Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Inis Ealga Marine Energy Park

Volunteer coastal cleaners in East Cork have gained the support of the joint venture behind a new proposed offshore wind farm project to boost their efforts in tackling the scourge of marine litter on the Irish coast.

As the Irish Examiner reports, Clean Coasts Ballynamona have inked a sponsorship deal with the Inis Ealga Marine Energy Park which will enable them to purchase a boat and other equipment to expand their abilities to clean and protect some 80km of coastline.

Clean Coasts Ballynamon comprise more than 300 volunteers who do regular beach cleans — and also manage 34 acres of coastal habitat to promote biodiversity in East Cork.

The Irish Examiner has more on the story HERE.

Published in Coastal Notes

DP Energy Ireland Ltd is undertaking geophysical surveys at the proposed Inis Ealga Marine Energy Park off Cork and Waterford, outside the 12-nautical-mile limit.

Works were set to begin on Friday 2 September and last for five days, subject to weather, carried out from the ILV Granuaile (callsign EIPT) on a 24-hour basis.

The reconnaissance geophysical survey is being performed using a hull-mounted multibeam echosounder (MBES) and towed seismic system (maximum towed length 60m), running widely spaced lines across the array investigation area.

Communication on marine band radio VHF Channel 16 will be conducted with other ships and vessels to notify them of the operations.

In addition, ILV Granuaile is restricted in its ability to manoeuvre during this operations and will display appropriate shapes and lights. All other vessels operating within this area are requested to keep their distance and pass at a minimum speed to reduce vessel wash.

Coordinates and a map of the survey area as well as contact details are included in Marine Notice No 60 of 2022, attached below.

DP Energy, one of Ireland’s leading developers of renewable energy projects, is planning to carry out a geophysical survey beyond the 12 nautical mile limit at their proposed Inis Ealga Marine Energy Park off the coasts of Cork and Waterford.

The survey, which will cover approximately 900 Km2, will begin on 8th September and will take place for a period of five days. The work will be undertaken by Hydrographic Surveys of Crosshaven onboard the Commissioners of Irish Lights vessel, ILV Granuaile, a multifunctional ship which is equipped to operate in difficult sea conditions.

The Inis Ealga Marine Energy Park is a 1,000 MW (1GW) offshore wind project which will use floating platform technology anchored to the seabed. Once operational, the proposed wind farm will generate enough clean renewable energy to power the equivalent of nearly one million homes. Delivery of this scheme, planned to be operational by 2030, will significantly contribute to Ireland’s Climate Action Plan target of 7 Gigawatts of offshore wind energy by 2030 and the longer-term target of net-zero emissions by 2050.

To develop the Inis Ealga Marine Energy Park project, DP Energy has partnered with global energy leader Iberdrola, one of the world’s largest renewable energy producers. Iberdrola has substantial experience in offshore wind development and, importantly, shares DP Energy’s commitment to a sustainable and ethical approach to development.

The upcoming survey of the Inis Ealga Marine Park location will provide valuable information on the make-up of the seabed and this will be used to inform the project design, siting of turbines and construction methods for the proposed park. The results will also assist in the preparation of specifications for additional future geophysical and geotechnical surveys.

Adam Cronin, Head of Offshore at DP Energy, outlines the processes that will be used:

“The equipment we are planning to use includes a hull mounted multibeam sonar and sub bottom profiler. This survey will provide information about the seabed make-up at various depths. We will be able to image the sediment and rock layers beneath the surface of the seabed giving us crucial information on sediment layers for design. The data obtained from the surveys will be utilised in the design of the project and the design will be in the public domain as part of the Development Consenting process.”

Commenting on the announcement Dave Ward, Commercial Manager at Commissioner of Irish Lights said: “Granuaile is a key asset of Irish Lights in delivery of its navigation safety service around the coast of Ireland. Irish Lights can provide a range of services, statutory and commercial to support local partners in the transition to offshore renewable energy. We are pleased to support DP Energy to enable and harness Irish natural resources in offshore wind, in order to drive the establishment of an indigenous Irish supply chain while underpinning marine based employment.”

Headquartered in Buttevant in North Cork and operating across the world, DP Energy is committed to using the most sustainable and environmentally responsible methods in all of their energy developments. Currently, DP Energy has a 5,000+ megawatt (MW) portfolio of wind, ocean and solar energy projects in development stages across Ireland, Australia, the UK and Canada.

In addition to the Inis Ealga project, DP Energy, in conjunction with Iberdrola, has also submitted Foreshore Licence applications for Clarus Offshore Wind Farm, off the coasts of Clare and Kerry (floating) and Shelmalere Offshore Wind Farm, off the coasts of Wicklow and Wexford (fixed).

Published in Power From the Sea

Port of Cork Information

The Port of Cork is the key seaport in the south of Ireland and is one of only two Irish ports which service the requirements of all six shipping modes i.e., Lift-on Lift-off, Roll-on Roll-off, Liquid Bulk, Dry Bulk, Break Bulk and Cruise. Due to its favourable location on the south coast of Ireland and its modern deep-water facilities, the Port of Cork is ideally positioned for additional European trading as well as for yet unexploited direct deep-sea shipping services.

The Port of Cork is investing €80 million in a container terminal development in Ringaskiddy. The Cork Container Terminal will initially offer a 360-metre quay with 13-metre depth alongside and will enable larger ships to berth in the port. The development also includes the construction of a 13.5-hectare terminal and associated buildings as well as two ship to shore gantry cranes and container handling equipment.

The development of new container handling facilities at Ringaskiddy was identified in the Port of Cork’s Strategic Development Plan in 2010. It will accommodate current and future container shipping which can be serviced by modern and efficient cargo handling equipment with innovative terminal operating and vehicle booking systems. The Port of Cork anticipates that Cork Container Terminal will be operational in 2020.

The Port of Cork is the key seaport in the south of Ireland and is one of just two Irish ports which service the requirements of all shipping modes.

The Port of Cork also controls Bantry Bay Port Company and employs 150 people across all locations.

A European Designated Core Port and a Tier 1 Port of National Significance, Port of Cork’s reputation for quality service, including prompt and efficient vessel turnaround as well as the company’s investment in future growth, ensures its position as a vital link in the global supply chain.

The port has made impressive strides in recent decades, most recently with the construction of the new €80m Cork Container Terminal in Ringaskiddy which will facilitate the natural progression of the move from a river port to a deepwater port in order to future proof the Port
of Cork. This state-of-the-art terminal which will open in 2020 will be capable of berthing the largest container ships currently calling to Ireland.

The Port of Cork Company is a commercial semi-state company responsible for the commercial running of the harbour as well as responsibility for navigation and berthage in the port.  The Port is the main port serving the South of Ireland, County Cork and Cork City. 

Types of Shipping Using Port of Cork

The Port offers all six shipping modes from Lift-on Lift-off, Roll-on Roll-off, Liquid Bulk, Dry Bulk, Break Bulk and Cruise liner traffic.

Port of Cork Growth

The port has made impressive strides in recent decades. Since 2000, the Port of Cork has invested €72 million in improving Port infrastructure and facilities. Due to its favourable location and its modern deepwater facilities, the Port is ideally positioned for additional European trading as well as for yet unexploited direct deep-sea shipping services. A well-developed road infrastructure eases the flow of traffic from and to the port. The Port of Cork’s growing reputation for quality service, including prompt and efficient vessel turnaround, ensures its position as a vital link in the global supply chain. The Port of Cork Company turnover in 2018 amounted to €35.4 million, an increase of €3.9 million from €31.5 million in 2017. The combined traffic of both the Ports of Cork and Bantry increased to 10.66 million tonnes in 2018 up from 10.3 million tonnes in 2017.

History of Port of Cork

Famous at the last port of call of the Titanic, these medieval navigation and port facilities of the city and harbour were historically managed by the Cork Harbour Commissioners. Founded in 1814, the Cork Harbour Commissioners moved to the Custom House in 1904.  Following the implementation of the 1996 Harbours Act, by March 1997 all assets of the Commissioners were transferred to the Port of Cork Company.

Commercial Traffic at Port of Cork

Vessels up to 90,000 tonnes deadweight (DWT) are capable of coming through entrance to Cork Harbour. As the shipping channels get shallower the farther inland one travels, access becomes constricted, and only vessels up to 60,000 DWT can sail above Cobh. The Port of Cork provides pilotage and towage facilities for vessels entering Cork Harbour. All vessels accessing the quays in Cork City must be piloted and all vessels exceeding 130 metres in length must be piloted once they pass within 2.5 nautical miles (4.6 km) of the harbour entrance.

Berthing Facilities in Cork Harbour

The Port of Cork has berthing facilities at Cork City, Tivoli, Cobh and Ringaskiddy. The facilities in Cork City are primarily used for grain and oil transport. Tivoli provides container handling, facilities for oil, livestock and ore and a roll on-roll off (Ro-Ro) ramp. Prior to the opening of Ringaskiddy Ferry Port, car ferries sailed from here; now, the Ro-Ro ramp is used by companies importing cars into Ireland. In addition to the ferry terminal, Ringaskiddy has a deep water port.

Port of Cork Development Plans

2020 will be a significant year for the Port of Cork as it prepares to complete and open the €86 million Cork Container Terminal development in Ringaskiddy.

Once operational the new terminal will enable the port to handle up to 450,000 TEU per annum. Port of Cork already possess significant natural depth in Cork harbour, and the work in Ringaskiddy Port will enable the Port of Cork to accommodate vessels of 5500 to 6000 TEU, which will provide a great deal of additional potential for increasing container traffic.

It follows a previous plan hatched in 2006 as the port operated at full capacity the Port drew up plans for a new container facility at Ringaskiddy. This was the subject of major objections and after an Oral Planning Hearing was held in 2008 the Irish planning board Bord Pleanala rejected the plan due to inadequate rail and road links at the location.  

Further notable sustainability projects also include:

  • The Port of Cork have invested in 2 x STS cranes – Type single lift, Model P (148) L, (WS) Super. These cranes contain the most modern and energy-efficient control and monitoring systems currently available on the market and include an LED floodlight system equipped with software to facilitate remote diagnostics, a Crane Management System (CMS) and an energy chain supply on both cranes replacing the previous preferred festoon cabling installation.
  • The Port of Cork has installed High Mast Lighting Voltage Control Units at its two main cargo handling locations – Tivoli Industrial & Dock Estate and Ringaskiddy Deep-water & Ferry Terminals. This investment has led to more efficient energy use and reduced risk of light pollution. The lights can also be controlled remotely.
  • The Port of Cork’s largest electrical consumer at Tivoli Container Terminal is the handling and storage of refrigerated containers. Local data loggers were used to assess energy consumption. This provided timely intervention regarding Power Factor Correction Bank efficiency on our STS (Ship to Shore) Cranes and Substations, allowing for reduced mains demand and reducing wattless energy losses along with excess charges. The information gathered has helped us to design and build a reefer storage facility with energy management and remote monitoring included.

Bantry Port

In 2017 Bantry Bay Port Company completed a significant investment of €8.5 million in the Bantry Inner Harbour development. The development consisted of a leisure marina, widening of the town pier, dredging of the inner harbour and creation of a foreshore amenity space.

Port of Cork Cruise Liner Traffic

2019 was a record cruise season for the Port of Cork with 100 cruise liners visiting. In total over 243,000 passengers and crew visited the region with many passengers visiting Cork for the first time.

Also in 2019, the Port of Cork's Cruise line berth in Cobh was recognised as one of the best cruise destinations in the world, winning in the Top-Rated British Isles & Western Europe Cruise Destination category. 

There has been an increase in cruise ship visits to Cork Harbour in the early 21st century, with 53 such ships visiting the port in 2011, increasing to approximately 100 cruise ship visits by 2019.

These cruise ships berth at the Port of Cork's deepwater quay in Cobh, which is Ireland's only dedicated berth for cruise ships.

Passenger Ferries

Operating since the late 1970s, Brittany Ferries runs a ferry service to Roscoff in France. This operates between April and November from the Ro-Ro facilities at Ringaskiddy. Previous ferry services ran to Swansea in Wales and Santander in Spain. The former, the Swansea Cork ferry, ran initially between 1987 and 2006 and also briefly between 2010 and 2012.

The latter, a Brittany Ferries Cork–Santander service, started in 2018 but was cancelled in early 2020.

Marine Leisure

The Port of Cork has a strategy that aims to promote the harbour also as a leisure amenity. Cork’s superb natural harbour is a great place to enjoy all types of marine leisure pursuits. With lots of sailing and rowing clubs dotted throughout the harbour, excellent fishing and picturesque harbour-side paths for walking, running or cycling, there is something for everyone to enjoy in and around Cork harbour. The Port is actively involved with the promotion of Cork Harbour's annual Festival. The oldest sailing club in the world, founded in 1720, is the Royal Cork Yacht Club is located at Crosshaven in the harbour, proof positive, says the Port, that the people of Cork, and its visitors, have been enjoying this vast natural leisure resource for centuries. 

Port of Cork Executives

  • Chairman: John Mullins
  • Chief Executive: Brendan Keating
  • Secretary/Chief Finance Officer: Donal Crowley
  • Harbour Master and Chief Operations Officer: Capt. Paul O'Regan
  • Port Engineering Manager: Henry Kingston
  • Chief Commercial Officer: Conor Mowlds
  • Head of Human Resources: Peter O'Shaughnessy