Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Tarmonbarry

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that the closure of Tarmonbarry Bridge will be extended until at least Monday 27 May.

This further delay is due to additional repair works requiring specialist components being manufactured and delivered from international suppliers.

The cross-border body for Ireland’s inland waterways says the parts required are essential to the safe operation of the bridge.

A diversion route remains available via the Camlin River with additional staff being deployed to Clondra Lock to aid vessel movements along the Camlin.

Waterways Ireland says it regrets any inconvenience that this may cause and thanks its customers for their cooperation in relation to this matter.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that the lifting bridge at Tarmonbarry in Co Roscommon will now reopen on Friday 3 May.

This extension of the bridge’s closure since February is a result of additional repair works required following a bridge strike.

The cross-border body for Ireland’s inland waterways says it apologises for extending this closure “but the additional work is essential to ensure the bridge is safely operational in advance of the bank holiday weekend”.

A diversion route remains available via the Camlin River.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels on and users of the Shannon Navigation that the lifting bridge at Tarmonbarry in Co Roscommon will remain closed until at least Thursday 18 April to facilitate essential maintenance works.

Works at Tarmonbarry were previously extended twice since beginning in early February, and a diversion route is available via the Camlin River.

The cross-border body for Ireland’s inland waterways says it regrets any inconvenience that this may cause and thanks its customers for their cooperation.

This story was updated on Wednesday 3 April to include the latest information.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that diving operations will be taking place at Tarmonbarry Wier from Monday 25 September for a period of approximately one week.

Alpha Flag (Divers Flag) will be flown to indicate the presence of divers in the water. The cross-border body for Ireland’s inland waterways asks masters of vessels to please proceed with additional caution in the area.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels and water users on the Shannon Navigation that Tarmonbarry Bridge and Lock in Co Longford will be closed from Tuesday 10 to Friday 13 May for further emergency repair works.

An alternative route via the Camlin River is available. Masters of vessels and water users are advised to check their airdraft prior to undertaking the passage on this inland waterway due to the low bridge on the N5 road.

Update 11/5: Waterways Ireland says Tarmonbarry Bridge and Lock have now been reopened to navigation. Essential maintenance works are continuing at Tarmonbarry Bridge and some minor delays may be experienced.

Published in Inland Waterways

Waterways Ireland has launched a request for tender for the development of a visitor and tourism plan for the Clondra/Richmond Harbour and Tarmonbarry area at the western end of the Royal Canal.

According to the RFT, the intended plan “will chart and identify the recreational and tourism interventions required to boost tourism, recreation and economic regeneration in the area”.

Among its objectives are “to take an integrated development approach to conserve, develop and promote [the area] as a significant recreation/tourism destination in the centre of Ireland”, and “to set out a clear, realistic and achievable tourism vision…over a 10-year period”.

In addition, any plan “must be compatible with the environmental designation and zoning” of the localities covered on this part of the inland waterway.

A particular focus for Waterways Ireland will be to “protect and restore one of our heritage assets” — namely the old lock keeper’s house at Lock 46, which dates from the early 19th century.

The deadline for receipt of tender applications is 3pm on Thursday 13 January 2022. More details can be found on the eTenders website HERE.

Published in Inland Waterways

The re-opening of Tarmonbarry Lock on the Shannon Navigation has been extended until Wed 1 Apr 2015. Further information may be had by contacting Waterways Ireland's Carrick-on-Shannon office at 07196-50563 or the lockkeeper at 087-9222020.

Published in Inland Waterways
Tagged under

Waterways Ireland advises the Lock Gate maintenance at Tarmombarry on the Shannon Navigation has been completed.

Published in Inland Waterways
Tagged under

Marine Institute Research Vessel Tom Crean

Ireland’s new marine research vessel will be named the RV Tom Crean after the renowned County Kerry seaman and explorer who undertook three major groundbreaking expeditions to the Antarctic in the early years of the 20th Century which sought to increase scientific knowledge and to explore unreached areas of the world, at that time.

Ireland's new multi-purpose marine research vessel RV Tom Crean, was delivered in July 2022 and will be used by the Marine Institute and other State agencies and universities to undertake fisheries research, oceanographic and environmental research, seabed mapping surveys; as well as maintaining and deploying weather buoys, observational infrastructure and Remotely Operated Vehicles.

The RV Tom Crean will also enable the Marine Institute to continue to lead and support high-quality scientific surveys that contribute to Ireland's position as a leader in marine science. The research vessel is a modern, multipurpose, silent vessel (designed to meet the stringent criteria of the ICES 209 noise standard for fisheries research), capable of operating in the Irish Exclusive Economic Zone (EEZ). The Tom Crean is able to go to sea for at least 21 days at a time and is designed to operate in harsh sea conditions.

RV Tom Crean Specification Overview

  • Length Overall: 52.8 m
  • Beam 14m
  • Draft 5.2M 

Power

  • Main Propulsion Motor 2000 kw
  • Bow Thruster 780 kw
  • Tunnel thruster 400 kw

Other

  • Endurance  21 Days
  • Range of 8,000 nautical miles
  • DP1 Dynamic Positioning
  • Capacity for 3 x 20ft Containers

Irish Marine Research activities

The new state-of-the-art multi-purpose marine research vessel will carry out a wide range of marine research activities, including vital fisheries, climate change-related research, seabed mapping and oceanography.

The new 52.8-metre modern research vessel, which will replace the 31-metre RV Celtic Voyager, has been commissioned with funding provided by the Department of Agriculture, Food and the Marine approved by the Government of Ireland.

According to Aodhán FitzGerald, Research Vessel Manager of the MI, the RV Tom Crean will feature an articulated boom crane aft (6t@ 10m, 3T@ 15m), located on the aft-gantry. This will be largely used for loading science equipment and net and equipment handling offshore.

Mounted at the stern is a 10T A-frame aft which can articulate through 170 degrees which are for deploying and recovering large science equipment such as a remotely operated vehicle (ROV’s), towed sleds and for fishing operations.

In addition the fitting of an 8 Ton starboard side T Frame for deploying grabs and corers to 4000m which is the same depth applicable to when the vessel is heaving but is compensated by a CTD system consisting of a winch and frame during such operations.

The vessel will have the regulation MOB boat on a dedicated davit and the facility to carry a 6.5m Rigid Inflatable tender on the port side.

Also at the aft deck is where the 'Holland 1' Work class ROV and the University of Limericks 'Etain' sub-Atlantic ROV will be positioned. In addition up to 3 x 20’ (TEU) containers can be carried.

The newbuild has been engineered to endure increasing harsher conditions and the punishing weather systems encountered in the North-East Atlantic where deployments of RV Tom Crean on surveys spent up to 21 days duration.

In addition, RV Tom Crean will be able to operate in an ultra silent-mode, which is crucial to meet the stringent criteria of the ICES 209 noise standard for fisheries research purposes.

The classification of the newbuild as been appointed to Lloyds and below is a list of the main capabilities and duties to be tasked by RV Tom Crean:

  • Oceanographic surveys, incl. CTD water sampling
  • Fishery research operations
  • Acoustic research operations
  • Environmental research and sampling operation incl. coring
  • ROV and AUV/ASV Surveys
  • Buoy/Mooring operations