Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Cruise Arrivals

Cork Harbour's lucrative cruise season will continue as planned, despite coronavirus fears, writes the Irish Examiner.

The Port of Cork said steps have been taken ahead of the arrival of the first cruise liner of the 2020 season.

The Saga Sapphire is due in Cobh on Friday morning with up to 752 passengers and a further 400 crew. It will arrive at the end of a coastal cruise of Ireland and the UK, having already docked in Liverpool and Dublin (yesterday to overnight in port Afloat adds) before setting off back to Dover.

There is just one other cruise liner due this month: the Marco Polo (also Cobh, Afloat confirms), which is scheduled to arrive on March 23. From April onwards, though, the numbers arriving will increase rapidly.

Currently, there are plans for a record 107 cruise liners to visit Cork (majority to Cobh) in the coming months. Passenger numbers were projected to reach 260,000.

For more on the coronavirus struck cruise ship Grand Princess in the US, as Afloat previously reported and a comment from the Port of Cork click here.

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.