Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Brand New Ramp

#dublinport - The brand new Celine, the world's largest short-sea ro-ro freight ferry departed Dublin Port last night having made use of a new ramp linkspan to facilitate such ships, writes Jehan Ashmore.

As previously reported in Afloat's coverage prior to the maiden call of Celine that took place late last month to Ocean Pier in Alexandra Basin (East), the 238m long ship on this most recent call instead docked in the neighbouring larger Alexandra Basin.

The new installed ramp in Alexandra Basin (though not in position during last month's Open House Dublin boat tour) has the capability to be positioned on both Alexandra Quay west or Ocean Pier which it should be noted separates the two basins. The added flexibility of the ramp on both quays is provided given other ships use the basin (including large cruiseships) and so the option of a second ramp access ensures ro-ro freight ferries such as Celine are secured a berth.

To see another photo of the view but taken from Ocean Pier on the Alexandra Basin side, click here from the pre-boat tour coverage. Note in the photo's foreground a deck handrail from CMV's cruiseship, Magellan and ahead of the ship in the background is where Ocean Pier meets Alexandra Quay west.

Traffic on the CLnd /Cobelfret Ferries Celine which operates the Rotterdam-Zeebrugge-Dublin, has provided a major boost in capacity as the 8,000 freight lane metres of deck space will benefit trade between Ireland and mainland Europe.

The investment of both new tonnage by Luxembourg based CLnd along with the Alexandra Basin Redevelopment (ABR) project infrastructure is a measure of confidence in ro-ro traffic, where such trade is provided on direct shipping links to mainland continentel Europe against the backdrop of a post-Brexit UK. 

Figures released recently from Dublin Port reported that growth in ro-ro freight was particularly strong with 736,462 units in the first nine months, an increase of 5.3% on the previous year. Within this total, ro-ro services between Ireland and Britain also grew strongly at 6.2% while

Commenting on the trade figures, Eamonn O’Reilly, Chief Executive of Dublin Port said we expect to see more new services to Continental Europe during 2018.

Published in Dublin Port

Dun Laoghaire Baths Renovation

Afloat has been reporting on the new plans for the publically owned Dun Laoghaire Baths site located at the back of the East Pier since 2011 when plans for its development first went on display by Dun Laoghaire Rathdown County Council. 

Foreshore consent was applied for in 2013.

Last used 30 years ago as the 'Rainbow Rapids' before falling into dereliction – the new site does not include a public pool.

The refurbished Dun Laoghaire Baths include the existing Baths Pavilion for use as artist workspaces, a gallery café and for the provision of public toilet facilities. 

Work finally got underway at Dún Laoghaire on the €9 million redevelopments of the old Dún Laoghaire Baths site in June 2018 under a contract with SIAC-Mantovani.

The works have removed dilapidated structures to the rear of the Pavilion to permit the creation of a new route and landscaping that will connect the walkway at Newtownsmith to both the East Pier and the Peoples Park. 

Original saltwater pools have been filled in and new enhanced facilities for swimming and greater access to the water’s edge by means of a short jetty have also been provided.

The works included the delivery of rock armour to protect the new buildings from storm damage especially during easterly gales. 

It hasn't all been plain sailing during the construction phase with plastic fibres used in construction washing into the sea in November 2018

Work continues on the project in Spring 2020 with the new pier structure clearly visible from the shoreline.

A plinth at the end of the pier will be used to mount a statue of Roger Casement, a former Sandycove resident and Irish nationalist.