Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Dublin Array

The Department of Transport has been advised by Dublin Array that they will be conducting geophysical, geotechnical and environmental surveys for the Dublin Array offshore wind farm project.

Site investigation operations for the wind farm and the Expert Corridor Route (ECR) between the coast of Dublin and Wicklow will take place between Friday 19 April and the end of July, subject to weather and operational constraints.

The geophysical survey will be carried out by the vessel Fugro Helmert (callsign C6FT8). During these operations, the vessel will be towing equipment at a depth of up to five metres below the surface and extending some 300 metres astern.

The geotechnical survey will be carried out by the vessel M/V Flat Holm (callsign GHLZ) at fixed stations. The environmental survey will be carried out by the vessel Ros Áine (callsign EIZG5) in daytime hours only.

All vessels will be mobilised from Dun Laoghaire and will be restricted in their ability to manoeuvre, therefore all other mariners are advised to provide a wide berth and navigate with caution in the relevant area.

Coordinates and a map of the survey area, as well as contact details, can be found in Marine Notice No 18 of 2024, attached below.

Published in Power From the Sea

RWE Renewables Ireland has appointed Vanessa O’Connell as its new Development Project Director for the Dublin Array offshore wind farm.

Dublin Array is a proposed 824MW offshore wind farm, which will be located about 10 kilometres from the coast of counties Dublin and Wicklow.

Vanessa replaces Peter Lefroy, who has been leading the project since 2018, while also being the Offshore Development Head for Ireland. Peter will continue in his role as Offshore Development Head of RWE Ireland & UK West.

Vanessa brings more than 12 years of experience in leadership in the offshore wind sector to RWE. She has worked across all stages of offshore wind projects, encompassing development, construction, and operations, with involvement in nine offshore wind projects.

Vanessa spent over ten years at Ørsted, working on projects such as Hornsea 1 (1.2GW), Burbo Bank Extension (258MW), Walney Extension (659MW), and Barrow (90MW). On Hornsea 1, Vanessa held leadership positions in the commercial function, served on the construction leadership team, and assumed overall accountability for the asset during its transition to the operational phase.

Returning to Ireland over two years ago, Vanessa assumed the role as Head of Inis Offshore Wind. This independent offshore wind developer, backed by Temporis and the Ireland Strategic Investment Fund, focuses on early stage development in Ireland.

Vanessa holds an MSc in Environmental Technology from Imperial College London and a BA in Economics from Trinity College Dublin. She lives in Dun Laoghaire with her husband and two daughters.

Commenting on the appointment, RWE Director of Offshore Development UK & Ireland Danielle Lane said:

“I’m delighted that Vanessa has chosen to join RWE and Dublin Array. Her skills and experience in working in offshore wind will make a great contribution to the project at an important time. Dublin Array is a flagship project in the Irish offshore wind market and Vanessa is joining a strong, established team that will thrive under her leadership.”

Dublin Array

Dublin Array is a proposed offshore wind farm, which will be located on the Kish and Bray Banks, approximately 10km from the coastline of counties Dublin and Wicklow. It is being developed by RWE, one of the world’s leading developers of renewable energy, and Irish renewable energy firm Saorgus Energy. RWE is leading the development on behalf of the partnership.

Once operational, the project will deliver up to 824MW of clean, renewable electricity and will consist of up to 50 wind turbines. This is enough energy to supply around 770,000 homes and reduce Ireland’s annual carbon emissions by over 1.4m tonnes per year. The final decision on the number of turbines will be informed by ongoing surveys and detailed design work.

The Dublin Array project will also bring significant economic benefits during its construction and operation, with over 1,000 construction phase jobs and 80 direct and 160 indirect full-time jobs expected during the 30-year operational phase. Dublin Array’s operations base is expected to be located within Dún Laoghaire, resulting in an estimated €540 million in local expenditure across the Greater Dublin Area.

Dublin Array was awarded its Maritime Area Consent (MAC) in December 2022. A MAC is required for any proposed Irish offshore wind farm development to be able to seek planning permission. Subject to planning permission, the project could be operational by 2028.

Published in Power From the Sea
Tagged under

Kish Offshore Wind Ltd and Bray Offshore Wind Ltd will be conducting geotechnical investigations on the Dublin Array project site and associated export cable corridor off the coast of counties Dublin and Wicklow from later this month.

The geotechnical investigations will include 27 vibrocores which will be sampled at locations within the offshore wind farm site. Project works will commence on Saturday 29 April and continue through to late May, subject to weather and operational constraints.

Investigations will be conducted within the Kish lease area, Bray lease area and the expert cable corridor, all of which are off the coast of counties Dublin and Wicklow.

Operations will be conducted by the multipurpose vessel Voe Vanguard (callsign MBEN9). The vessel will be positioned at each of the investigation points for approximately two hours, which may extend in the event of inclement weather.

The vessel is supplied with a VHF multi-channel radio and mobile phone. It will be operating 24 hours a day during the survey works and will display relevant lights and shapes as required under COLREGS.

All other vessels operating within the planned area of survey are requested to keep their distance and give a wide berth wherever possible.

Contact details, a map and coordinates of the survey area can be found in Marine Notice No 24 of 2023, attached below.

Published in Power From the Sea

The Department of Transport has been advised by Kish Offshore Wind Ltd and Bray Offshore Wind Ltd that geotechnical investigations will be conducted on the Dublin Array offshore wind farm project site off the coast of counties Dublin and Wicklow.

The project works will commence next Saturday 1 April and continue through to late May 2023, subject to weather and operational constraints.

The geotechnical investigation will include approximately seven boreholes which will be drilled at locations within the project work site.

Operations will be conducted by the Dutch Pearl (callsign PBZP), a support vessel/tug, and the Excalibur (callsign YJKQ5), a jack-up barge.

The Excalibur will be positioned at each of the investigation points for several days which may extend in the event of inclement weather. The Dutch Pearl will be assisting the Excalibur in its daily operations and towing the barge between investigation points. The standby tug will be at anchor on the project site and will be conducting transits between the site and Dublin Port.

Both vessels will display the relevant light and shapes as required under COLREGS. Both vessels will keep continuous watch on VHF Channels 16 and 72. During operations, the vessels will be restricted in their ability to manoeuvre. All other vessels are requested to leave a wide berth during the operations.

Contact details, relevant coordinates and a map of the work area ca be found in Marine Notice No 16 of 2023, attached below.

Published in Power From the Sea

Marine Notices No 37 of 2021 and No 44 of 2021 advised of the deployment of two wave buoys and one floating LiDAR buoy at the Dublin Array offshore wind farm on the Bray and Kish Banks.

The two wave buoys were recovered from site in June 2022. Now the Department of Transport has now been advised by Partrac Ltd that the floating LiDAR buoy on Bray Bank is scheduled to be recovered in the period between Thursday 5 and Thursday 19 January 2023, subject to weather and operational constraints.

The floating LiDAR buoy at Latitude 53° 10.645’ N, Longitude 005° 55.785' W has a square footprint with an area of 4 sqm and height of around 4m above the water line. It is yellow in colour and has a St Andrew cross on top.

It also contains a yellow light which emits five flashes every 20 seconds and is visible for up to three nautical miles.

The vessel CT Barnston (callsign MUZU5) will recover the buoy and tow it back to Wicklow Harbour for demobilisation. Dublin Port will be contacted in advance regarding the operations with estimated timings. The buoy will be towed some 30m astern of the CT Branston at a maximum speed of 3.5 knots.

During recovery of the floating LiDAR buoy on Bray Bank, the vessel will be restricted in its ability to manoeuvre. All other vessels are requested to leave a wide berth during the recovery and towing operations. Radio transmissions will be conducted with VTS and other seafarers to notify them of the buoy operations.

Contact details can be found in Marine Notice No 85 of 2022, attached below.

Published in Power From the Sea

Marine Notice 37 of 2021 advised of the deployment of one floating lidar buoy and two wave buoys at the Dublin Array offshore wind farm on the Bray and Kish Banks.

The Department of Transport has now been advised by Partrac Ltd that all three Metocean buoys are scheduled to be serviced soon over a period of two days.

Weather permitting, it is expected that the two wave buoys will be recovered and redeployed in the three-week period between tomorrow, Friday 11 February and Friday 4 March.

The floating lidar buoy will be towed from its location on Bray Bank to Wicklow Harbour for routine maintenance overnight and towed back to Bray Bank for redeployment in its current position. This recovery and redeployment will take place in the three-week period between Thursday 24 February 2022 and Friday 18 March.

The AMS Retriever (callsign MEHI8) will recover and redeploy all three buoys. The floating lidar buoy will be towed some 30 metres astern of the AMS Retriever at a maximum speed of 3.5 knots.

During this time, the vessel will be restricted in its ability to manoeuvre. As such, vessels operating within this area are requested to keep their distance, maintaining a safety zone around the deployment vessel, and pass at minimum speed to reduce vessel wash.

Radio transmissions will be conducted with VTS and other seafarers to notify them of the buoy operations.

Coordinates of the buoy locations and contact details can be found in Marine Notice No 10 of 2022, attached below.

Published in News Update

Following the Marine Notice two months ago on the deployment of wave buoys and a floating lidar buoy at the Dublin Array offshore wind farm, a new notice has been issued regarding the lidar buoy’s move to a fixed position.

Partrac Ltd will relocate the floating lidar buoy from its current temporary position at Kish Lighthouse to a new location in Bray Bank some time between this Wednesday 4 August and Tuesday 17 August, weather permitting.

The relocation is expected to take one day. The buoy will then remain in place for 18 months and a further Marine Notice will be issued providing information on the retrieval of the buoy.

The AMS Retriever (callsign MEHI8) will recover the buoy and tow it to its new location. During this work, the vessel will be restricted in its ability to manoeuvre.

As such, all other vessels operating within this area are requested to keep their distance, maintaining a safety zone around the AMS Retriever, and to pass at minimum speed to reduce vessel wash.

Further details including coordinates of the buoy’s new location are included in Marine Notice No 44 of 2021, which can be downloaded below.

Published in News Update

Partrac Ltd intend to deploy three Metocean buoys at the Dublin Array offshore wind farm in a one-day operation some time between this Wednesday 9 and Wednesday 23 June, weather permitting.

One floating lidar buoy and two wave buoys will be deployed by the AMS Retriever (callsign MEHI8) which will be displaying all appropriate lights and shapes.

The floating lidar buoy has a square footprint with an area of 4m2 and a height of some 4m above the water line. It is yellow in colour and has a St Andrew’s cross on top.

The wave buoys are spherical in shape with a diameter of around 1.1m. When deployed, the wave buoys appear clear with a yellow hull.

Both the floating lidar buoy and the wave buoys have a yellow light which emits five flashes every 20 seconds. The light is visible for up to three nautical miles.

The floating lidar buoy will be deployed for a period of four to eight weeks. It will then be moved to a permanent position in the south end of Dublin Array where it will be deployed for 18 months. The wave buoys will be deployed for a period of 12 months.

The floating lidar buoy will be towed approximately 30m astern of the AMS Retriever at a maximum speed of four knots.

As such, the vessel will be restricted in its ability to manoeuvre so all other boats operating in proximity are requested to keep their distance, maintaining a safety zone around the deployment vessel and pass at minimum speed to reduce vessel wash.

Details of the buoy locations are included in Marine Notice No 37 of 2021 which can be downloaded below.

Published in News Update

Mariners have been given notice of a series of geophysical surveys for the Dublin Array Wind Farm taking place between next week and early May.

The Dublin Array is a project on the Kish and Bray banks some 10 km off the east coast of Ireland, immediately south of Dublin.

As previously reported on Afloat.ie, the proposed Irish-German venture could see as many as 100 wind turbines generate power for more than half a million homes.

Fugro GB Marine Limited has been contracted for the geophysical surveys to characterise the offshore array and export cable search area, including exploring possible landfall options at Shanganagh Park and Poolbeg.

Operations across a total of four vessels are expected to begin next Tuesday 9 February and continue until Tuesday 11 May.

Details of the surveys and their coordinates are included in Fugro’s notice to mariners, which can be downloaded below.

Published in Dublin Bay

A €1.5 billion offshore wind farm stretching from Booterstown to Greystones could generate enough electricity to power 600,000 homes.

The Irish Times reports on proposals by an Irish-German partnership for the ‘Dublin Array’ offshore energy venture that could see as many as 100 wind turbines installed over 2,440 hectares, partly in Dublin Bay.

Saorgus and Innogy are now seeing a foreshore licence to conduct surveys in the intended locations of the Kish Bank and Bray Bank.

Pledges have been made to work with shipping companies, fishing interests, sailing clubs and other water users during this process, as the venture promises a “meaningful approach to supporting local communities”.

It is also hoped that the project would benefit from new Government supports guaranteeing revenue for renewable energy generators, a scheme which is currently under EU scrutiny.

The Irish Times has much more on the story HERE.

Published in Dublin Bay
Page 1 of 2

Port of Cork Information

The Port of Cork is the key seaport in the south of Ireland and is one of only two Irish ports which service the requirements of all six shipping modes i.e., Lift-on Lift-off, Roll-on Roll-off, Liquid Bulk, Dry Bulk, Break Bulk and Cruise. Due to its favourable location on the south coast of Ireland and its modern deep-water facilities, the Port of Cork is ideally positioned for additional European trading as well as for yet unexploited direct deep-sea shipping services.

The Port of Cork is investing €80 million in a container terminal development in Ringaskiddy. The Cork Container Terminal will initially offer a 360-metre quay with 13-metre depth alongside and will enable larger ships to berth in the port. The development also includes the construction of a 13.5-hectare terminal and associated buildings as well as two ship to shore gantry cranes and container handling equipment.

The development of new container handling facilities at Ringaskiddy was identified in the Port of Cork’s Strategic Development Plan in 2010. It will accommodate current and future container shipping which can be serviced by modern and efficient cargo handling equipment with innovative terminal operating and vehicle booking systems. The Port of Cork anticipates that Cork Container Terminal will be operational in 2020.

The Port of Cork is the key seaport in the south of Ireland and is one of just two Irish ports which service the requirements of all shipping modes.

The Port of Cork also controls Bantry Bay Port Company and employs 150 people across all locations.

A European Designated Core Port and a Tier 1 Port of National Significance, Port of Cork’s reputation for quality service, including prompt and efficient vessel turnaround as well as the company’s investment in future growth, ensures its position as a vital link in the global supply chain.

The port has made impressive strides in recent decades, most recently with the construction of the new €80m Cork Container Terminal in Ringaskiddy which will facilitate the natural progression of the move from a river port to a deepwater port in order to future proof the Port
of Cork. This state-of-the-art terminal which will open in 2020 will be capable of berthing the largest container ships currently calling to Ireland.

The Port of Cork Company is a commercial semi-state company responsible for the commercial running of the harbour as well as responsibility for navigation and berthage in the port.  The Port is the main port serving the South of Ireland, County Cork and Cork City. 

Types of Shipping Using Port of Cork

The Port offers all six shipping modes from Lift-on Lift-off, Roll-on Roll-off, Liquid Bulk, Dry Bulk, Break Bulk and Cruise liner traffic.

Port of Cork Growth

The port has made impressive strides in recent decades. Since 2000, the Port of Cork has invested €72 million in improving Port infrastructure and facilities. Due to its favourable location and its modern deepwater facilities, the Port is ideally positioned for additional European trading as well as for yet unexploited direct deep-sea shipping services. A well-developed road infrastructure eases the flow of traffic from and to the port. The Port of Cork’s growing reputation for quality service, including prompt and efficient vessel turnaround, ensures its position as a vital link in the global supply chain. The Port of Cork Company turnover in 2018 amounted to €35.4 million, an increase of €3.9 million from €31.5 million in 2017. The combined traffic of both the Ports of Cork and Bantry increased to 10.66 million tonnes in 2018 up from 10.3 million tonnes in 2017.

History of Port of Cork

Famous at the last port of call of the Titanic, these medieval navigation and port facilities of the city and harbour were historically managed by the Cork Harbour Commissioners. Founded in 1814, the Cork Harbour Commissioners moved to the Custom House in 1904.  Following the implementation of the 1996 Harbours Act, by March 1997 all assets of the Commissioners were transferred to the Port of Cork Company.

Commercial Traffic at Port of Cork

Vessels up to 90,000 tonnes deadweight (DWT) are capable of coming through entrance to Cork Harbour. As the shipping channels get shallower the farther inland one travels, access becomes constricted, and only vessels up to 60,000 DWT can sail above Cobh. The Port of Cork provides pilotage and towage facilities for vessels entering Cork Harbour. All vessels accessing the quays in Cork City must be piloted and all vessels exceeding 130 metres in length must be piloted once they pass within 2.5 nautical miles (4.6 km) of the harbour entrance.

Berthing Facilities in Cork Harbour

The Port of Cork has berthing facilities at Cork City, Tivoli, Cobh and Ringaskiddy. The facilities in Cork City are primarily used for grain and oil transport. Tivoli provides container handling, facilities for oil, livestock and ore and a roll on-roll off (Ro-Ro) ramp. Prior to the opening of Ringaskiddy Ferry Port, car ferries sailed from here; now, the Ro-Ro ramp is used by companies importing cars into Ireland. In addition to the ferry terminal, Ringaskiddy has a deep water port.

Port of Cork Development Plans

2020 will be a significant year for the Port of Cork as it prepares to complete and open the €86 million Cork Container Terminal development in Ringaskiddy.

Once operational the new terminal will enable the port to handle up to 450,000 TEU per annum. Port of Cork already possess significant natural depth in Cork harbour, and the work in Ringaskiddy Port will enable the Port of Cork to accommodate vessels of 5500 to 6000 TEU, which will provide a great deal of additional potential for increasing container traffic.

It follows a previous plan hatched in 2006 as the port operated at full capacity the Port drew up plans for a new container facility at Ringaskiddy. This was the subject of major objections and after an Oral Planning Hearing was held in 2008 the Irish planning board Bord Pleanala rejected the plan due to inadequate rail and road links at the location.  

Further notable sustainability projects also include:

  • The Port of Cork have invested in 2 x STS cranes – Type single lift, Model P (148) L, (WS) Super. These cranes contain the most modern and energy-efficient control and monitoring systems currently available on the market and include an LED floodlight system equipped with software to facilitate remote diagnostics, a Crane Management System (CMS) and an energy chain supply on both cranes replacing the previous preferred festoon cabling installation.
  • The Port of Cork has installed High Mast Lighting Voltage Control Units at its two main cargo handling locations – Tivoli Industrial & Dock Estate and Ringaskiddy Deep-water & Ferry Terminals. This investment has led to more efficient energy use and reduced risk of light pollution. The lights can also be controlled remotely.
  • The Port of Cork’s largest electrical consumer at Tivoli Container Terminal is the handling and storage of refrigerated containers. Local data loggers were used to assess energy consumption. This provided timely intervention regarding Power Factor Correction Bank efficiency on our STS (Ship to Shore) Cranes and Substations, allowing for reduced mains demand and reducing wattless energy losses along with excess charges. The information gathered has helped us to design and build a reefer storage facility with energy management and remote monitoring included.

Bantry Port

In 2017 Bantry Bay Port Company completed a significant investment of €8.5 million in the Bantry Inner Harbour development. The development consisted of a leisure marina, widening of the town pier, dredging of the inner harbour and creation of a foreshore amenity space.

Port of Cork Cruise Liner Traffic

2019 was a record cruise season for the Port of Cork with 100 cruise liners visiting. In total over 243,000 passengers and crew visited the region with many passengers visiting Cork for the first time.

Also in 2019, the Port of Cork's Cruise line berth in Cobh was recognised as one of the best cruise destinations in the world, winning in the Top-Rated British Isles & Western Europe Cruise Destination category. 

There has been an increase in cruise ship visits to Cork Harbour in the early 21st century, with 53 such ships visiting the port in 2011, increasing to approximately 100 cruise ship visits by 2019.

These cruise ships berth at the Port of Cork's deepwater quay in Cobh, which is Ireland's only dedicated berth for cruise ships.

Passenger Ferries

Operating since the late 1970s, Brittany Ferries runs a ferry service to Roscoff in France. This operates between April and November from the Ro-Ro facilities at Ringaskiddy. Previous ferry services ran to Swansea in Wales and Santander in Spain. The former, the Swansea Cork ferry, ran initially between 1987 and 2006 and also briefly between 2010 and 2012.

The latter, a Brittany Ferries Cork–Santander service, started in 2018 but was cancelled in early 2020.

Marine Leisure

The Port of Cork has a strategy that aims to promote the harbour also as a leisure amenity. Cork’s superb natural harbour is a great place to enjoy all types of marine leisure pursuits. With lots of sailing and rowing clubs dotted throughout the harbour, excellent fishing and picturesque harbour-side paths for walking, running or cycling, there is something for everyone to enjoy in and around Cork harbour. The Port is actively involved with the promotion of Cork Harbour's annual Festival. The oldest sailing club in the world, founded in 1720, is the Royal Cork Yacht Club is located at Crosshaven in the harbour, proof positive, says the Port, that the people of Cork, and its visitors, have been enjoying this vast natural leisure resource for centuries. 

Port of Cork Executives

  • Chairman: John Mullins
  • Chief Executive: Brendan Keating
  • Secretary/Chief Finance Officer: Donal Crowley
  • Harbour Master and Chief Operations Officer: Capt. Paul O'Regan
  • Port Engineering Manager: Henry Kingston
  • Chief Commercial Officer: Conor Mowlds
  • Head of Human Resources: Peter O'Shaughnessy