Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Southern Corridor

St. Georges Channel ferry routes between Fishguard and Pembroke Dock, Pembrokeshire, and Rosslare in Co. Wexford look set to sail into calmer waters this summer.

Operator Irish Ferries has announced that an existing Dover-Calais cruise ferry, the Isle of Innisfree, will replace the chartered P&O Ferries freight ferry, Norbay, on the Pembroke-Rosslare route. The ropax had been originally on the Dublin-Holyhead route before the debut of cruise-ferry Oscar Wilde on the ‘Central Corridor’ that connects between the Irish capital and North Wales.

In addition, rival operator Stena Line has announced changes to its Irish Sea management team, which will be divided into two sections. This will see ships on the ‘Southern Corridor’ managed separately from other services on the Irish Sea and on the North Channel.

The Swedish company says that this change to its management structure will "drive growth in the region.".

In reaction to both recent developments, they have been hailed as ‘enormously positive’ by politicians in both the regions of Pembrokeshire and Wexford in south-east Ireland.

More from the Western Telegraph on these recent announcements.

Published in Ferry
Holidaymakers now have the added option of  fast-ferry sailings on Stena Line's Rosslare-Fishguard port route which is to resume tomorrow, writes Jehan Ashmore.
The high season service is operated by the fast-ferry Stena Lynx III which is marketed as the Stena 'Express' . The summertime service runs between 1 July - 4 September and the fast-ferry is scheduled to take 120 minutes for the crossing.
Stena Lynx III has a capacity for over 600 passengers and 120-cars, to see a virtual tour of the wave-piercing catamaran craft click HERE. Measuring 81m long the 4,113 gross tonnes craft was built in 1996 by fast-ferry specialists InCat in Hobart, Tasmania. In recent years she maintained sailings between Dun Laoghaire-Holyhead when the HSS Stena Explorer was temporily taken off service.

In addition to the 'Express' service the St. Georges Channel route is served by the year-round operated conventional ferry, Stena Europe (1981/24,828 grt). The 1,386 passenger / 564-vehicle ferry recently underwent a £2m refurbishment and takes a more leisurely passage time of 3 hours 30 minutes.

For information on both fast-ferry and conventional ferry sailing schedules click HERE.

Published in Ferry
4th April 2011

Stena's Southern Sailings

Sailings on Stena Line's Rosslare-Fishguard port route remain for freight-users only until the passenger ferry returns from essential maintenance this week, writes Jehan Ashmore.
The passenger ferry Stena Europe is currently in dry-dock at the A&P Group's Falmouth facility and is scheduled to resume normal service with the first sailing at 14.30hrs from Fishguard on Thursday 7th April. The corresponding first outbound sailing from Rosslare is on the same day with the 21.15hrs sailing.

In the meantime freight-only ferry Stena Seafarer is operating the St. Georges Channel route having arrived at Rosslare on a repositioning voyage from Belfast on 29th March.

Stena Seafarer (1975 / 10,957grt) was one of a trio of freight-ferry sisters that served the Larne-Fleetwood port route until its closure in December. Like her sisters Stena Leader (1975 / 12,879grt) and Stena Pioneer (1975 / 14,426grt) they were built at the West German shipyard of J.J. Sietas in Hamburg.

Stena Seafarer's sisters remain laid-up in Belfast and with each vessel over 35 years in service it would seem likely there are nearing the end of their careers, at least on the Irish Sea.  

To provide additional passenger capacity the Stena 'Express' fast-ferry service will return to the southern corridor route between 1 July-4 September. The high-season sailings as usual will be operated by the InCat built Stena Lynx III which is to operate a daily single round trip in tandem with Stena Europe.

Published in Ferry

Dun Laoghaire Baths Renovation

Afloat has been reporting on the new plans for the publically owned Dun Laoghaire Baths site located at the back of the East Pier since 2011 when plans for its development first went on display by Dun Laoghaire Rathdown County Council. 

Foreshore consent was applied for in 2013.

Last used 30 years ago as the 'Rainbow Rapids' before falling into dereliction – the new site does not include a public pool.

The refurbished Dun Laoghaire Baths include the existing Baths Pavilion for use as artist workspaces, a gallery café and for the provision of public toilet facilities. 

Work finally got underway at Dún Laoghaire on the €9 million redevelopments of the old Dún Laoghaire Baths site in June 2018 under a contract with SIAC-Mantovani.

The works have removed dilapidated structures to the rear of the Pavilion to permit the creation of a new route and landscaping that will connect the walkway at Newtownsmith to both the East Pier and the Peoples Park. 

Original saltwater pools have been filled in and new enhanced facilities for swimming and greater access to the water’s edge by means of a short jetty have also been provided.

The works included the delivery of rock armour to protect the new buildings from storm damage especially during easterly gales. 

It hasn't all been plain sailing during the construction phase with plastic fibres used in construction washing into the sea in November 2018

Work continues on the project in Spring 2020 with the new pier structure clearly visible from the shoreline.

A plinth at the end of the pier will be used to mount a statue of Roger Casement, a former Sandycove resident and Irish nationalist.