Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Dublin Array

The Department of Transport has been advised by Dublin Array that they will be conducting geophysical, geotechnical and environmental surveys for the Dublin Array offshore wind farm project.

Site investigation operations for the wind farm and the Expert Corridor Route (ECR) between the coast of Dublin and Wicklow will take place between Friday 19 April and the end of July, subject to weather and operational constraints.

The geophysical survey will be carried out by the vessel Fugro Helmert (callsign C6FT8). During these operations, the vessel will be towing equipment at a depth of up to five metres below the surface and extending some 300 metres astern.

The geotechnical survey will be carried out by the vessel M/V Flat Holm (callsign GHLZ) at fixed stations. The environmental survey will be carried out by the vessel Ros Áine (callsign EIZG5) in daytime hours only.

All vessels will be mobilised from Dun Laoghaire and will be restricted in their ability to manoeuvre, therefore all other mariners are advised to provide a wide berth and navigate with caution in the relevant area.

Coordinates and a map of the survey area, as well as contact details, can be found in Marine Notice No 18 of 2024, attached below.

Published in Power From the Sea

RWE Renewables Ireland has appointed Vanessa O’Connell as its new Development Project Director for the Dublin Array offshore wind farm.

Dublin Array is a proposed 824MW offshore wind farm, which will be located about 10 kilometres from the coast of counties Dublin and Wicklow.

Vanessa replaces Peter Lefroy, who has been leading the project since 2018, while also being the Offshore Development Head for Ireland. Peter will continue in his role as Offshore Development Head of RWE Ireland & UK West.

Vanessa brings more than 12 years of experience in leadership in the offshore wind sector to RWE. She has worked across all stages of offshore wind projects, encompassing development, construction, and operations, with involvement in nine offshore wind projects.

Vanessa spent over ten years at Ørsted, working on projects such as Hornsea 1 (1.2GW), Burbo Bank Extension (258MW), Walney Extension (659MW), and Barrow (90MW). On Hornsea 1, Vanessa held leadership positions in the commercial function, served on the construction leadership team, and assumed overall accountability for the asset during its transition to the operational phase.

Returning to Ireland over two years ago, Vanessa assumed the role as Head of Inis Offshore Wind. This independent offshore wind developer, backed by Temporis and the Ireland Strategic Investment Fund, focuses on early stage development in Ireland.

Vanessa holds an MSc in Environmental Technology from Imperial College London and a BA in Economics from Trinity College Dublin. She lives in Dun Laoghaire with her husband and two daughters.

Commenting on the appointment, RWE Director of Offshore Development UK & Ireland Danielle Lane said:

“I’m delighted that Vanessa has chosen to join RWE and Dublin Array. Her skills and experience in working in offshore wind will make a great contribution to the project at an important time. Dublin Array is a flagship project in the Irish offshore wind market and Vanessa is joining a strong, established team that will thrive under her leadership.”

Dublin Array

Dublin Array is a proposed offshore wind farm, which will be located on the Kish and Bray Banks, approximately 10km from the coastline of counties Dublin and Wicklow. It is being developed by RWE, one of the world’s leading developers of renewable energy, and Irish renewable energy firm Saorgus Energy. RWE is leading the development on behalf of the partnership.

Once operational, the project will deliver up to 824MW of clean, renewable electricity and will consist of up to 50 wind turbines. This is enough energy to supply around 770,000 homes and reduce Ireland’s annual carbon emissions by over 1.4m tonnes per year. The final decision on the number of turbines will be informed by ongoing surveys and detailed design work.

The Dublin Array project will also bring significant economic benefits during its construction and operation, with over 1,000 construction phase jobs and 80 direct and 160 indirect full-time jobs expected during the 30-year operational phase. Dublin Array’s operations base is expected to be located within Dún Laoghaire, resulting in an estimated €540 million in local expenditure across the Greater Dublin Area.

Dublin Array was awarded its Maritime Area Consent (MAC) in December 2022. A MAC is required for any proposed Irish offshore wind farm development to be able to seek planning permission. Subject to planning permission, the project could be operational by 2028.

Published in Power From the Sea
Tagged under

Kish Offshore Wind Ltd and Bray Offshore Wind Ltd will be conducting geotechnical investigations on the Dublin Array project site and associated export cable corridor off the coast of counties Dublin and Wicklow from later this month.

The geotechnical investigations will include 27 vibrocores which will be sampled at locations within the offshore wind farm site. Project works will commence on Saturday 29 April and continue through to late May, subject to weather and operational constraints.

Investigations will be conducted within the Kish lease area, Bray lease area and the expert cable corridor, all of which are off the coast of counties Dublin and Wicklow.

Operations will be conducted by the multipurpose vessel Voe Vanguard (callsign MBEN9). The vessel will be positioned at each of the investigation points for approximately two hours, which may extend in the event of inclement weather.

The vessel is supplied with a VHF multi-channel radio and mobile phone. It will be operating 24 hours a day during the survey works and will display relevant lights and shapes as required under COLREGS.

All other vessels operating within the planned area of survey are requested to keep their distance and give a wide berth wherever possible.

Contact details, a map and coordinates of the survey area can be found in Marine Notice No 24 of 2023, attached below.

Published in Power From the Sea

The Department of Transport has been advised by Kish Offshore Wind Ltd and Bray Offshore Wind Ltd that geotechnical investigations will be conducted on the Dublin Array offshore wind farm project site off the coast of counties Dublin and Wicklow.

The project works will commence next Saturday 1 April and continue through to late May 2023, subject to weather and operational constraints.

The geotechnical investigation will include approximately seven boreholes which will be drilled at locations within the project work site.

Operations will be conducted by the Dutch Pearl (callsign PBZP), a support vessel/tug, and the Excalibur (callsign YJKQ5), a jack-up barge.

The Excalibur will be positioned at each of the investigation points for several days which may extend in the event of inclement weather. The Dutch Pearl will be assisting the Excalibur in its daily operations and towing the barge between investigation points. The standby tug will be at anchor on the project site and will be conducting transits between the site and Dublin Port.

Both vessels will display the relevant light and shapes as required under COLREGS. Both vessels will keep continuous watch on VHF Channels 16 and 72. During operations, the vessels will be restricted in their ability to manoeuvre. All other vessels are requested to leave a wide berth during the operations.

Contact details, relevant coordinates and a map of the work area ca be found in Marine Notice No 16 of 2023, attached below.

Published in Power From the Sea

Marine Notices No 37 of 2021 and No 44 of 2021 advised of the deployment of two wave buoys and one floating LiDAR buoy at the Dublin Array offshore wind farm on the Bray and Kish Banks.

The two wave buoys were recovered from site in June 2022. Now the Department of Transport has now been advised by Partrac Ltd that the floating LiDAR buoy on Bray Bank is scheduled to be recovered in the period between Thursday 5 and Thursday 19 January 2023, subject to weather and operational constraints.

The floating LiDAR buoy at Latitude 53° 10.645’ N, Longitude 005° 55.785' W has a square footprint with an area of 4 sqm and height of around 4m above the water line. It is yellow in colour and has a St Andrew cross on top.

It also contains a yellow light which emits five flashes every 20 seconds and is visible for up to three nautical miles.

The vessel CT Barnston (callsign MUZU5) will recover the buoy and tow it back to Wicklow Harbour for demobilisation. Dublin Port will be contacted in advance regarding the operations with estimated timings. The buoy will be towed some 30m astern of the CT Branston at a maximum speed of 3.5 knots.

During recovery of the floating LiDAR buoy on Bray Bank, the vessel will be restricted in its ability to manoeuvre. All other vessels are requested to leave a wide berth during the recovery and towing operations. Radio transmissions will be conducted with VTS and other seafarers to notify them of the buoy operations.

Contact details can be found in Marine Notice No 85 of 2022, attached below.

Published in Power From the Sea

Marine Notice 37 of 2021 advised of the deployment of one floating lidar buoy and two wave buoys at the Dublin Array offshore wind farm on the Bray and Kish Banks.

The Department of Transport has now been advised by Partrac Ltd that all three Metocean buoys are scheduled to be serviced soon over a period of two days.

Weather permitting, it is expected that the two wave buoys will be recovered and redeployed in the three-week period between tomorrow, Friday 11 February and Friday 4 March.

The floating lidar buoy will be towed from its location on Bray Bank to Wicklow Harbour for routine maintenance overnight and towed back to Bray Bank for redeployment in its current position. This recovery and redeployment will take place in the three-week period between Thursday 24 February 2022 and Friday 18 March.

The AMS Retriever (callsign MEHI8) will recover and redeploy all three buoys. The floating lidar buoy will be towed some 30 metres astern of the AMS Retriever at a maximum speed of 3.5 knots.

During this time, the vessel will be restricted in its ability to manoeuvre. As such, vessels operating within this area are requested to keep their distance, maintaining a safety zone around the deployment vessel, and pass at minimum speed to reduce vessel wash.

Radio transmissions will be conducted with VTS and other seafarers to notify them of the buoy operations.

Coordinates of the buoy locations and contact details can be found in Marine Notice No 10 of 2022, attached below.

Published in News Update

Following the Marine Notice two months ago on the deployment of wave buoys and a floating lidar buoy at the Dublin Array offshore wind farm, a new notice has been issued regarding the lidar buoy’s move to a fixed position.

Partrac Ltd will relocate the floating lidar buoy from its current temporary position at Kish Lighthouse to a new location in Bray Bank some time between this Wednesday 4 August and Tuesday 17 August, weather permitting.

The relocation is expected to take one day. The buoy will then remain in place for 18 months and a further Marine Notice will be issued providing information on the retrieval of the buoy.

The AMS Retriever (callsign MEHI8) will recover the buoy and tow it to its new location. During this work, the vessel will be restricted in its ability to manoeuvre.

As such, all other vessels operating within this area are requested to keep their distance, maintaining a safety zone around the AMS Retriever, and to pass at minimum speed to reduce vessel wash.

Further details including coordinates of the buoy’s new location are included in Marine Notice No 44 of 2021, which can be downloaded below.

Published in News Update

Partrac Ltd intend to deploy three Metocean buoys at the Dublin Array offshore wind farm in a one-day operation some time between this Wednesday 9 and Wednesday 23 June, weather permitting.

One floating lidar buoy and two wave buoys will be deployed by the AMS Retriever (callsign MEHI8) which will be displaying all appropriate lights and shapes.

The floating lidar buoy has a square footprint with an area of 4m2 and a height of some 4m above the water line. It is yellow in colour and has a St Andrew’s cross on top.

The wave buoys are spherical in shape with a diameter of around 1.1m. When deployed, the wave buoys appear clear with a yellow hull.

Both the floating lidar buoy and the wave buoys have a yellow light which emits five flashes every 20 seconds. The light is visible for up to three nautical miles.

The floating lidar buoy will be deployed for a period of four to eight weeks. It will then be moved to a permanent position in the south end of Dublin Array where it will be deployed for 18 months. The wave buoys will be deployed for a period of 12 months.

The floating lidar buoy will be towed approximately 30m astern of the AMS Retriever at a maximum speed of four knots.

As such, the vessel will be restricted in its ability to manoeuvre so all other boats operating in proximity are requested to keep their distance, maintaining a safety zone around the deployment vessel and pass at minimum speed to reduce vessel wash.

Details of the buoy locations are included in Marine Notice No 37 of 2021 which can be downloaded below.

Published in News Update

Mariners have been given notice of a series of geophysical surveys for the Dublin Array Wind Farm taking place between next week and early May.

The Dublin Array is a project on the Kish and Bray banks some 10 km off the east coast of Ireland, immediately south of Dublin.

As previously reported on Afloat.ie, the proposed Irish-German venture could see as many as 100 wind turbines generate power for more than half a million homes.

Fugro GB Marine Limited has been contracted for the geophysical surveys to characterise the offshore array and export cable search area, including exploring possible landfall options at Shanganagh Park and Poolbeg.

Operations across a total of four vessels are expected to begin next Tuesday 9 February and continue until Tuesday 11 May.

Details of the surveys and their coordinates are included in Fugro’s notice to mariners, which can be downloaded below.

Published in Dublin Bay

A €1.5 billion offshore wind farm stretching from Booterstown to Greystones could generate enough electricity to power 600,000 homes.

The Irish Times reports on proposals by an Irish-German partnership for the ‘Dublin Array’ offshore energy venture that could see as many as 100 wind turbines installed over 2,440 hectares, partly in Dublin Bay.

Saorgus and Innogy are now seeing a foreshore licence to conduct surveys in the intended locations of the Kish Bank and Bray Bank.

Pledges have been made to work with shipping companies, fishing interests, sailing clubs and other water users during this process, as the venture promises a “meaningful approach to supporting local communities”.

It is also hoped that the project would benefit from new Government supports guaranteeing revenue for renewable energy generators, a scheme which is currently under EU scrutiny.

The Irish Times has much more on the story HERE.

Published in Dublin Bay
Page 1 of 2

Royal Irish Yacht Club - Frequently Asked Questions

The Royal Irish Yacht Club is situated in a central location in Dun Laoghaire Harbour with excellent access and visiting sailors can be sure of a special welcome. The clubhouse is located in the prime middle ground of the harbour in front of the town marina and it is Dun Laoghaire's oldest yacht club. 

What's a brief history of the Royal Irish Yacht Club?

The yacht club was founded in 1831, with the Marquess of Anglesey, who commanded the cavalry at the Battle of Waterloo being its first Commodore. 

John Skipton Mulvany designed the clubhouse, which still retains a number of original architectural features since being opened in 1851.

It was granted an ensign by the Admiralty of a white ensign with the Coat of Arms of the Kingdom of Ireland beneath the Union Jack in canton.

Many prominent names feature among the past members of the Club. The first Duke of Wellington was elected in 1833, followed by other illustrious men including the eccentric Admiral Sir Charles Napier, Sir Dominic Corrigan the distinguished physician, Sir Thomas Lipton, novelist, George A. Birmingham, yachtsman and author, Conor O'Brien, and famous naval historian and author, Patrick O Brian. 

In the club's constitution, it was unique among yacht clubs in that it required yacht owners to provide the club's commodore with information about the coast and any deep-sea fisheries they encountered on all of their voyages.

In 1846, the club was granted permission to use the Royal prefix by Queen Victoria. The club built a new clubhouse in 1851. Despite the Republic of Ireland breaking away from the United Kingdom, the Royal Irish Yacht Club elected to retain its Royal title.

In 1848, a yachting trophy called "Her Majesty's Plate" was established by Queen Victoria to be contested at Kingstown where the Royal Irish Yacht Club is based. The Lord-Lieutenant of Ireland at the time, George Villiers, 4th Earl of Clarendon suggested it should be contested by the Royal Irish Yacht Club and the Royal St. George Yacht Club in an annual regatta, a suggestion that was approved by both clubs with the Royal St. George hosting the first competitive regatta.

The RIYC celebrated its 185th Anniversary in 2016 with the staging of several special events in addition to being well represented afloat, both nationally and internationally. It was the year the club was also awarded Irish Yacht Club of the Year as Afloat's W M Nixon details here.

The building is now a listed structure and retains to this day all its original architectural features combined with state of the art facilities for sailors both ashore and afloat.

What is the Royal Irish Yacht Club's emblem?

The Club's emblem shows a harp with the figure of Nice, the Greek winged goddess of victory, surmounted by a crown. This emblem has remained unchanged since the foundation of the Club; a symbol of continuity and respect for the history and tradition of the Royal Irish Yacht Club.

What is the Royal Irish Yacht Club's ensign?

The RIYC's original white ensign was granted by Royal Warrant in 1831. Though the Royal Irish Yacht Club later changed the ensign to remove the St George's Cross and replace the Union Jack with the tricolour of the Republic of Ireland, the original ensign may still be used by British members of the Royal Irish Yacht Club

Who is the Commodore of the Royal Irish Yacht Club?

The current Commodore is Jerry Dowling, and the Vice-Commodore is Tim Carpenter.

The RIYC Flag Officers are: 

What reciprocal club arrangements does the Royal Irish Yacht Club have?  

As one of Ireland's leading club's, the Royal Irish Yacht Club has significant reciprocal arrangements with yacht clubs across Ireland and the UK, Europe, USA and Canada and the rest of the World. If you are visiting from another Club, please have with a letter of introduction from your Club or introduce yourself to the Club Secretary or to a member of management staff, who will show you the Club's facilities.

What car parking does the Royal Irish Yacht Club have at its Dun Laoghaire clubhouse?

The RIYC has car parking outside of its clubhouse for the use of its members. Paid public car parking is available next door to the club at the marina car park. There is also paid parking on offer within the harbour area at the Coatl Harbour (a 5-minute walk) and at an underground car park adjacent to the Royal St. George Yacht Club (a 3-minute walk). Look for parking signs. Clamping is in operation in the harbour area.

What facilities does the Royal Irish Yacht Clubhouse offer? 

The Royal Irish Yacht Club offers a relaxed, warm and welcoming atmosphere in one of the best situated and appointed clubhouses in these islands. Its prestige in yachting circles is high and its annual regatta remains one of the most attractive events in the sailing calendar. It offers both casual and formal dining with an extensive wine list and full bar facilities. The Club caters for parties, informal events, educational seminars, themed dinners and all occasions. The RIYC has a number of venues within the Club each of which provides a different ambience to match particular needs.

What are the Royal Irish Yacht Club's Boathouse facilities?

The RIYC boathouse team run the launch service to the club's swinging moorings, provide lifting for dry-sailed boats, lift and scrub boats, as well as maintaining the fabric of the deck, pontoon infrastructure, and swinging moorings. They also maintain the club crane, the only such mobile crane of the Dun Laoghaire Yacht Clubs.

What facilities are offered for junior sailing at the Royal Irish Yacht Club?

One of the missions of the Royal Irish Yacht Club is to promote sailing as a passion for life by encouraging children and young adults to learn how to sail through its summer courses and class-specific training throughout the year. 

RIYC has an active junior section. Its summer sailing courses are very popular and the club regularly has over 50 children attending courses in any week. The aim is for those children to develop lifelong friendships through sailing with other children in the club, and across the other clubs in the bay.
 
Many RIYC children go on to compete for the club at regional and national championships and some have gone on to represent Ireland at international competitions and the Olympic Regatta itself.
 
In supporting its young sailors and the wider sailing community, the RIYC regularly hosts junior sailing events including national and regional championships in classes such as the Optmist, Feva and 29er.
 
Competition is not everything though and as the club website states:  "Many of our junior sailors have gone on the become sailing instructors and enjoy teaching both in Ireland and abroad.  Ultimately, we take most pleasure from the number of junior sailors who become adult sailors and enjoy a lifetime of sailing with the club".