Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Questions

Since the Isle of Man Steam Packet’s newbuild flagship ferry entered service in August, how many times has its predecessor the ropax Ben-My-Chree been drafted in to carry out its sailing roster.

As 3FM reports, this question is to be asked in the House of Keys today by Jason Moorhouse MHK, as part of a trio of Steam Packet related questions tabled for the Manx Treasury Minister, Dr Alex Allinson.

In recent months there have been numerous occasions where weather related conditions have forced the £78m Manxman from not sailing the Douglas-Heysham route leading the 1998 built Ben-My-Chree to cover the service so to maintain operations.

Further questioning from the Arbory, Castletown and Malew MHK will inquire about the difference in fuel consumption between the 948 passenger Manxman and the 630 capacity Ben-my-Chree.

As both ferries operate the same Isle of Man-England route and running in similar conditions, the question of how long each crossing took will also be asked at the sitting.

Published in Ferry

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.