Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: testing

#POWER FROM THE SEA - A €9 million Europe-wide wave energy trial programme is one of the key elements of a new Government programme designed to transform Ireland as a maritime nation.

According to The Irish Times, University College Cork's Hydraulics and Maritime Research Centre will run testing of wave energy, tidal energy and offshore wind energy devices across a network of sites in 12 European countries participating in the new marine renewables infrastructure network Marinet.

Irish test sites in the network include the national ocean test facility in Cork and centres operated by the Sustainable Energy Authority of Ireland (SEAI) at Galway Bay and Belmullet.

The UCC centre also forms part of the new Irish Maritime and Energy Resource Cluster (IMERC), launched last Friday by Taoiseach Enda Kenny.

The cluster comprises UCC, the Irish Naval Service, Cork Institute of Technology and the National Maritime College of Ireland with the initial aim of creating 70 new research jobs by 2014 in the areas of wave energy, green shipping and sustainability of ocean resources.

IMERC director Dr Val Cummins said: “The aim of IMERC is to promote Ireland as a world-renowned research and development location that will unlock Ireland’s maritime and energy potential."

The Irish Times has more on the story HERE.

Published in Power From the Sea
Renowned yachtsman Roland Jourdain will be visiting Ireland next month to show off his new vessel ahead of the Fastnet Race.
A veteran of 60-foot monohulls, Jourdain will be in Dun Laoghaire from 4-5 August to test his new Veolia Environnement MOD70 trimaran, as well as select crews for next year's transatlantic races.
His new MOD70 is the second in a series of 12 that will begin racing next summer when six of the fleet race from New York to Brest in France. But the first test will be at the Fastnet, where he will race the only other MOD70 on the circuit.
The Veolia Environnement MOD70 will be berthed adjacent to the Royal St George Yacht Club for anyone curious to have a peek. For more details on the vessel and on Roland visit www.multionedesign.com and www.canyousea.com.

Renowned yachtsman Roland Jourdain will be visiting Ireland next month to show off his new vessel ahead of the Fastnet Race.

A veteran of 60-foot monohulls, Jourdain will be in Dun Laoghaire from 4-5 August to test his new Veolia Environnement MOD70 trimaran, as well as select crews for next year's transatlantic races.

His new MOD70 is the second in a series of 12 that will begin racing next summer when six of the fleet race from New York to Brest in France. But the first test will be at the Fastnet, where he will race the only other MOD70 on the circuit.

The Veolia Environnement MOD70 will be berthed adjacent to the Royal St George Yacht Club for anyone curious to have a peek. For more details on the vessel and on Roland visit www.multionedesign.com and www.canyousea.com.

Published in Offshore

Dun Laoghaire Baths Renovation

Afloat has been reporting on the new plans for the publically owned Dun Laoghaire Baths site located at the back of the East Pier since 2011 when plans for its development first went on display by Dun Laoghaire Rathdown County Council. 

Foreshore consent was applied for in 2013.

Last used 30 years ago as the 'Rainbow Rapids' before falling into dereliction – the new site does not include a public pool.

The refurbished Dun Laoghaire Baths include the existing Baths Pavilion for use as artist workspaces, a gallery café and for the provision of public toilet facilities. 

Work finally got underway at Dún Laoghaire on the €9 million redevelopments of the old Dún Laoghaire Baths site in June 2018 under a contract with SIAC-Mantovani.

The works have removed dilapidated structures to the rear of the Pavilion to permit the creation of a new route and landscaping that will connect the walkway at Newtownsmith to both the East Pier and the Peoples Park. 

Original saltwater pools have been filled in and new enhanced facilities for swimming and greater access to the water’s edge by means of a short jetty have also been provided.

The works included the delivery of rock armour to protect the new buildings from storm damage especially during easterly gales. 

It hasn't all been plain sailing during the construction phase with plastic fibres used in construction washing into the sea in November 2018

Work continues on the project in Spring 2020 with the new pier structure clearly visible from the shoreline.

A plinth at the end of the pier will be used to mount a statue of Roger Casement, a former Sandycove resident and Irish nationalist.