Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Galway Harbour News

#OPV90named - A new Irish Naval Service vessel costing in the region of €66m has been formally commissioned at a ceremony in Galway Port, reports RTE News.

After an address by the Taoiseach at Galway Harbour yesterday, the LÉ William Butler Yeats (P63) was officially named by a granddaughter of the poet, Caitriona Yeats.

The formal commissioning followed, before Lieutenant Commander Eric Timon led the crew aboard.

The LÉ William Butler Yeats replaces the LÉ Aisling in the naval fleet, after the latter was decommissioned last May.

Afloat adds that the third OPV90 class newbuild built by Babcock Marine, Appledore in the UK had paid a visit to Dun Laoghaire Harbour in late September.

She follows leadship LÉ Samuel Beckett and LÉ James Joyce, also completed by the north Devon shipyard. In recent weeks this pair switched deployment duties in providing humanitarian operations in the Mediterranean Sea. 

 

Published in Navy

#Decommissioning - Minister with Responsibility for Defence, Mr Paul Kehoe, yesterday attended the decommissioning ceremony of LÉ Aisling in Galway Docks.

LÉ Aisling was the longest serving vessel in the Irish Naval Service fleet. The ‘Deirdre’ class vessel built by Verolme Cork Dockyard was also an improved version as the final third ‘Emer’ class. She entered service in 1980.

The decommissioning ceremony took place of LÉ Aisling alongside Molvoy Quay at the port's Dun Aengus Dock. The direct successor will be newbuild OPV90 class LÉ William Butler Yeats which is to undergo builder’s trials next month.

Also previously reported on Afloat.ie the Government has placed an order for a fourth OPV90 'Beckett' class costing €54.3m from Babcock International’s north Devon yard.

In his address Minister Kehoe stated that: LÉ Aisling has been decommissioned after 36 years of outstanding service to the State and noted that during this time she travelled in excess of 628,000 nautical miles, an equivalent of circumnavigating the globe 32 times. Her crew has boarded over 5,500 vessels at sea and detained over 220 fishing vessels.

The Minister recalled that during her service, LÉ Aisling has been involved in many successful operations. The most notable of these include the arrest of the ‘Marita Ann’ in 1984 and her activities as the first vessel on the scene of the Air India disaster in 1985, for which several of her crew were decorated.

The Minister also stated: In pursuit of our commitment to progress the Ships Replacement Programme, the Government has provided a significant increase in capital funding to enhance the capabilities across the Defence Forces. The replacement vessel for LÉ Aisling, LÉ William Butler Yeats is scheduled for delivery shortly and the signing of contracts this week for delivery of a fourth vessel (see above), represent tangible demonstrations of this commitment.

LÉ Aisling is twinned with Galway and has had a long association with the city. The minister also praised the men and women who sailed on LÉ Aisling throughout her years of service, and marked out the great pride they had shown in her close association with the city and the many thousands of euro raised by them on behalf of the Children’s Ward in Galway University Hospital.

Published in Navy

#PortExpansion - The Connacht Tribune writes that the Government has no intention of providing Galway Harbour with part-financing to enable expansion plans.

Shane Ross, the new Transport Minister, reiterated in Dáil Éireann that the State would not be funding the project, which is currently being assessed by An Bórd Pleanála.

“With regard to funding for ports, National Ports Policy 2013 clearly outlines that all port infrastructure development must be funded by the port companies, including Galway, on a commercial basis without recourse to the Exchequer,” said Minister Ross.

An oral hearing into the proposed €126 million development was held in January 2015.

For more on the story, click here

Published in Galway Harbour

#DisappointedPort - Disappointment has been expressed by the Port of Galway at the delay in issuing a decision on the multi-million euro harbour extension, stating that it is difficult to plan for the future under such uncertainty.

The Galway Independent writes it has been almost two and a half years since the planning application to extend the port was submitted and the wait for a decision looks set to continue until the end of the year at least.

The €126 million port extension is a four-phase development that involves reclaiming 27 hectares of bay area, providing a new marina and berths which will see the biggest cruise liners in the world being able to dock at the harbour in the heart of the city.

The long awaited decision rests with An Bord Pleanala, who stated this week that they will be holding meetings with the National Parks and Wildlife Service and the applicant. These meetings have yet to be arranged.

Eamon Bradshaw, Chief Executive of the Port of Galway said, “The delay in issuing a formal decision is disappointing and whether the decision is for or against the port it is difficult for a commercial enterprise to deal with the uncertainty of the outcome of a planning application which planning was applied for in January 2014 or almost 2.5 years ago.”

He added that it is hoped that a formal decision will issue, at the latest, before the end of this year. “Should that decision be positive it is expected that the building of phase 1 would commence before the end of 2017 and complete by 2020,” Mr Bradshaw added.

At the weekend, Galway welcomed two cruise liners, the Astoria and L’Austral and passengers were tendered ashore from the ships.

For more the click the newspaper's report here. 

Published in Galway Harbour

#Exclusion - The only port in Ireland to be excluded from a special EU fund is Galway Harbour and it’s future could be in jeopardy unless the situation is tackled, reports Galway Bay FM.

CEO of Galway Harbour Eamon Bradshaw says that the recent downgrade of the facility to a Port of Regional Significance means it does not quality for European funding.

He says that only ports classified as tier one or tier two facilities are entitled to assistance from the Ten-T Connecting Europe programme – assistance that the Port urgently needs. For more click here.

Published in Galway Harbour

#NaomhÉanna - In a bid to bring the Naomh Éanna back to Galway, a new campaign has been launched according to Galway Bay FM. The historic vessel once carried passengers between the city and the Aran Islands, before being withdrawn from service in 1989.

It has been lying derelict in Ringsend, Dublin for over two decades. However, the engine room of the ship is still operational, and campaigners say if enough funds are raised, as previously reported on Afloat.ie, it will be possible to sail the vessel back to Galway as a major tourist attraction. 

To read more click here on the veteran vessel that campaigners saved following controversial plans by Waterways Ireland to scrap her at Grand Canal Basin. 

Published in Historic Boats

#Postponed- Minister for Transport and Tourism Paschal Donohoe TD, following cross party lobbying, on Wednesday announced he was to postpone signing the transfer of Port of Galway to Galway City Council for at least 18 months, which has been welcomed by Galway Chamber.

Speaking after the announcement President of Galway Chamber Frank Greene said that this will give time for the completion of the planning process as previously reported on Afloat.ie

The Galway Independent has more on the port postponement.

Published in Galway Harbour

#PortEnvironment - Environmental compensatory measures made as part of the Galway Harbour Company’s plans for the expansion of the city’s docks will it is hoped by the port accepted by the National Parks and Wildlife Service.

According to Galway Bay FM (which has more here), the port company has sent a report to the NPWS in order to comply with requirements of An Bord Pleanála.

A meeting is due to take place between Galway Harbour Company and the NPWS once the report has been considered by the NPWS, with a view to sending a formal report to the planning authority.

In September, as previously reported on Afloat.ie, the harbour company was invited to progress plans for a port expansion through the fast-track IROPI process.

Published in Galway Harbour

#GalwayPortPlan – The Connacht Tribune reports that the decision on Galway Harbour on the proposed redevelopment of the docks will be announced by An Bórd Pleanála next Friday, September 11.

The planning appeals board has been deliberating on plans for the €126 million redevelopment of the docks since an oral hearing took place in January.

The proposal has the potential to transform the face of Galway into the next century, according to proponents of the projects. The 85.4 hectare project, which is expected to take eight years to construct, will be built in four phases.

For more on the proposed expansion of the mid-west port, click this link.

Note the newspaper has a photo of the harbour showing leisure craft and commercial shipping sharing the port's Dún Aengus Dock.

On the right side can be seen the stern of the aptly named Galway Fisher, an oil products tanker that regularly calls to the port which requires a very skillful approach (see video) through the dock chamber.

Published in Galway Harbour

#DelayedDecision – It has been confirmed by An Bórd Pleanála that it has delayed making a decision on the planning application to redevelop Galway Harbour, writes The Connacht Tribune.

The oral hearing into the proposed €126 million extension of the harbour was held in January and a decision was due in April or May. However, the planning appeals board has confirmed that the decision date has been pushed back by several weeks.

"The decision on this case has been deferred," a spokesperson said.

Asked why it had been deferred, the spokesperson added: "It's the general complexity of the issues in the case." It is the first application in the State to use the 'IROPI' route, which would allow a significant infrastructural development on a designated European habitat on the basis of 'Imperative Reasons of Overriding Public Interest'.

An Bórd Pleanála planners heard evidence from experts during an oral hearing that lasted over two weeks earlier this year as previously reported on Afloat.ie

For more on the story, click here.

Published in Galway Harbour
Page 1 of 3

Howth 17 information

The oldest one-design keelboat racing class in the world is still competing today to its original 1897 design exclusively at Howth Yacht club.

Howth 17 FAQs

The Howth 17 is a type of keelboat. It is a 3-man single-design keelboat designed to race in the waters off Howth and Dublin Bay.

The Howth Seventeen is just 22ft 6ins in hull length.

The Howth 17 class is raced and maintained by the Association members preserving the unique heritage of the boats. Association Members maintain the vibrancy of the Class by racing and cruising together as a class and also encourage new participants to the Class in order to maintain succession. This philosophy is taken account of and explained when the boats are sold.

The boat is the oldest one-design keelboat racing class in the world and it is still racing today to its original design exclusively at Howth Yacht club. It has important historical and heritage value keep alive by a vibrant class of members who race and cruise the boats.

Although 21 boats are in existence, a full fleet rarely sails buy turnouts for the annual championships are regularly in the high teens.

The plans of the Howth 17 were originally drawn by Walter Herbert Boyd in 1897 for Howth Sailing Club. The boat was launched in Ireland in 1898.

They were originally built by John Hilditch at Carrickfergus, County Down. Initially, five boats were constructed by him and sailed the 90-mile passage to Howth in the spring of 1898. The latest Number 21 was built in France in 2017.

The Howth 17s were designed to combat local conditions in Howth that many of the keel-less boats of that era such as the 'Half-Rater' would have found difficult.

The original fleet of five, Rita, Leila, Silver Moon, Aura and Hera, was increased in 1900 with the addition of Pauline, Zaida and Anita. By 1913 the class had increased to fourteen boats. The extra nine were commissioned by Dublin Bay Sailing Club for racing from Kingstown (Dún Laoghaire) - Echo, Sylvia, Mimosa, Deilginis, Rosemary, Gladys, Bobolink, Eileen and Nautilus. Gradually the boats found their way to Howth from various places, including the Solent and by the latter part of the 20th century they were all based there. The class, however, was reduced to 15 due to mishaps and storm damage for a few short years but in May 1988 Isobel and Erica were launched at Howth Yacht Club, the boats having been built in a shed at Howth Castle - the first of the class actually built in Howth.

The basic wooden Howth 17 specification was for a stem and keel of oak and elm, deadwood and frames of oak, planking of yellow pine above the waterline and red pine below, a shelf of pitch pine and a topstrake of teak, larch deck-beams and yellow pine planking and Baltic spruce spars with a keel of lead. Other than the inclusion of teak, the boats were designed to be built of materials which at that time were readily available. However today yellow pine and pitch pine are scarce, their properties of endurance and longevity much appreciated and very much in evidence on the original five boats.

 

It is always a busy 60-race season of regular midweek evening and Saturday afternoon contests plus regattas and the Howth Autumn League.

In 2017, a new Howth 17 Orla, No 21, was built for Ian Malcolm. The construction of Orla began in September 2016 at Skol ar Mor, the boat-building school run by American Mike Newmeyer and his dedicated team of instructor-craftsmen at Mesquer in southern Brittany. In 2018, Storm Emma wrought extensive destruction through the seven Howth Seventeens stored in their much-damaged shed on Howth’s East Pier at the beginning of March 2018, it was feared that several of the boats – which since 1898 have been the very heart of Howth sailing – would be written off. But in the end only one – David O’Connell’s Anita built in 1900 by James Clancy of Dun Laoghaire – was assessed as needing a complete re-build. Anita was rebuilt by Paul Robert and his team at Les Ateliers de l’Enfer in Douarnenez in Brittany in 2019 and Brought home to Howth.

The Howth 17 has a gaff rig.

The total sail area is 305 sq ft (28.3 m2).

©Afloat 2020