Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Marine Notice

The European Communities (Safe Loading and Unloading of Bulk Carriers) (Amendment) Regulations 2024 (SI No 110 of 2024) entered into force on 27 March 2024.

Changes to the regulations for the safe loading and unloading of bulk carriers now apply to all shipping terminals visited by bulk carriers for the loading or unloading of solid bulk cargoes, except those which are only visited by bulk carriers in exceptional circumstances.

The update also clarifies the requirements for regular verifications and unannounced inspections to be carried out by the Maribe Survey Office (MSO), and sets out the revised penalties for infringements.

For further details on the new regulations, see Marine Notice No 22 of 2024 attached below.

Published in Ports & Shipping

The Department of Transport has been notified by JD-Contractor that they will be performing out-of-service cutting and route clearance works on behalf of Nexans for CIDAC as part of the Celtic Interconnector Project.

The works will be located at various points along the planned subsea electricity cable route between the southeast coast of Ireland and the northern coast of France.

Works will begin on Wednesday 24 April and will continue for approximately 10 days, subject to weather and operational constraints.

The out-of-service (OOS) cable-cutting operations will be conducted within the cable corridor extending plus or minus 50 metres each side of planned cable centreline. The relevant waypoints can be found in Marine Notice No 20 of 2024, attached below.

The works will be conducted by the vessel MV Detector (callsign OUIV2) which will display the relevant lights and shapes during periods of restricted manoeuvrability and adhere to the International Regulations for the Prevention of Collisions at Sea (COLREGS) and all licensing requirements.

During OOS cutting operations, the vessel will keep a listening watch on VHF Channel 16 and will actively transmit an AIS signal. A listening watch will also be maintained on VTS VHF channels as appropriate. The vessel will broadcast daily, and at shorter intervals as may be required by passing traffic, the vessel position, operational information and planned operations for the next 24 hours.

Maps and coordinates as well as contact details are included in the Marine Notice below.

Published in Power From the Sea

The Department of Transport has been advised by Dublin Array that they will be conducting geophysical, geotechnical and environmental surveys for the Dublin Array offshore wind farm project.

Site investigation operations for the wind farm and the Expert Corridor Route (ECR) between the coast of Dublin and Wicklow will take place between Friday 19 April and the end of July, subject to weather and operational constraints.

The geophysical survey will be carried out by the vessel Fugro Helmert (callsign C6FT8). During these operations, the vessel will be towing equipment at a depth of up to five metres below the surface and extending some 300 metres astern.

The geotechnical survey will be carried out by the vessel M/V Flat Holm (callsign GHLZ) at fixed stations. The environmental survey will be carried out by the vessel Ros Áine (callsign EIZG5) in daytime hours only.

All vessels will be mobilised from Dun Laoghaire and will be restricted in their ability to manoeuvre, therefore all other mariners are advised to provide a wide berth and navigate with caution in the relevant area.

Coordinates and a map of the survey area, as well as contact details, can be found in Marine Notice No 18 of 2024, attached below.

Published in Power From the Sea

Fuinneamh Sceirde Teoranta (FST) will be undertaking both a geotechnical survey and geophysical survey for the Sceirde Rocks Windfarm Project in the Western Coastal Area (Connemara/Outer Galway Bay) and Atlantic Ocean, between Monday 15 April and Monday 10 June, subject to weather and operational constraints.

These surveys follow last September’s geophysical survey and will be undertaken by the multi-purpose offshore vessel Dina Polaris (callsign CQOF), which is fitted with a geotechnical drilling rig, and the research vessel Lady Kathleen (callsign EIXT2). Both vessels will operate up to 24 hours per day and will be displaying the appropriate lights and shapes.

During operations, the vessels will be restricted in their ability to manoeuvre. Therefore, passing vessels are requested to leave a wide berth during the deployment operations. Radio transmissions will be conducted with other seafarers to notify them of the operations. The vessels will be monitoring VHF Channel 16 at all times for safety purposes.

The equipment for each survey will be deployed within the bounds of the survey areas detailed in Marine Notice No 17 of 2024, attached below.

Published in Power From the Sea

Following cable lay operations set to conclude this weekend, Greenlink Interconnector Ltd will perform cable burial and trenching activities along the planned interconnector route.

These activities will be undertaken between Saturday 13 April and Thursday 20 June, subject to weather and operational constraints.

Operations will take place along the planned interconnector route between the landfall location near Baginbun Beach in Co Wexford and the middle of the Irish Sea. Coordinates and maps can be found in Marine Notice No 21 of 2024, attached below.

The works will be performed by the trenching support vessel Symphony (callsign LXTT). This vessel will have a trenching vehicle deployed or a remotely operated vehicle for survey activities deployed over the side.

As the work vessel will be restricted in its ability to manoeuvre, all other vessels operating within this area are requested to keep a wide berth and pass at minimum speed to reduce vessel wash. The work vessel will be listening to VHF Channel 16 and can set any other channel as required.

For further details, including contact information, see the Marine Notice below.

Published in News Update

Following the first and second legs in February and March, the third leg of this year’s Irish Anglerfish and Megrim Survey (IAMS 2024) is being carried out from Friday 12 to Sunday 21 April.

Surveys will be conducted to the North and North-West Coasts of Ireland by the Marine Institute in fulfilment of Ireland’s obligations under the Common Fisheries Policy (CFP).

Leg 3 is a demersal trawl survey consisting of approximately 50 otter trawls, each of 60 minutes duration, in ICES area 6a. Fishing in 2024 will take place within a three-nautical-mile radius of the positions indicated in Appendices 1 and 2 of Marine Notice No 12 of 2024, a PDF of which is attached below.

The survey will be conducted by the RV Celtic Explorer (callsign EIGB) which will display appropriate lights and signals. The vessel will be towing a Jackson demersal trawl during fishing operations.

The Marine Institute requests that commercial fishing and other marine operators keep a 3nm radius area around the tow points clear of any gear or apparatus during the survey period.

Further details are included in the Marine Notice below.

Published in Fishing

The Department of Transport has been advised that Next Geosolutions will perform shallow geotechnical surveys, pUXO ID surveys and KP5 Omega Loop surveys as part of the Celtic Interconnector Project cable route between the South-East Coast of Ireland and the coast of France.

The survey is expected to be completed over a 10-day period from this Wednesday 10 April, subject to weather and operational constraints.

Survey operations will be conducted within the cable corridor extending around 50m each side of the planned cable centreline.

The survey vessel NG Worker (callsign ICID) will carry out the survey works. Mariners are advised to provide a wide berth and navigate with caution in the area.

During survey operations, the vessel will keep a listening watch on VHF Channel 16 and will actively transmit an Automatic Identification System (AIS) signal. A listening watch will also be maintained on VTS VHF channels as appropriate.

The survey vessel shall broadcast daily, and at shorter intervals as may be required by passing traffic, the vessel position, operational information and planned operations for the next 24 hours. It is requested that fixed fishing gear within 1,000m of the route centreline be removed.

Coordinates and a map of the survey area as well as contact details can be found in Marine Notice No 13 of 2024 attached below.

Published in Power From the Sea

Following the recent pre-lay grapnel run, Greenlink Interconnector Ltd will be conducting offshore and nearshore operations for its electricity interconnector from Friday 22 March to Sunday 14 April, subject to weather and operational constraints.

Beach-pull operations in the nearshore are to be undertaken within around one nautical mile of Baginbun Beach. The cable lay operations following the beach pull operations, involving divers, will take place along the planned interconnector route from the landfall location at Baginbun Beach towards the middle of the interconnector route.

The operations will be conducted by three survey vessels: the multicat Forth Warrior (callsign 2JHR8), Connector (DP3) (callsign LXEV) and CRC Voyager (callsign MBZZ7).

These vessels carrying out the works will be restricted in their ability to manoeuvre, therefore all other passing vessels are requested to keep a wide berth and pass at minimum speed to reduce vessel wash. The vessels will display the appropriate lights and shapes if applicable (two black spheres and in the middle a black diamond shape, in a vertical line) and will monitor VHF Channel 16 at all times.

Coordinates and a map of the work area as well as contact details can be found in Marine Notice No 16 of 2024 attached below.

Published in News Update

As previously reported on Afloat.ie, Greenlink Interconnector Ltd is proposing to develop an electricity interconnector to allow for offshore cable installation and burial at a later stage.

A pre-lay grapnel run (PLGR) will be performed along the planned interconnector route to ensure clearance of debris from this Friday 15 March to next Tuesday 19 March, subject to weather and operational constraints.

During the PLGR, a grapnel shall be deployed on the planned cable route and dragged over the seabed. Whenever an increase in tension is recorded or in any case at five-kilometre intervals, the grapnel will be recovered cleaned and inspected. Afterwards, the grapnel will be redeployed to the seabed. The operation will be repeated until the complete route of about 80km has been finished.

The PLGR operations will take place along the planned interconnector route from the landfall location at Baginbun Beach towards the middle of the interconnector route.

Operations will be performed by the Forth Warrior (callsign 2JHR8). The vessel will have the PLGR grapnel deployed on the bow roller.

As the vessel will be restricted in its ability to maneuver, all other vessels operating within this area are requested to keep a wide berth and pass at minimum speed to reduce vessel wash. The vessel will be listening to VHF Channel 16 and can set any other channel as required.

Coordinates and a map of the work area as well as contact details can be found in Marine Notice No 15 of 2024, available to read or download HERE.

Published in News Update

The Marine Survey Office (MSO) of the Department of Transport has appointed four companies to the panel as Recognised Security Organisations (Ports) for the period covering 1 January 2024 to 31 December 2028.

These companies appointed as RSOs for the creation of port security assessments, port facility security assessments, port security plans and port facility security plans are as follows:

CMG (Crime Management Group),
Regus House,
Harcourt Road,
Dublin,
D02 HW77
Tel: +353 1 417 4242
Email: [email protected]

Crime Management Services,
Block B, The Crescent Building,
Northwood, Santry,
Dublin D09 C6X8
Tel: +353 1 893 4906
Email: [email protected]

Bureau Veritas Marine and Offshore UK and Ireland
1 & 2, Keel House,
South Shields
NE34 9PY, United Kingdom
Tel: +44 (0) 191 427 8170
Email: [email protected]

Seaport Services Crann Centre,
Classis, Ovens,
Co Cork P31 TX39
Tel. +353 86 190 1913/+353 87 237 8103
Email: [email protected]

The appointment will cover work as an RSO in relation to both Regulation (EC) No 725/2004 and Directive 2005/65/EC on Port Security.

Published in Ports & Shipping
Page 1 of 54

The 2024 Vendée Globe Race

A record-sized fleet of 44 skippers are aiming for the tenth edition of the Vendée Globe: the 24,296 nautical miles solo non-stop round-the-world race from Les Sables d’Olonne in France, on Sunday, November 10 2024 and will be expected back in mid-January 2025.

Vendée Globe Race FAQs

Six women (Alexia Barrier, Clarisse Cremer, Isabelle Joschke, Sam Davies, Miranda Merron, Pip Hare).

Nine nations (France, Germany, Japan, Finland, Spain, Switzerland, Australia, and Great Britain)

After much speculation following Galway man Enda O’Coineen’s 2016 race debut for Ireland, there were as many as four campaigns proposed at one point, but unfortunately, none have reached the start line.

The Vendée Globe is a sailing race round the world, solo, non-stop and without assistance. It takes place every four years and it is regarded as the Everest of sailing. The event followed in the wake of the Golden Globe which had initiated the first circumnavigation of this type via the three capes (Good Hope, Leeuwin and Horn) in 1968.

The record to beat is Armel Le Cléac’h 74 days 3h 35 minutes 46s set in 2017. Some pundits are saying the boats could beat a sub-60 day time.

The number of theoretical miles to cover is 24,296 miles (45,000 km).

The IMOCA 60 ("Open 60"), is a development class monohull sailing yacht run by the International Monohull Open Class Association (IMOCA). The class pinnacle events are single or two-person ocean races, such as the Route du Rhum and the Vendée Globe.

Zero past winners are competing but two podiums 2017: Alex Thomson second, Jérémie Beyou third. It is also the fifth participation for Jean Le Cam and Alex Thomson, fourth for Arnaud Boissières and Jérémie Beyou.

The youngest on this ninth edition of the race is Alan Roura, 27 years old.

The oldest on this ninth edition is Jean Le Cam, 61 years old.

Over half the fleet are debutantes, totalling 18 first-timers.

The start procedure begins 8 minutes before the gun fires with the warning signal. At 4 minutes before, for the preparatory signal, the skipper must be alone on board, follow the countdown and take the line at the start signal at 13:02hrs local time. If an IMOCA crosses the line too early, it incurs a penalty of 5 hours which they will have to complete on the course before the latitude 38 ° 40 N (just north of Lisbon latitude). For safety reasons, there is no opportunity to turn back and recross the line. A competitor who has not crossed the starting line 60 minutes after the signal will be considered as not starting. They will have to wait until a time indicated by the race committee to start again. No departure will be given after November 18, 2020, at 1:02 p.m when the line closes.

The first boat could be home in sixty days. Expect the leaders from January 7th 2021 but to beat the 2017 race record they need to finish by January 19 2021.

Today, building a brand new IMOCA generally costs between 4.2 and €4.7million, without the sails but second-hand boats that are in short supply can be got for around €1m.

©Afloat 2020

Vendee Globe 2024 Key Figures

  • 10th edition
  • Six women (vs six in 2020)
  • 16 international skippers (vs 12 in 2020)
  • 11 nationalities represented: France, United Kingdom, Switzerland, Germany, Italy, Belgium, Hungary, Japan, China, USA, New Zealand (vs 9 in 2020)
  • 18 rookies (vs 20 in 2020)
  • 30 causes supported
  • 14 new IMOCAs (vs 9 in 2020)
  • Two 'handisport' skippers

At A Glance - Vendee Globe 2024

The 10th edition will leave from Les Sables d’Olonne on November 10, 2024

Featured Sailing School

INSS sidebutton

Featured Clubs

dbsc mainbutton
Howth Yacht Club
Kinsale Yacht Club
National Yacht Club
Royal Cork Yacht Club
Royal Irish Yacht club
Royal Saint George Yacht Club

Featured Brokers

leinster sidebutton

Featured Webcams

Featured Associations

ISA sidebutton
ICRA
isora sidebutton

Featured Marinas

dlmarina sidebutton

Featured Chandleries

CHMarine Afloat logo
https://afloat.ie/resources/marine-industry-news/viking-marine

Featured Sailmakers

northsails sidebutton
uksails sidebutton
watson sidebutton

Featured Blogs

W M Nixon - Sailing on Saturday
podcast sidebutton
BSB sidebutton
wavelengths sidebutton
 

Please show your support for Afloat by donating