Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: New Hybrid ships

Brittany Ferries is to have two new hybrid LNG-electric ships to enter their fleet when they will arrive in 2024/2025 to serve UK-France routes connecting Portsmouth with St Malo and Caen.

As well as significantly cutting emissions, the hybrids will deliver less noise, less vibration for passengers and a step towards future-proofing the company.

  • Like a hybrid car, the ships will run on gas, battery power or a combination of the two
  • Arriving in 2024/2025, they will replace Bretagne (Portsmouth/ St Malo) and Normandie (Portsmouth/Caen), the oldest ships in the fleet
  • Presenting more cabins (including pet-friendlies), greater freight space and higher capacity for passengers in off-season
  • Ready for plug-in shore-side power: To eliminate emissions during port calls

The ships operate on the same principle as a hybrid car. At sea, they will be powered by cleaner LNG (liquefied natural gas) fuel. But in a first on the English Channel, they will also operate partially or completely on battery power– for example when arriving and departing ports.

Furthermore, they will be ready to plug in to shore-side power when this is available in ports. This will allow recharging of onboard batteries and power for systems like air conditioning, heating and lighting while at berth, cutting funnel emissions to zero.

Fleet renewal – a pillar of Brittany Ferries recovery:

The ships will be chartered from Stena RoRo on a ten-year agreement, with a purchase option after four. They will take the place of Normandie and Bretagne, two grandes dames of the fleet. Designed to better serve freight and passenger traffic, they promise more scope to carry tourists to Normandy and Brittany outside of peak holiday periods.

The move is all part of Brittany Ferries’ fleet renewal plan, one of the pillars of its five-year post-Covid recovery strategy. The vessels will follow introduction of Galicia last year, the deployment of Salamanca in 2022 and Santoña in 2023, both of which will be fuelled by LNG ready to serve UK-Spain routes.

“Fleet renewal is not a choice for Brittany Ferries; it is an imperative to secure our future,” said Christophe Mathieu, CEO Brittany Ferries. “Our customers rightly demand cleaner, greener vessels and our port partners expect us to be good neighbours. Furthermore, we will certainly face tighter regulation in the years ahead. The future of our company depends upon our ability to rise to the challenge today, to prepare for tomorrow. That is why I am so proud to announce these new vessels.”

“They bring with them a host of innovations just as Bretagne and Normandie did when they were launched. Both vessels have served us well and we are grateful for the support of the regions that bear their name. They are much loved by customers and crew, but now is the time for us to look to the future and to plan for a brighter future, even as we battle the crisis we face today.”

For passengers and for freight:

Each ship has been carefully designed to suit the route on which it will operate, taking account of future trends in both passenger and freight traffic. To begin with, the garage will be longer and higher which means greater freight capacity. However, they will also be better adapted to new types of passenger vehicle.

This includes the trend towards bigger cars. Today’s Mini for example is 25% longer and wider now than the version on sale when Bretagne was launched. Additional lane space will allow easier access upon boarding and disembarkation, particularly for passengers with mobility problems. The physical size of the garage means they will also be better suited for motorhomes. Meanwhile in-voyage charging will be available for electric car drivers, allowing them to fuel-up en route, ready for their arrival in France.

There will be more cabins too. While Bretagne and Normandie have high (potential) passenger capacities, the reality is that night-time crossings can be limited by cabin availability. Both new ships will therefore come with more cabins, as well as an improved mix of cabin types.

For example, there will be a big increase in top-end commodore cabins. Normandie’s replacement will benefit from 30 more commodores, as well as a C-Club airport-style lounge. Bretagne’s replacement will host 79 more commodores with a C-Club lounge as well as 18 more cabins for families of up to six people.

Both ships will host an increase in pet-friendly cabins, ensuring four-legged travellers are well accommodated too. More details about services on board will be released in the months and years ahead.

How the hybrid system works:

The hybrid ships have two propellors. Each propeller is connected via a prop shaft to a separate gearbox. The gearbox manages power supplied from one LNG engine and to one reversible electric motor. The electric motor is used to either:

Drive the propeller

Charge batteries and/or power onboard systems in port

When driving a propellor, the electric motor is fed by batteries. But it can also be boosted by power from the second LNG engine, configured via the gearbox for the second propellor.

When operating in reverse, the electric motor charges batteries. Depending on charge, the batteries can also be used to power systems on board such as air conditioning, heating and lighting, for example when in ports.

Published in Brittany Ferries

Galway Port & Harbour

Galway Bay is a large bay on the west coast of Ireland, between County Galway in the province of Connacht to the north and the Burren in County Clare in the province of Munster to the south. Galway city and port is located on the northeast side of the bay. The bay is about 50 kilometres (31 miles) long and from 10 kilometres (6.2 miles) to 30 kilometres (19 miles) in breadth.

The Aran Islands are to the west across the entrance and there are numerous small islands within the bay.

Galway Port FAQs

Galway was founded in the 13th century by the de Burgo family, and became an important seaport with sailing ships bearing wine imports and exports of fish, hides and wool.

Not as old as previously thought. Galway bay was once a series of lagoons, known as Loch Lurgan, plied by people in log canoes. Ancient tree stumps exposed by storms in 2010 have been dated back about 7,500 years.

It is about 660,000 tonnes as it is a tidal port.

Capt Brian Sheridan, who succeeded his late father, Capt Frank Sheridan

The dock gates open approximately two hours before high water and close at high water subject to ship movements on each tide.

The typical ship sizes are in the region of 4,000 to 6,000 tonnes

Turbines for about 14 wind projects have been imported in recent years, but the tonnage of these cargoes is light. A European industry report calculates that each turbine generates €10 million in locally generated revenue during construction and logistics/transport.

Yes, Iceland has selected Galway as European landing location for international telecommunications cables. Farice, a company wholly owned by the Icelandic Government, currently owns and operates two submarine cables linking Iceland to Northern Europe.

It is "very much a live project", Harbourmaster Capt Sheridan says, and the Port of Galway board is "awaiting the outcome of a Bord Pleanála determination", he says.

90% of the scrap steel is exported to Spain with the balance being shipped to Portugal. Since the pandemic, scrap steel is shipped to the Liverpool where it is either transhipped to larger ships bound for China.

It might look like silage, but in fact, its bales domestic and municipal waste, exported to Denmark where the waste is incinerated, and the heat is used in district heating of homes and schools. It is called RDF or Refuse Derived Fuel and has been exported out of Galway since 2013.

The new ferry is arriving at Galway Bay onboard the cargo ship SVENJA. The vessel is currently on passage to Belem, Brazil before making her way across the Atlantic to Galway.

Two Volvo round world races have selected Galway for the prestigious yacht race route. Some 10,000 people welcomed the boats in during its first stopover in 2009, when a festival was marked by stunning weather. It was also selected for the race finish in 2012. The Volvo has changed its name and is now known as the "Ocean Race". Capt Sheridan says that once port expansion and the re-urbanisation of the docklands is complete, the port will welcome the "ocean race, Clipper race, Tall Ships race, Small Ships Regatta and maybe the America's Cup right into the city centre...".

The pandemic was the reason why Seafest did not go ahead in Cork in 2020. Galway will welcome Seafest back after it calls to Waterford and Limerick, thus having been to all the Port cities.

© Afloat 2020