Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Sea Eagle

Wildlife service staff released 21 white-tailed sea eagle chicks to the wild over the weekend at four sites in Munster, including Lough Derg and the Shannon estuary.

Chicks were also released in Waterford and Killarney National Park as part of the second phase of the State’s re-introduction programme.

The National Parks and Wildlife Service (NPWS) said the chicks had been kept in purpose-built enclosures at the four locations while they “grew, matured, and developed the feathers and muscles necessary for flight”.

“They were carefully monitored and tagged by NPWS staff leading the collaborative reintroduction programme, which began in 2007,” the NPWS said.

Satellite tagging facilitates monitoring of their progress and their integration into the existing Irish breeding population, it said.

The chicks were collected under licence in June of this year from nests throughout the Trondheim area of west-central Norway by the Norwegian Institute for Nature Research.

The white-tailed sea eagle once bred on the Irish coastline and near large freshwater lakes, living on fish, waterbirds and dead animals, until driven to extinction in the 19th and early 20th centuries.

Twenty-one Norwegian-born White Tailed Eagle chicks were released into the wild at the four Munster sites - on the Shannon Estuary, Lough Derg, Waterford and in Killarney National Park (pictured). It is hoped they will bolster Ireland’s existing White-Tailed Eagle population. Overseeing the Release in Killarney National Park, from left, Regional Manager National Parks and Wildlife Service, Dr Allan Mee, Advisor, White Tailed Eagle Project Phase 1, Danny O'Keeffe, National Parks and Wildlife Service district conservation officer, Philip Buckley, Project Site Manager, Shannon Esturary. The chicks have been kept in purpose-built enclosures at the four locations while they grew, matured, and developed the feathers and muscles necessary for flight. They will continue to be carefully monitored and by NPWS staff leading the collaborative reintroduction programme, which began in 2007. The satellite tags will allow the project to monitor their progress and their integration into the existing Irish breeding population. Photo: Valerie O’SullivanOverseeing the Release of the chicks in Killarney National Park, from left, Regional Manager National Parks and Wildlife Service, Dr Allan Mee, Advisor, White Tailed Eagle Project Phase 1, Danny O'Keeffe, National Parks and Wildlife Service district conservation officer, Philip Buckley, Project Site Manager, Shannon Esturary. The chicks have been kept in purpose-built enclosures at the four locations while they grew, matured, and developed the feathers and muscles necessary for flight. They will continue to be carefully monitored and by NPWS staff leading the collaborative reintroduction programme, which began in 2007. Photo: Valerie O’Sullivan

The birds are particularly vulnerable to illness and poison in winter when they rely more heavily on carrion.

Most of the birds re-introduced to Ireland over the past 13 years – in a programme pioneered by the Golden Eagle Trust - have remained, while some were reported in Northern Ireland and at least seven birds were identified in Britain.

At least ten white-tailed eagle pairs held territory across four counties last year - in Kerry (7 pairs), Galway (1), Tipperary (1) and Cork (1).

A white tailed sea eagle chick Photo: Valerie O'SullivanA white tailed sea eagle chick Photo: Valerie O'Sullivan

The NPWS says at least nine pairs laid eggs in Kerry (6 pairs), Cork (1), Tipperary (1) and Galway (1).

The NPWS says that “restoring this lost flagship species to Irish skies will be a significant step in restoring Ireland’s natural heritage and will bring great benefit to Irish biodiversity”.

It says the project “underlines in practical terms Ireland’s commitment to implementing the UN Convention on Biological Diversity”.

Published in Marine Wildlife

#SeaEagle - West Cork was witnessed its first sea eagle fledging in more than 125 years, as The Irish Times reports.

Local birdwatchers have been observing the young white tailed eagle since it left its nest on Garnish Island in Bantry Bay a fortnight ago.

The fledgling marks the first success for the seabird species in the county since a number of Norwegian birds were released in Killarney as part of a sea eagle reintroduction programme between 2007 and 2011.

The Irish Times has more on the story HERE.

Published in Marine Wildlife

#seaeagles – The popular White Tailed Sea Eagle Viewing & Information Point at Mountshannon Pier in Co. Clare has reopened to the public following a hugely successful pilot opening period last summer.

More than 10,000 people flocked to the shores of Lough Derg between mid-July and September 2014 to catch a glimpse of the first successful breeding pair of White Tailed Sea Eagles in Ireland in 110 years.

The Viewing & Information Point is operated by the Mountshannon Eagle Group, in conjunction with the Golden Eagle Trust and Mountshannon Community Council. It features telescopes and information and displays about the White Tailed Sea Eagles, regarded as Ireland's largest and most spectacular breeding birds.

Clare County Council, which funds the facility, says the facility generated more than half a million euro for the local economy in 2014. A visitor survey conducted last year found that 43% of people said the attraction was the primary factor influencing their decision to visit Mountshannon.

The Mountshannon breeding pair of eagles, a seven-year-old male and six-year-old female, were originally collected as chicks on the island of Frøya off the west coast of Norway by the Golden Eagle Trust. The birds were released in Killarney National Park before relocating to Lough Derg in 2011. The pair, named Saoirse and Caimin, created history in 2013 when they reared the first chicks to fly from a nest in Ireland in 110 years. The pair successfully hatched another chick in 2014 with the local community in Mountshannon expressing hope of another successful hatching this summer.

"Our trial opening in 2014 shows there is significant and genuine interest amongst the general public in these wonderful birds. People are especially fascinated by how and why the birds have settled and began to breed in Lough Derg. This project also demonstrates the potential in terms of tourism product development at this location," said Congella McGuire, Clare Heritage Officer.

Ms. McGuire noted that the visitor figures compare well to the Island of Mull in Scotland where White-tailed Sea Eagles watching has been popular for more than 10 years. A greater percentage of people came to Mountshannon (43%) specifically to see the Eagle pair than to the Island of Mull (23%) where eagle tourism brings in an estimated £5 million annually.

"Clare County Council is delighted to have played a leading role in increasing public interest in the local White Tailed Sea Eagle population without disturbing them in their natural habitat. By doing so, the Council is playing a key role in safeguarding these protected birds and their nesting activities as well as providing an excellent addition to the local tourism infrastructure," Ms. McGuire added.

Published in Inland Waterways
Tagged under

#MarineWildlife - The remains of a sea eagle – or white-tailed eagle – have been found in Connemara, and experts say the bird was poisoned.

RTÉ News reports on the discovery earlier this month of the female eagle, which was "within days" of laying eggs.

She was one of a pair that settled in the Roundstone area of Galway after her release in Killarney six years ago. Last year the pair laid eggs but they did not hatch.

The gruesome find marks the 13th poisoning of a sea eagle since they were reintroduced to the wild, and comes just weeks after the remains of another white-tailed eagle were found in Fermanagh.

Published in Marine Wildlife

#MarineWildlife - "A sad end to a beautiful bird" is how the Golden Eagle Trust described the news that remains of a white-tailed eagle were found near Lower Lough Erne in Co Fermanagh earlier this month.

As RTÉ News reports, Ingar was released in Killarney National Park in 2011 as part of a reintroduction programme for the species, also known as the sea eagle.

That same programme saw the introduction of Ireland's first breeding pair of white-tailed eagles in over a century.

Saoirse and Caimin reared their first chicks in 2013, and the birds of prey have proven very popular in Lough Derg, where they relocated from Killarney in 2011.

Ingar's GPS transmitter showed that he had flown to different climes further north, spending the majority of last year on Lough Erne - though it stopped transmitting in December.

Published in Marine Wildlife

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020