Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: EirGrid Interconnector

TechWorks Marine Ltd is deploying trawl-resistant bottom mounted Acoustic Doppler Current Profiler (ADCP) frames in Waterford Harbour this week.

It is anticipated that the ADCPs will be deployed between today, Monday 8 July, and this Friday 12 July, depending on the weather. If the deployment is delayed due to the weather, it will be carried out on the next viable tide and weather window. Update: the ADCPs will now be deployed on or after Thursday 18 July.

The frames will be deployed from the vessel James (callsign EITT2). The frames will be on the seafloor for a minimum period of one calendar month and a maximum period of two months (weather permitting).

The ADCPs will be measuring currents through the water column at each location over the deployment. This data will be used to validate a hydrodynamic model of the area being developed for Irish Water.

Each frame will have one ADCP sensor, an acoustic pinger, an acoustic release and a rigid recovery buoy.

The frames are approximately 1m2 and will remain on the seafloor for a period of up to 30 days, after which the frame will be retrieved using the acoustic release and recovery buoy.

There will be no surface marker during the extent of deployment so vessel traffic will not need to avoid the area but should be aware of its presence.

Details of the relevant co-ordinates are included in Marine Notice No 22 of 2019, a PDF of which is available to read or download HERE.

Meanwhile, planned cable survey works on the EirGrid East West Interconnector are being carried out by the vessel Deep Helder (callsign PBYU) until this Thursday 11 July. During this survey, the vessel will be deploying underwater survey equipment along a thin 50m corridor.

Fishermen are advised not to leave any static fishing equipment in the vicinity of the survey route (250 metres) and keep a safe distance of at least one nautical mile from the survey vessels that will be operating with towed equipment and will have restricted manoeuvrability.

In addition, the survey vessel Ping will carry out operations in the near-shore waters off Rush, Co Dublin from next Monday 15 July. Near-shore survey operations will take place between beach HW mark and the 10m water depth contour.

Details of co-ordinates and survey contacts are included in Marine Notice No 21 of 2019, a PDF of which is available to read or download HERE.

Published in Marine Warning

About SailGP

SailGP unites world-class athletic talent and cutting-edge technology. Eight teams representing Australia, Denmark, France, Great Britain, Japan, New Zealand, Spain and the United States will contest eight events held in as many countries over an 11-month period. Following the season opener in Bermuda, the championship visits renowned sailing locations in Italy, the United Kingdom, Denmark, France, Spain and New Zealand. San Francisco, United States, has the honour of closing proceedings with the Grand Final on 26–27 March 2022. Among those vying for the crown is the Great Britain team led by Rolex Testimonee and four-time Rolex World Sailor of the Year, Sir Ben Ainslie, who says: “The sailing world was crying out for the creation of such a concept. SailGP is a major milestone in the evolution of yachting, but it also represents continuity. The combination of state-of-the-art technology and sporting prowess is widening the appeal of sailing.