Europeans at Howth, the second day of the event was hampered by bad weather which prevented racing. Four good races on the Saturday however, with courses set by PRO Neil Murphy, produced competitive racing with four different race winners.

‘Hard on Port’ (Flor O’Driscoll, HYC) had a 3, 4, 1, 3 scoreline, giving him a one point advantage over second-placed ‘Crazy Horse’ (Mossy Shanahan, HYC) who edged out ‘Jibberish’ (O’Kelly/Wormald/Walsh, HYC) on count-back.

Malahide Marina J24 Eastern Championship results:

  1. Hard on Port       Flor O’Driscoll      HYC           11 points
  2. Crazy Horse        Mossy Shanahan HYC           12 points
  3. Jibberish            O’Kelly etc          HYC           12 points
  4. Sayonara           Murphy/Darrer    HYC           14 points
  5. Jeb Stuart          Andrew Mannion  LRYC         17 points
  6. Scandal             Brian McDowell   MYC          18 points

 

Published in J24

Shannon Foynes Port Information

Shannon Foynes Port (SFPC) are investing in an unprecedented expansion at its general cargo terminal, Foynes, adding over two-thirds the size of its existing area. In the latest phase of a €64 million investment programme, SFPC is investing over €20 million in enabling works alone to convert 83 acres on the east side of the existing port into a landbank for marine-related industry, port-centric logistics and associated infrastructure. The project, which will be developed on a phased basis over the next five years, will require the biggest infrastructure works programme ever undertaken at the port, with the entire 83 acre landbank having to be raised by 4.4 metres. The programme will also require the provision of new internal roads and multiple bridge access as well as roundabout access.