Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Canoe Marathon

#Canoeing: Ronan Foley took gold medals on Saturday and Sunday at the canoe marathon World Cup in in Viana do Castelo in Portugal. The Kilcullen man dominated the short race on Saturday, and then sprinted away from his rivals on the last portage to win the marathon test on the Sunday.

 Barry Watkins took silver in the senior race over the short course on Saturday and took 10th on Sunday – recovering from an unwanted swim in rough conditions.

Canoe Marathon World Cup, Viana Do Castelo, Portugal (Irish interest; selected results):

Saturday

Men – K1 Short Race: 2 B Watkins 13:46.15.

K1 Short Race, Juniors: 1 R Foley 14 min 52.43 sec.

Sunday

Men – K1 Marathon: 10 Watkins 2 hr 21 min 10.20.

K1 Marathon, Junior Final: 1 Foley 1 hr 53 min 7.34 sec.

Published in Canoeing

#Canoeing: Jenny Egan finished fourth in the senior K1 event at the Canoe Marathon World Championships in Gyor in Hungary. Anna Koziskova of the Czech Republic took gold, covering the 26.1 kilometre course in one hour 56 minutes 28.847 seconds, while Egan was three minutes and just under 50 seconds further back. Egan was 57 seconds behind bronze medallist Kristina Bedec of Serbia.  

Canoe  Marathon World Championships, Gyor, Hungary

Men

K1 Senior, 30km: 25 P Egan 2 hrs 15 min 24.477sec ; B Watkins dnf. K1 Under-23, 26.1km: 18 T Brennan 1:56.378.177

Women

K1 Senior, 26.1km: 4 J Egan 2:00.18.166.

Published in Canoeing

Dun Laoghaire Baths Renovation

Afloat has been reporting on the new plans for the publically owned Dun Laoghaire Baths site located at the back of the East Pier since 2011 when plans for its development first went on display by Dun Laoghaire Rathdown County Council. 

Foreshore consent was applied for in 2013.

Last used 30 years ago as the 'Rainbow Rapids' before falling into dereliction – the new site does not include a public pool.

The refurbished Dun Laoghaire Baths include the existing Baths Pavilion for use as artist workspaces, a gallery café and for the provision of public toilet facilities. 

Work finally got underway at Dún Laoghaire on the €9 million redevelopments of the old Dún Laoghaire Baths site in June 2018 under a contract with SIAC-Mantovani.

The works have removed dilapidated structures to the rear of the Pavilion to permit the creation of a new route and landscaping that will connect the walkway at Newtownsmith to both the East Pier and the Peoples Park. 

Original saltwater pools have been filled in and new enhanced facilities for swimming and greater access to the water’s edge by means of a short jetty have also been provided.

The works included the delivery of rock armour to protect the new buildings from storm damage especially during easterly gales. 

It hasn't all been plain sailing during the construction phase with plastic fibres used in construction washing into the sea in November 2018

Work continues on the project in Spring 2020 with the new pier structure clearly visible from the shoreline.

A plinth at the end of the pier will be used to mount a statue of Roger Casement, a former Sandycove resident and Irish nationalist.