Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Dun Laoghaire Councillors

#FerryEmergencyMotion – The Dun Laoghaire Gazette writes that there was unanimous agreement on an emergency motion to discuss the withdrawal of Stena Line's ferry services over the Christmas period.

Cllrs John and Maria Bailey (FG) asked the chief executive to suspend standing orders at a Dun Laoghaire local area committee meeting.

Councillors are calling for other ferry operators to be allowed to take over the Dun Laoghaire-Holyhead route over Christmas following the cancellation by Stena Line of all ferry services from Dun Laoghaire to Holyhead over the festive season for "commercial and operational reasons".

Dun Laoghaire Harbour Company (click here for their response) is now in talks with the ferry company about the future of the service for 2015.

Cllr Victor Boyhan (Ind) said: "Councillors united at Dun Laoghaire council meeting, calling for a special meeting with Stena Line management to seek details of their masterplan and commitment to Dun Laoghaire Harbour as a travel destination."

For more on this story, click HERE.

 

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.