Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: loft

#sailmaker – Veteran pro solo sailor Yannick Lemonnier has opened Quantum sail loft in Galway docks to service both the Southern and Northern Ireland sailing markets.

Lemonnier, a double handed Round Ireland record holder, says he will service and repair any type of sail; cruisers, racers, dinghies, windsurf, kitesurf and even windmill sails.

With an impressive floor area of nearly 450 sq.metres, the Galway harbour loft is capable of handling the largest sails such as for VOR70 or MOD70 racing yachts and operates collection points from Dublin and Cork.

The French sailmaker has an impressive sailing CV, having sailed in excess of 70,000 miles, mostly single handed or double-handed, and competed in five 'Solitaire du Figaro', 2 Transatlantic race double-handed "AG2R", won 2 French National Student match-racing, won French National Student cruiser/ racer title and has competed in many "Tour Voile", "Spi Ouest France", Cowes Week (TP52), Fasnet Races.

The international Quantum Sail Design Group was formed in 1996 by a group of independent and experienced sailmakers. The firm has grown to more than 60 sales and service outlets throughout the world with headquarters in Traverse City, Michigan, USA. Sails are built at three, state-of-the-art manufacturing centers strategically located around the globe.

More on the new Galway loft here

Published in Marine Trade

Shannon Foynes Port Information

Shannon Foynes Port (SFPC) are investing in an unprecedented expansion at its general cargo terminal, Foynes, adding over two-thirds the size of its existing area. In the latest phase of a €64 million investment programme, SFPC is investing over €20 million in enabling works alone to convert 83 acres on the east side of the existing port into a landbank for marine-related industry, port-centric logistics and associated infrastructure. The project, which will be developed on a phased basis over the next five years, will require the biggest infrastructure works programme ever undertaken at the port, with the entire 83 acre landbank having to be raised by 4.4 metres. The programme will also require the provision of new internal roads and multiple bridge access as well as roundabout access.