Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: transfer

Dundalk Port could come back under local ownership, after Louth County Council confirmed it hopes to be ready to begin the transfer process before the end of the year.

The port has been under the auspices of Dublin Port since 2011, and is currently operated under licence by a private company.

Cllr. Marianne Butler sought an update on Dundalk Port at the county council’s monthly meeting on Monday.

Chief Executive Joan Martin told councillors that discussions had been taking place with Dublin Port, and that risk assessments and “due diligence” was being carried out by the local authority.

More The ArgosDundalk reports on the Co.Louth port.

Published in Irish Ports

#irishports - New Ross Port is to be transferred to Wexford County Council within the coming months and will lead to great opportunities for the development of the quays area of the town.

As NewRoss Standard writes, this is the view of director of services for economic development with Wexford County Council, Tony Larkin who addressed the monthly meeting of New Ross Municipal District.

Mr Larkin said the 'bottom tier' ports in Ireland are being transferred to local authorities.

'It's New Ross' turn. We have been in negotiations with the Department of Transport for two years. We've been doing due diligence on the port company and I compliment the work of the port company.'

He said the company is being disbanded and will merge into the council.

Mr Larkin said the transfer could occur as soon as May or June, and would have already taken place if not for some cost issues involving the removal of the oil tanks on the quay and the cost of draining the Barrow.

For the transfer to take place three ministers have to sign the transfer letter.

For further reading on this development at the inland port click here.

Published in Irish Ports

#SHIPPING - The transfer of cargo from the damaged oil tanker sheltering at the entrance to Belfast Lough has been posponed for at least two more days.

As previously reported on Afloat.ie, the 228-metre Germar Companion - which is carrying 54,000 tonnes of vacuum gas oil - was redirected to Belfast after reporting a cracked hull en route from Rotterdam to New York.

The merchant vessel has been sheltering off the Copeland Islands since 16 December, where an official examination recommended removal of the cargo.

Today (31 December 2011) had been the scheduled start date for the move of the tanker's hazardous cargo by ship-to-ship tranfer. But the move has been delayed as the second ship, the BW Seine, is still en route to Belfast Lough.

"It is currently in the North Sea and could take another two days before it reaches the vessel and starts to transfer the cargo," a coastguard spokesperson told the Belfast Telegraph.

The transfer will be managed by specialist company Fendercare Marine in the lough, and could take between 24 and 36 hours. Once finished, the Germar Companion will sail into Belfast for repairs.

Published in Ports & Shipping

About the Melges 15 Dinghy

The Melges 15 was designed by Reichel/Pugh and built by Melges.

The design prioritises stability, comfort, ease of use, and performance. 

The Melges 15 is built to be sailed by everyone from friends and couples to families and kids. The design offers performance, comfort, and stability in one sleek package.

The Melges 15’s stable hull shape and ergonomic cockpit make it a suitable layout for adult racing and educational sailing. Easy conversion from a club configuration (non-spinnaker) to a one-design setup, provides more versatility to club programs and options for individual owners.

“The Melges 15 creates a clear pathway for junior sailors to get started and stay excited about sailing while also being comfortable and accessible enough for adults to learn, race, or cross-train,” according to Harry Melges III.

With the main design goals focused on stability and performance in various conditions, the boat features a narrow overall beam and a flat cross-section shape for stability, righting moment, and ease of planing. For a more forgiving feel upwind and to navigate larger sea states, the Melges 15 has just the right amount of fore and aft rocker.

Melges conducted extensive research and product testing to produce this layout factoring in cockpit depth, backbone height, and floor plan. The result, they say, is a comfortable environment for both the skipper and crew. The deeper cockpit takes the load off the sailor’s knees helping them feel locked into the boat while the high boom and gnav vang system work together to make the boat easier to manoeuvre.

The asymmetric spinnaker offers an additional performance element, while the single-pull launch and retrieval system makes handling the sail easy and fast.

 

At a Glance - Melges 15 Specifications

  • LENGTH 15 ft 
    BEAM 5 ft 6 in
    DRAFT 2 ft 7 in 
    HULL WEIGHT 230 lbs
  • SAIL AREA
    MAIN 93.6 sq ft 
    JIB 39.8 sq ft 
    ASYMMETRICAL SPINNAKER 156 sq ft 
  • CREW 2

Featured Sailing School

INSS sidebutton

Featured Clubs

dbsc mainbutton
Howth Yacht Club
Kinsale Yacht Club
National Yacht Club
Royal Cork Yacht Club
Royal Irish Yacht club
Royal Saint George Yacht Club

Featured Brokers

leinster sidebutton

Featured Webcams

Featured Associations

ISA sidebutton
ICRA
isora sidebutton

Featured Marinas

dlmarina sidebutton

Featured Chandleries

CHMarine Afloat logo
https://afloat.ie/resources/marine-industry-news/viking-marine

Featured Sailmakers

northsails sidebutton
uksails sidebutton
watson sidebutton

Featured Blogs

W M Nixon - Sailing on Saturday
podcast sidebutton
BSB sidebutton
wavelengths sidebutton
 

Please show your support for Afloat by donating