Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Winter Mooring

Waterways Ireland advises masters of vessels that the winter mooring period will end this Easter Sunday, 31 March, on the Shannon Navigation and Shannon-Erne Waterway.

Shannon Navigation Bye-law No. 17(3) will apply from 31 March, such that vessels should not berth in the same harbour for longer than the statutory period of five consecutive days nor more than a total of seven days in any one month.

Services were reconnected to Waterways Ireland harbours and jetties from Friday 15 March, the cross-border body for Ireland’s inland waterways adds.

Published in Inland Waterways

Waterways Ireland advises masters that the winter mooring period for public harbours on the Shannon Navigation and Shannon-Erne Waterway will commence on Wednesday 1 November and will end on 31 March next year.

Masters wishing to avail of winter mooring are required to pay the winter mooring fee of €63.50 prior to 1 November. Online registration must be made on the Waterways Ireland website.

The steps in the winter mooring process are as follows:

  1. Apply online for winter mooring at a specific harbour.
  2. Receive email approval/rejection/alternative location of application.
  3. Follow link on approval email when received to pay winter mooring fee online.

Masters are reminded that Bye-Law 17, the ‘five consecutive days/seven days in one month’ rule, continues to apply for masters not availing of winter mooring.

Waterways Ireland will be disconnecting its electricity supply points and water supply at public moorings for the winter period (November–March). Both services will be reinstated prior to the commencement of the 2024 boating season.

Owners should note that vessels are moored in public harbours at the owners risk at all times and may be directed to other harbours as operational exigencies require.

In other news, the cross-border body for Ireland’s inland waterways advises that two green conical aids to navigation — No 1248 upstream of Parteen Weir and No 500 upstream of Lanesboro Bridge — are currently off station. Mariners are requested to exercise care when navigating in these area.

Meanwhile, in Dromod Harbour in Co Leitrim the pump-out station is now fully operational.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on the Shannon Navigation and Shannon-Erne Waterway that the 2022-23 winter mooring period for public harbours on these navigations has ended as of Friday 31 March.

The cross-border body for Ireland’s inland waterways adds that Shannon Navigation Bye-law No. 17(3) now applies: vessels should not berth in the same harbour for longer than the statutory period of five consecutive days nor more than a total of seven days in any one month.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on the Shannon Navigation and Shannon-Erne Waterway that the winter mooring period for public harbours on these navigations will commence on Tuesday 1 November.

Masters wishing to avail of winter mooring — which continues until 31 March 2023 — are required to register online and pay the winter mooring fee of €63.50 prior to 1 November.

Masters must apply for winter mooring at a specific harbour. They will then receive by email their approval, rejection or an alternative location of application. Upon approval, follow the link in the email to pay the required fee online.

Masters are reminded that Bye-law 17 of the Canals Act — the “5 consecutive days/ 7 days in one month rule” — continues to apply for those not availing of winter mooring.

Waterways Ireland says it will be disconnecting its electricity supply points and water supply at public moorings for the winter period. Both services will be reinstated prior to the commencement of the 2023 boating season, the cross-border body for Ireland’s inland waterways adds.

Owners are urged to note that vessels are moored in public harbours at the owners risk at all times and may be directed to other harbours “as operational exigencies require”.

Published in Inland Waterways

Waterways Ireland reminds masters of vessels on the Shannon Navigation and Shannon-Erne Waterway that the winter mooring period for these inland waterways ended last Thursday 31 March.

Shannon Navigation Bye-Law No 17(3) now applies, such that vessels should not berth in the same harbour for longer than the statutory period of five consecutive days nor more than a total of seven days in any one month.

Published in Inland Waterways

Waterways Ireland advises masters of vessels that the winter mooring period for public harbours on the Shannon Navigation and Shannon-Erne Waterway will commence on Monday 1 November and will end on 31 March 2022.

Masters wishing to avail of winter mooring on these inland waterways are required to pay the €63.50 fee prior to 1 November. Online registration must be made on the Waterways Ireland website HERE.

To apply, the following steps are involved:

  1. Apply online for Winter Mooring at a specific harbour.
  2. Receive email approval/rejection/alternative location of application.
  3. Follow link on approval email when received to pay winter mooring fee online.

Masters are reminded that Bye-law 17 — the “five consecutive days/seven days in one month” rule — continues to apply for masters not availing of winter mooring.

Waterways Ireland says it will be disconnecting its electricity supply points and water supply at public moorings for the winter period. Both services will be reinstated prior to the commencement of the 2022 boating season.

Masters are also reminded that vessels are moored in public harbours at the owner’s risk at all times and may be directed to other harbours as required.

Published in Inland Waterways

Waterways Ireland reminds masters on the Shannon Navigation and Shannon-Erne Waterway that the winter mooring period for public harbours will commence this Sunday 1 November and continue until 31 March 2021.

Masters wishing to avail of winter mooring on these inland waterways are required to pay the €63.50 fee online before this Sunday. Registration is available at the Waterways Ireland website HERE.

To register, for winter mooring, go by the following steps:

  1. Apply for mooring at a specific harbour
  2. Receive email approval/rejection/alternative location of application
  3. Follow link on approval email when received to pay winter mooring fee online

Masters are reminded that Bye-law 17 — the ‘five consecutive days/seven days in one month rule’ — will continue to apply for masters not availing of winter mooring when the Covid-19 Level 5 restrictions are eased.

Waterways Ireland will be disconnecting its electricity supply points and water supply at public moorings for the winter period. Both services will be reinstated prior to the 2021 boating season.

Owners are urged to note that vessels berthed in public harbours are at the owners’ risk at all times and may be directed to other harbours as required by Waterways Ireland.

Published in Inland Waterways

Waterways Ireland has suspended the five-day mooring rule until late October in the wake of the country’s move to Level 3 coronavirus restrictions.

As of this past Wednesday 7 October, the rule — which prohibits vessels from mooring in one spot for more than five days — has been suspended across Ireland's inland waterways for a three-week period until Tuesday 27 October, at which point restrictions will be reviewed.

Shortly after this, the winter mooring period commences on Sunday 1 November and owners of vessels can apply for permits at the Waterways Ireland website.

All locks, bridges and facilities on the Shannon Navigation and Shannon-Erne Waterway remain open at the scheduled times with the exception of Portora Lock in Enniskillen, which will be temporary closed to boat traffic from 9am to 5pm next Wednesday 14 October for essential maintenance.

Masters of vessels and waterways users in the Republic are also reminded that in accordance with Level 3 restrictions, non-essential travel outside your home county is not allowed at present.

Published in Inland Waterways

Waterways Ireland is advising masters that the winter mooring period for public harbours on the above navigation will commence on 1st Nov 2017 and end on the 31st Mar 2018.

Masters are advised that the associated charges, €63.50, must be paid prior to 1st Nov 2017.

Masters are further reminded that Bye-law 17. Mooring and use of Harbours i.e. the "5 Day Rule" continues to apply during this period and that masters not wishing to avail of winter mooring should continue to observe the mooring time limits for public harbours.

Payment may be made by cheque, bank draft or postal order, made payable to Waterways Ireland, Scarriff Harbour, Ballyminoge, Scarrif, Co. Clare, Ireland. Credit/Debit card payments may be made by contacting Finance Section, Waterways Ireland, Enniskillen, Tel: 048 6632 3004 (from RoI)

Masters should also note that fresh water and electricity supply may not be available during this period at public moorings therefore any on-board services which may be depending on this electrical supply should have an alternative source of power.

Published in Inland Waterways

#WinterBerths - The winter mooring period for 2015-16 is coming up fast, and Ireland's boat owners will undoubtedly be looking for the best deals available.

Last week we put out a call for details on winter packages available from Ireland's marinas and harbours, and those in the Dublin area can benefit from the most options.

As previously reported, Howth Yacht Club got a head start on the competition with their comprehensive winter package, which includes access to the club's full range of facilities and marine services. A few kilometres north, Malahide Marina also offers special rates for winter berthage.

On the south side of Dublin Bay, winter boat storage is always at a premium. But Dun Laoghaire Marina presently has two deals on offer, with winter berthing on the marina for €135/m, as well as a combined package with MGM Boatyard for discounted marina berthing plus lift-out and anti-foul (call 01 202 0040 for details).

The 5 Gold Anchor marina also hosts a full calendar of winter racing with the Dublin Bay Sailing Club for those who may not want to hang up their sailing gear just yet.

It also emphasises that its staff check the marina's moored boats daily to avoid such catastrophes as the grounded yacht off Hook Head last week, which is thought to have slipped free of its moorings.

At the Royal St George, winter lift-out comes early – on Saturday 10 October, just over a week from now – with winter parking allocated on a first come, first served basis. In addition, the club reminds that the usual members rate is not available this season. More details can be found HERE.

Nearby, Western Marine at Dalkey's Bullock Harbour has had a number of upgrades for its latest winter storage season, with its crane once again fully operational (€50 per standard lift-out of 3.5 tonnes and under).

Mains power is available, with no additional cost for use of light power tools, and water can be sourced from a public tap outside the entrance. More details of their services and rates, including special offer discounts, are available HERE.

Further down the coast, Greystones Harbour Marina is providing winter berthing from October to March for €185 per metres. And in the city centre, Poolbeg Marina in Ringsend sees its winter berthing season begin this Thursday 1 October, with rates from €100 per metre.

It's a similar story around the country, with the venerable Royal Cork, for example, offering a rate €25 per foot for winter storage from 1 November.

On the Shannon Navigation and Shannon-Erne Waterway, the winter mooring period for public harbours begins on 1 November, running till 31 March 2016.

Masters are requested to pay the winter mooring fee of €63.50 before 1 November, and are reminded that the 'five-day rule' still applies for those not wishing to avail of winter mooring.

Those looking for some more security for their vessels will want to go private. Butlers Marina in Carrick-on-Shannon offers indoor winter berthage in its secured marina, while Manor Marine on Lough Erne offers both hard stand storage and winter berthing.

And it's not just boats that need berthing or storage or winterising over the coming months.

Rather than leave your lifejackets on board to risk getting damp and attracting mildew while you're not using them, why not have them stored safety by professionals?

Boaters in the UK at least can benefit from SeaSafe's offer of winter lifejacket servicing from over 50 centres around Britain. Servicing starts at £9.95 and SeaSafe will store your PFD till you need it when the 2016 season arrives - or any time in between.

If there are any Irish operations that offer a similar service, we'd love to hear from you.

And if you're a harbour or marina operator with winter berths to offer this season, please leave your details with us (below in comments) or email to [email protected] so they can be added here.

Published in Irish Marinas

Dun Laoghaire Harbour Information

Dun Laoghaire Harbour is the second port for Dublin and is located on the south shore of Dublin Bay. Marine uses for this 200-year-old man-made harbour have changed over its lifetime. Originally built as a port of refuge for sailing ships entering the narrow channel at Dublin Port, the harbour has had a continuous ferry link with Wales, and this was the principal activity of the harbour until the service stopped in 2015. In all this time, however, one thing has remained constant, and that is the popularity of sailing and boating from the port, making it Ireland's marine leisure capital with a harbour fleet of between 1,200 -1,600 pleasure craft based at the country's largest marina (800 berths) and its four waterfront yacht clubs.

Dun Laoghaire Harbour Bye-Laws

Download the bye-laws on this link here

FAQs

A live stream Dublin Bay webcam showing Dun Laoghaire Harbour entrance and East Pier is here

Dun Laoghaire is a Dublin suburb situated on the south side of Dublin Bay, approximately, 15km from Dublin city centre.

The east and west piers of the harbour are each of 1 kilometre (0.62 miles) long.

The harbour entrance is 232 metres (761 ft) across from East to West Pier.

  • Public Boatyard
  • Public slipway
  • Public Marina

23 clubs, 14 activity providers and eight state-related organisations operate from Dun Laoghaire Harbour that facilitates a full range of sports - Sailing, Rowing, Diving, Windsurfing, Angling, Canoeing, Swimming, Triathlon, Powerboating, Kayaking and Paddleboarding. Participants include members of the public, club members, tourists, disabled, disadvantaged, event competitors, schools, youth groups and college students.

  • Commissioners of Irish Lights
  • Dun Laoghaire Marina
  • MGM Boats & Boatyard
  • Coastguard
  • Naval Service Reserve
  • Royal National Lifeboat Institution
  • Marine Activity Centre
  • Rowing clubs
  • Yachting and Sailing Clubs
  • Sailing Schools
  • Irish Olympic Sailing Team
  • Chandlery & Boat Supply Stores

The east and west granite-built piers of Dun Laoghaire harbour are each of one kilometre (0.62 mi) long and enclose an area of 250 acres (1.0 km2) with the harbour entrance being 232 metres (761 ft) in width.

In 2018, the ownership of the great granite was transferred in its entirety to Dun Laoghaire Rathdown County Council who now operate and manage the harbour. Prior to that, the harbour was operated by The Dun Laoghaire Harbour Company, a state company, dissolved in 2018 under the Ports Act.

  • 1817 - Construction of the East Pier to a design by John Rennie began in 1817 with Earl Whitworth Lord Lieutenant of Ireland laying the first stone.
  • 1820 - Rennie had concerns a single pier would be subject to silting, and by 1820 gained support for the construction of the West pier to begin shortly afterwards. When King George IV left Ireland from the harbour in 1820, Dunleary was renamed Kingstown, a name that was to remain in use for nearly 100 years. The harbour was named the Royal Harbour of George the Fourth which seems not to have remained for so long.
  • 1824 - saw over 3,000 boats shelter in the partially completed harbour, but it also saw the beginning of operations off the North Wall which alleviated many of the issues ships were having accessing Dublin Port.
  • 1826 - Kingstown harbour gained the important mail packet service which at the time was under the stewardship of the Admiralty with a wharf completed on the East Pier in the following year. The service was transferred from Howth whose harbour had suffered from silting and the need for frequent dredging.
  • 1831 - Royal Irish Yacht Club founded
  • 1837 - saw the creation of Victoria Wharf, since renamed St. Michael's Wharf with the D&KR extended and a new terminus created convenient to the wharf.[8] The extended line had cut a chord across the old harbour with the landward pool so created later filled in.
  • 1838 - Royal St George Yacht Club founded
  • 1842 - By this time the largest man-made harbour in Western Europe had been completed with the construction of the East Pier lighthouse.
  • 1855 - The harbour was further enhanced by the completion of Traders Wharf in 1855 and Carlisle Pier in 1856. The mid-1850s also saw the completion of the West Pier lighthouse. The railway was connected to Bray in 1856
  • 1871 - National Yacht Club founded
  • 1884 - Dublin Bay Sailing Club founded
  • 1918 - The Mailboat, “The RMS Leinster” sailed out of Dún Laoghaire with 685 people on board. 22 were post office workers sorting the mail; 70 were crew and the vast majority of the passengers were soldiers returning to the battlefields of World War I. The ship was torpedoed by a German U-boat near the Kish lighthouse killing many of those onboard.
  • 1920 - Kingstown reverted to the name Dún Laoghaire in 1920 and in 1924 the harbour was officially renamed "Dun Laoghaire Harbour"
  • 1944 - a diaphone fog signal was installed at the East Pier
  • 1965 - Dun Laoghaire Motor Yacht Club founded
  • 1968 - The East Pier lighthouse station switched from vapourised paraffin to electricity, and became unmanned. The new candle-power was 226,000
  • 1977- A flying boat landed in Dun Laoghaire Harbour, one of the most unusual visitors
  • 1978 - Irish National Sailing School founded
  • 1934 - saw the Dublin and Kingstown Railway begin operations from their terminus at Westland Row to a terminus at the West Pier which began at the old harbour
  • 2001 - Dun Laoghaire Marina opens with 500 berths
  • 2015 - Ferry services cease bringing to an end a 200-year continuous link with Wales.
  • 2017- Bicentenary celebrations and time capsule laid.
  • 2018 - Dun Laoghaire Harbour Company dissolved, the harbour is transferred into the hands of Dun Laoghaire Rathdown County Council

From East pier to West Pier the waterfront clubs are:

  • National Yacht Club. Read latest NYC news here
  • Royal St. George Yacht Club. Read latest RSTGYC news here
  • Royal Irish Yacht Club. Read latest RIYC news here
  • Dun Laoghaire Motor Yacht Club. Read latest DMYC news here

 

The umbrella organisation that organises weekly racing in summer and winter on Dublin Bay for all the yacht clubs is Dublin Bay Sailing Club. It has no clubhouse of its own but operates through the clubs with two x Committee vessels and a starters hut on the West Pier. Read the latest DBSC news here.

The sailing community is a key stakeholder in Dún Laoghaire. The clubs attract many visitors from home and abroad and attract major international sailing events to the harbour.

 

Dun Laoghaire Regatta

Dun Laoghaire's biennial town regatta was started in 2005 as a joint cooperation by the town's major yacht clubs. It was an immediate success and is now in its eighth edition and has become Ireland's biggest sailing event. The combined club's regatta is held in the first week of July.

  • Attracts 500 boats and more from overseas and around the country
  • Four-day championship involving 2,500 sailors with supporting family and friends
  • Economic study carried out by the Irish Marine Federation estimated the economic value of the 2009 Regatta at €2.5 million

The dates for the 2021 edition of Ireland's biggest sailing event on Dublin Bay is: 8-11 July 2021. More details here

Dun Laoghaire-Dingle Offshore Race

The biennial Dun Laoghaire to Dingle race is a 320-miles race down the East coast of Ireland, across the south coast and into Dingle harbour in County Kerry. The latest news on the Dun Laoghaire to Dingle Race can be found by clicking on the link here. The race is organised by the National Yacht Club.

The 2021 Race will start from the National Yacht Club on Wednesday 9th, June 2021.

Round Ireland Yacht Race

This is a Wicklow Sailing Club race but in 2013 the Garden County Club made an arrangement that sees see entries berthed at the RIYC in Dun Laoghaire Harbour for scrutineering prior to the biennial 704–mile race start off Wicklow harbour. Larger boats have been unable to berth in the confines of Wicklow harbour, a factor WSC believes has restricted the growth of the Round Ireland fleet. 'It means we can now encourage larger boats that have shown an interest in competing but we have been unable to cater for in Wicklow' harbour, WSC Commodore Peter Shearer told Afloat.ie here. The race also holds a pre-ace launch party at the Royal Irish Yacht Club.

Laser Masters World Championship 2018

  • 301 boats from 25 nations

Laser Radial World Championship 2016

  • 436 competitors from 48 nations

ISAF Youth Worlds 2012

  • The Youth Olympics of Sailing run on behalf of World Sailing in 2012.
  • Two-week event attracting 61 nations, 255 boats, 450 volunteers.
  • Generated 9,000 bed nights and valued at €9 million to the local economy.

The Harbour Police are authorised by the company to police the harbour and to enforce and implement bye-laws within the harbour, and all regulations made by the company in relation to the harbour.

There are four ship/ferry berths in Dun Laoghaire:

  • No 1 berth (East Pier)
  • No 2 berth (east side of Carlisle Pier)
  • No 3 berth (west side of Carlisle Pier)
  • No 4 berth  (St, Michaels Wharf)

Berthing facilities for smaller craft exist in the town's 800-berth marina and on swinging moorings.

© Afloat 2020