St. Columba, British Rail/Sealink's largest custom-built Dun Laoghaire-Holyhead ferry which served many a generation with fond memories and which left the Irish Sea 25 years ago, has gone for scrapping in Pakistan, writes Jehan Ashmore.

The 44 year-old Massarah, originally of 7,836grt when launched as St. Columba in 1977 at the Aalborg Werft A/S in Denmark to serve the premier Ireland-Wales route, replaced a pair of classic 'mail-boats' Hibernia and Cambria. In addition the £19m ferry displaced Holyhead Ferry I, built in 1965 for the route albeit this smaller car ferry was only stern-loading. St. Columba with 2,400 passengers was the biggest on the Irish Sea and carried 335 cars or 36 lorries or a combination of both.

In December, Afloat referred (see photo-caption) that St. Columba /Massarah had gone to the shipbreakers as the renamed Assarah when beached at Gadani, famously known for shipbreaking. The ferry after its Irish Sea career went to the Mediterranean where in Greek waters served as Express Aphrodite until 2006.

This was followed with a career serving Egyptian based shipowners, Namma Shipping Lines trading in the Red Sea with calls to include Jeddah in Saudi Arabia. This involved Massarah serving the busy annual Islamic pilgrimage when Muslims headed to Mecca where the Haji is held.

For almost 20 years, St. Columba plied the 57 nautical-mile Irish Sea route and after Sealink UK was privatised by the UK Government in 1984, was acquired by Sea Containers and with the altered brand name of Sealink British Ferries. The ship retained its Sealink name, see photo.

This was followed in 1990 by another owner, Stena Line which led to the ship renamed twice. In the following year a major internal refit led to the first renaming as Stena Hibernia, this in hommage to the route's historical mail-boat heritage by the Swedish shipowner.

But in the final years on the Irish Sea, the ferry took on another name, Stena Adventurer until withdrawn from the Irish Sea route in 1996.

In that same year was introduced the Highspeed Sea Service (HSS) Stena Explorer, a craft that marked a significant new era on the link as then the world's largest and fastest vehicle carrying/passenger fast-ferry. The 1,500 passenger craft also handled 375 cars and 50 lorries.

To the ferry purest in particular, the contrast was considerable marked, as the almost 20 knot St. Columba offered a two-class service spread across two main passenger decks. They included lounge/bars named Landsdowne and Cardiff Arms in recongition of rugby travellers! In addition to waiter and self-service buffet restaurents, TV lounges, discoteque, a duty-free shop and nursing mother's room. However, by 1983 the 129m ferry was altered to a single-class passenger service.

Compared to St. Columba, the HSS Stena Explorer (preceded by a trio smaller 'Lynx' fast craft) consisted of just a single football sized passenger deck with open plan seating offering panoramic views through giant lattice windows. Though, despite the craft's much shorter 99-minute link been an advantage, the HSS still offered a Stena Plus / Motorists lounge, located forward and was impressive when underway at 40 knots! In addition to lounges, Duty-Free, MacDonalds and large-screen video panels for information etc.

Yet, despite the revolutionary design of the futuristic craft, the HSS only had a career of just 18 years on the Irish Sea when ceasing in 2014. (See: Ships Monthly, June 2015 for 'Farewell to Stena HSS' feature).

Whereas, St. Columba etc, had served for almost two decades, except for a single yet brief exception in 1982, having strayed to the St. Georges Channel. This was to stand in for chartered-in Stena Normandica while out of service on Sealink's Rosslare-Fishguard route.

St. Columba was named after the 6th century Irish abbot and with the ferry following sea trials was delivered in 1977 as alluded. Receptions were held in the ferry's homeport of Holyhead and then in Dun Laoghaire following an inaugural sailing from Anglesey in April. On board were members of the British Rail Board, tourism and other diginaties and at the Irish port the Taoiseach (prime minister) Liam Cosgrave was invited on board and also a reception was held in the nearby Royal Marine Hotel.

A maiden commercial crossing took place later from Holyhead to Dun Laoghaire, a route with origins that can be traced to 1835.

Introduction of St. Columba proved to be an instant success having after just one year in service carried its 1 millionth passenger. As the multi-purpose single ship modernised the link and notably as the Irish Sea's largest ferry with passengers accommodated in 1st and 2nd class quarters.

However, for many generations of Irish people emigrating to Britain and beyond, St. Columba, albeit sadly played a part in the nation's diapora. As the next step for passengers having disembarked in north Wales, was taking onward bus or train connection to UK cities and London to seek work.

Passenger traffic albeit of a happier note saw holidaymakers between the nations and those beyond taking the UK 'landbridge' to / from continental Europe. To those exclusively seeking a bargain with duty-free shopping (see recent comeback) or for some just intending a round-trip excursion.

St. Columba on a personal basis provided childhood memories having observed off the Kish Bank lighthouse, Dublin Bay and within Dun Laoghaire Harbour. In addition to having embarked on family holidays in 1981 and the following year, by taking the aforementioned 'landbridge' routes to France.

Noting some of these English Channel ferries would also serve on the Irish Sea due to a variety of operational reasons. The presence of Sealink's French-flagged counterpart ferries in Dun Laoghaire Harbour then seemed exotic! This was an added bonus and would strenghten my childhood interest with ferries and shipping in general.

When watching the St. Columba arrive in Dun Laoghaire, the somewhat stout-looking ship, when observed looking at certain angles, would berth bow-on at the harbour's linkspan at Carlisle Pier. It was at the adjacent quayside where the 'mail-boat' would occupy and opposite of the East Pier's Victorian bandstand.

This was an advantagous spot for onlookers when St. Columba's stern swung around (see recent Anna G containership story) for departures prior to heading through the harbour mouth.

Also fascinating to see was when the bow-visor opened when approaching the pierside, whereas in Holyhead, operations involved the stern-door when berthing in the port's inner harbour.

The confined harbour in Anglesey was why the ferry was designed with a stern-bridge to enable easier navigation when going astern beyond the Salt Island before swinging around within the harbour to head off the breakwater. See, recent Storm Barra / public access closure story.

Afloat understands that a former fleetmate of Stena Hibernia, the Altair, formerly St. Anselm/ Stena Cambria which served in tandem on the Irish Sea route during the early 90's, was awaiting to be broken up also in Asia.

As according to AIS, last month the ferry was last indicated to be offshore off Chittagong in Bangladesh. 

Published in Ferry

#FerryService2016? – A new ferry operator sought for the Dun Laoghaire-Holyhead route this year remains to be seen following Stena Line's closure of the service in 2014 and with only months away before the summer season begins, writes Jehan Ashmore.

Stena finally confirmed in early 2015 to permanently close the historic route dating to 1835, by consolidating existing operations in neighbouring Dublin Port where since 1995 the company have also run a service to Holyhead.

Responding to Afloat.ie, a spokesperson for Dun Laoghaire Harbour Company said at this moment they could not make any further comment on a ferry service in 2016, but they added they hoped to be in a position to make a comment sometime early this year.

It is almost a year ago when DLHC received seven expressions of interest from operators to provide a seasonal-only ferry service to Holyhead following an e-Tender advert.

Commenting then on the expressions of interest recieved, DLHC and said they 'will now consider these' and added 'final configurations would be a matter for discussion and agreement with a new provider, and would be in keeping and take account of the Harbour Company's Masterplan'.

According to a document from the advert, a berth is available which is 140 metres long and with a maximum depth of 5.8 metres. In addition the berthing facility is described as having a shore to ship ramp, which can easily be modified to facilitate the configuration of a new vessel.

Afloat.ie adds that St. Michaels Pier has two berths, one is custom-built to only accommodate the specialist requirements of the HSS Stena Explorer when the highspeed fast-craft was withdrawn from service in September 2014. There are plans to remove this berth which requires planning permission for its dismantling.

The second conventional berth on St. Michaels Pier was also used by Stena Line when a smaller 'Lynx' fast-ferry craft, Stena Lynx III had also operated the Ireland-Wales route in recent years.

The Stena Lynx III had served shoulder seasons when HSS Stena Explorer reduced operating its full year-round service until 2011. It was in that same year the ‘Lynx’ was sold to overseas owners in Asia.

#FerryDunLaogaire? – Dun Laoghaire Harbour Company has received seven expressions of interest from operators to provide a seasonal-only ferry service to Holyhead, writes Jehan Ashmore.

Afloat.ie has contacted the DLHC following last Friday's advert deadline for potential ferry operators to operate on the 52 nautical mile route.

A month ago, Stena Line confirmed the permanent closure of the historic Ireland-Wales link.

Prior to the ferry company responses, DLHC annnounced that any new operator would not be serving the route until at least 2016.

Following the responses, a spokesperson on behalf of DLHC said they 'will now consider these'. The harbour company added, 'final configurations would be a matter for discussion and agreement with a new provider, and would be in keeping and take account of the Harbour Company's Masterplan'.

As part of the Masterplan, the site of St. Micheal's Pier is where a major residential redevelopment is proposed.

For more than 170 years there has been a ferry service running between Dun Laoghaire and Holyhead from where Stena Line has served the Irish Sea service since 1990.

In additon to conventional ferry tonnage, they introduced a small 'Lynx' fast-ferry in 1993 which was replaced by the world's largest fast craft, the HSS Stena Explorer in 1996.

Stena's decision to withdraw operations in the south Dublin Bay port, leaves a berth available for a new ferry operator in Dun Laoghaire Harbour using the terminal at St. Michaels Pier.

According to the advert document the berth is 140 metres long with a maximum depth of 5.8 metres. In addition the berthing facility is described as having a shore to ship ramp, which can easily be modified to facilitate the configuration of a new vessel.

Afloat.ie adds that St. Michaels Pier has two berths, one is custom-built to only accommodate the specialist requirements of the HSS Stena Explorer.

The second adjacent berth was also used by Stena Line when a 'Lynx' craft as previously referred but had returned in more recent years to the route. The Stena Lynx III served during the shoulder seasons when the HSS Stena Explorer had operated a year-round service until 2011.

The 19,638 tons HSS remains at her homeport of Holyhead and likewise at a custom-built berth in the inner harbour of the Welsh port.

Also in Anglesey is the Stena Superfast X, which made a delivery voyage last week from Poland having had a major refit. The 30,551 tons newcomer has yet to enter service on the Holyhead-Dublin Port route in competition with Irish Ferries

#StenaHSSfuture? – Stena Line's introduction of Stena Superfast X to expand capacity on the Dublin-Holyhead route in early 2015, raises uncertainty over the future of the Dun Laoghaire HSS operated service to Wales, writes Jehan Ashmore.

Now that Superfast X a larger passenger and freight ship of 29,500 tonnes is to make a debut in early 2015, this week's announcement comes at a time when speculation continues to mount over the re-opening in 2015 of the Dun Laoghaire-Holyhead route. In addition it raises the issue of whether the High Speed Sea-Service (HSS) Stena Explorer will return or by a smaller fast-ferry?

The route's main summer-season service ceased in September and the recent news to cancel Christmas sailings marked the first time the HSS operated route has been closed over the festive and early New Year.

Afloat.ie asked Stena to comment on the introduction of increased capacity by Superfast X on the Dublin Port route and the future viability of the Dun Laoghaire route served by the High Speed Sea-Service (HSS) Stena Explorer currently tied-up in Holyhead.

Once again the reply was a familiar response, "Stena Line is currently engaged in on-going discussions with Dun Laoghaire Harbour in relation to the provision of a seasonal fast craft service in 2015".

When Stena Superfast makes her debut in early 2015 on the core Dublin-Holyhead central corridor route, she will bring increased capacity for 1,200 passengers, notably compared to around 400 as carried by the vessel she is to directly replace, Stena Nordica.

In addition the newcomer most recently serving Dover-Calais service, is currently undergoing vehicle deck conversion work by MacGregor, the contractor which will also increase capacity to almost 2kms of lane space for cars and freight.

Plus the 'Superfast X' is having a refit to upgrade of passenger facilities in readiness for when she enters on the Dublin route. She will join the existing service's second ship, Stena Adventurer which is more of an even match compared to the 'Nordica'.

Stena Line clearly are confident in the route's potential as Dublin Port is a key strategic tourism gateway and on foot of a recovering economy. The operator citing leisure and commercial traffic between Ireland and Britain are showing really encouraging signs of future growth.

Already in service since 2011 are her sisters Superfast VII and VIII which operate on the Belfast-Cairnryan route.

As for the fuel thirsty and expensive to operate HSS Stena Explorer, the catamaran fast-ferry stood down from the Dun Laoghaire-Holyhead having operated the summer-seasonal service that began in April and ran through to early September.

This year was the HSS crafts third consecutive season of only operating a summer-only service since her introduction in 1996. The fast-ferry having then replaced the last conventional ferry to run on the Ireland-Wales link.

 

#StenaHSSroute? – Afloat.ie has recontacted Stena Line if it is to resume Dun Laoghaire-Holyhead summer season service in 2015, given also their 'commercial and operational reasons' for cancelling Christmas sailings on this occasion, writes Jehan Ashmore.

When questioned on the discussions between Stena Line and Dun Laoghaire Harbour Company, the ferry firm reiterated that they are currently engaged in on-going discussions with Dun Laoghaire Harbour in relation to the provision of a seasonal fast craft service in 2015.

Since the introduction of HSS fast-craft operations on the Irish Sea in 1996, this is the first time that no sailings will be provided over the festive and early New Year periods. Passengers with bookings or those planning to travel will according to the company "be accommodated on other sailings best suited to their travel requirements". The company operate conventional ferries on the Dublin Port-Holyhead service.

Afloat.ie also inquired if Stena Line are considering an alternative to replace the 1500 passenger /375 car HSS fast-craft Stena Explorer with their smaller 900 passenger /210 car Stena Carisma or another fastcraft option? The ferry operator did not confirm or deny as the response given was simply the same reply as to the first question posed above.

Earlier this year, Stena Line withdrew the Stena Carisma from the Gothenburg-Frederikshavn route on the Kattegat Sea linking Sweden and Denmark. The 2 hour crossing time by fast-craft on the Scandinavian route is similar to the Irish Sea route which takes an additional 10 minutes.

Should a smaller craft be introduced and not the HSS 900, the issue of port infrastructure would seem less likely to require berth linkspan adaptation. 

Unlike the 19,638 tonnes Stena Explorer built by Finnyards in 1996 and as the first of a trio of High Speed Sea-Service (HSS) 1500 sisters commissioned, the 'Carisma' was the only HSS 900 class craft completed for the Swedish owned ferry giant.

The 8,631 tonnes HSS 900 was built by the Westamarine Byggs yard in Norway. Work did take place on a sister however this ceased having only achieved 30% of construction.

The absence of the HSS Stena Explorer leaves only rivals Irish Ferries currently operating fast-craft services on the central corridor Dublin-Holyhead route served by Jonathan Swift. The 800 passenger/ 200 car Austal built fast-craft is similar to the passenger and vehicle capacity of Stena's Carisma.

As previously reported, Irish Ferries announced they are to boost capacity by bringing ro-pax Isle of Inishmore onto the Dublin-Holyhead route, which in addition to Jonathan Swift is served by flagship Ulysses and ro-pax Epsilon.

The chartered Epsilon also runs a Dublin-Cherbourg service but only by sailing a round-trip at weekends.

 

Published in Ferry

#HSSreturns - The HSS Stena Explorer re-entered service on Stena Line's Dun Laoghaire-Holyhead route today and will continue to operate throughout the summer until 9 September.

This is the HSS high speed sea service fourth season operating the route on a seasonal only basis and which takes the fast-craft to cross the Irish Sea in just 2hours 20 minutes.

She has capacity for up to 1,500 passengers and 1,100 lane metres, will operate one round trip each day with a 10:30hrs sailing from Holyhead and a 13:30hrs sailing from Dun Laoghaire.

Richard Horswill, Stena Line's Head of Freight UK & Ireland said: "We are pleased to offer increased capacity to our freight customers on the HSS Stena Explorer, this service complements the existing timetable in operation on the Dublin Port to Holyhead route with the Stena Adventurer and Stena Nordica providing greater flexibility and choice of sailing times for freight customers across the Irish Sea".

For further information and details go to www.stenalinefreight.com or call 0870 850 3535.

Published in Ferry

#HSSservice–Stena Line's HSS Stena Explorer fast-craft is to return on the Dun Laoghaire-Holyhead seasonal-operated route on 9 April.

The HSS (High-Speed Sea Service) operates to one departure daily from Dun Laoghaire and Holyhead during this season, for further information on sailing schedule visit this link.

The central Irish Sea corridor route takes 2 hours and 20 minutes and this is the fourth year in succession of the seasonal-only operated service that in 2014 will run until 9 September.

Published in Ferry

#StenaHSS – Stena Line's HSS fastcraft operated Dun Laoghaire-Holyhead route ceased sailings last Tuesday on the seasonal-only service, writes Jehan Ashmore.

The central Irish Sea corridor route had been running since Easter and operated by the Stena Explorer, the last of a trio of HSS fastcraft remaining in service for the company.

Stena Explorer will be returning to the 2 hour 20 minute route on 20 December 2013 for a limited number of sailings over the Christmas and New Year period.

Stena Line run two conventional ferries between Dublin Port - Holyhead on the all year round 3 hour 15 minutes route.

 

Published in Ferry

#SailingsCancelled – According to the Stena Line website, today's (Friday 22 March) HSS Stena Explorer fast-craft sailing departing at 13.30HRS from Dun Laoghaire to Holyhead has been cancelled.

All passengers en route to the port are advised to contact the Stena Line (24hrs) ferrycheck number (01) 204 7799 for the most up-to-date information about the sailings.

In addition to consulting information from this LINK.

 

Published in Ferry

#FinnishFerry –Following an inspection of Finnarrow due to a 'stabiliser incident' in Holyhead at the weekend, the chartered Finnish ferry requires further attention. The 25,996 tonnes vessel, having departed Anglesey today with a tug bound for Scotland, writes Jehan Ashmore.

As previously reported on Afloat.ie, Stena Line yesterday reactivated the fastcraft HSS Stena Explorer, with an earlier than planned opening of the Dun Laoghaire-Holyhead, a seasonal-only operated service which otherwise would not resume until late March.

In the meantime Stena Explorer is providing back-up operations for passengers, in the absence of Finnarrow sailings on the Dublin Port-Holyhead route. A second route ferry, Stena Adventurer, is as usual maintaining sailings on the Dublin Port-Holyhead route.

Passengers due to travel with Stena Line should note the 'latest' information on sailing times. In addition passengers should take particular note of certain sailings for 'foot' passengers and  'vehicle-only' sailings. For information visit: www.stenaline.ie/ferry/latest-sailing-information/

The 'Adventurer's fleetmate Stena Nordica firstly headed for the St. Georges Channel route, having been replaced on the Dublin route by the chartered Finnarrow in late January.

Stena Nordica is currently running Belfast-Cairnryan sailings, while the 'Superfast' sisters each take turns for annual maintenance at Harland & Wolff, Belfast.

Published in Ferry
Page 1 of 3

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023