Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Dover disruption

Afloat tracked Irish Ferries high-speed craft (HSC) Dublin Swift to Holyhead on Friday, having departed last month from Belfast Harbour on the repositioning voyage to north Wales, writes Jehan Ashmore.

The HSC which had been at Harland & Wolff for annual dry-docking, completed the Irish Sea passage in four hours, in preparation for this year’s return to seasonal service on the Dublin-Holyhead route

Dublin Swift as previously reported, is set to sail from its namesake port this Friday, 10 March, one week prior to the busy St. Patrick’s Day bank holiday weekend with capacity available for 900 passengers and 200 cars. 

The high-speed sailings which also handle 16 lorries, takes just over 2 hours on the Ireland-Wales route. Whereas conventional cruiseferry crossings by Ulysses and by the more freight oriented (ropax) vessel Epsilon take 3 hours 15 minutes.

Dover-Calais disruption

Also on Friday is when an engine-room fire on board Isle of Innisfree took place and was contained with no injury to crew nor passengers having disembarked safely at Calais.

The incident however led to cancelled sailings which currently remains in place on the Irish Ferries UK ‘landbridge’ service on the Dover-Calais route.

Other sailings, however are been maintained, albeit by just one ferry, the Isle of Inishmore, though the 'Innisfree' is set to return to service on Wednesday, 8 March. 

This reduction in sailing frequency has also been compounded as a third route ferry, Isle of Inisheer is also off-service due to dry-docking  at Harland & Wolff, Belfast.

Afloat also notes that according to the operator's sailing updates, the 'Inisheer' is listed for sailings on Thursday, 9 March, however on that day, the company regrets that all sailings have been cancelled due to technical reasons. Customers will however be accommodated on other sailings. 

Sailings take 1 hour 30 minutes on the service which Irish Ferries began in July, 2021.

For the latest sailing updates on the Strait of Dover route, along with Ireland-Wales routes and connecting Ireland-France, they can be consulted here.

In addition to the link above is a 24hr pre-recorded telephone information service.

Published in Irish Ferries

Galway Port & Harbour

Galway Bay is a large bay on the west coast of Ireland, between County Galway in the province of Connacht to the north and the Burren in County Clare in the province of Munster to the south. Galway city and port is located on the northeast side of the bay. The bay is about 50 kilometres (31 miles) long and from 10 kilometres (6.2 miles) to 30 kilometres (19 miles) in breadth.

The Aran Islands are to the west across the entrance and there are numerous small islands within the bay.

Galway Port FAQs

Galway was founded in the 13th century by the de Burgo family, and became an important seaport with sailing ships bearing wine imports and exports of fish, hides and wool.

Not as old as previously thought. Galway bay was once a series of lagoons, known as Loch Lurgan, plied by people in log canoes. Ancient tree stumps exposed by storms in 2010 have been dated back about 7,500 years.

It is about 660,000 tonnes as it is a tidal port.

Capt Brian Sheridan, who succeeded his late father, Capt Frank Sheridan

The dock gates open approximately two hours before high water and close at high water subject to ship movements on each tide.

The typical ship sizes are in the region of 4,000 to 6,000 tonnes

Turbines for about 14 wind projects have been imported in recent years, but the tonnage of these cargoes is light. A European industry report calculates that each turbine generates €10 million in locally generated revenue during construction and logistics/transport.

Yes, Iceland has selected Galway as European landing location for international telecommunications cables. Farice, a company wholly owned by the Icelandic Government, currently owns and operates two submarine cables linking Iceland to Northern Europe.

It is "very much a live project", Harbourmaster Capt Sheridan says, and the Port of Galway board is "awaiting the outcome of a Bord Pleanála determination", he says.

90% of the scrap steel is exported to Spain with the balance being shipped to Portugal. Since the pandemic, scrap steel is shipped to the Liverpool where it is either transhipped to larger ships bound for China.

It might look like silage, but in fact, its bales domestic and municipal waste, exported to Denmark where the waste is incinerated, and the heat is used in district heating of homes and schools. It is called RDF or Refuse Derived Fuel and has been exported out of Galway since 2013.

The new ferry is arriving at Galway Bay onboard the cargo ship SVENJA. The vessel is currently on passage to Belem, Brazil before making her way across the Atlantic to Galway.

Two Volvo round world races have selected Galway for the prestigious yacht race route. Some 10,000 people welcomed the boats in during its first stopover in 2009, when a festival was marked by stunning weather. It was also selected for the race finish in 2012. The Volvo has changed its name and is now known as the "Ocean Race". Capt Sheridan says that once port expansion and the re-urbanisation of the docklands is complete, the port will welcome the "ocean race, Clipper race, Tall Ships race, Small Ships Regatta and maybe the America's Cup right into the city centre...".

The pandemic was the reason why Seafest did not go ahead in Cork in 2020. Galway will welcome Seafest back after it calls to Waterford and Limerick, thus having been to all the Port cities.

© Afloat 2020