Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: ADCP

TechWorks Marine plans to deploy four trawl-resistant bottom mounted acoustic Doppler current profilers (ADCP) frames in Castlemaine and Valentia off the coast of Co Kerry from this Monday 7 February.

Weather permitting, the Ocean Navigator (callsign EI018) will deploy the four trawl-resistant, bottom-mounted ADCPs frames — each of around one square metre in area — on the seabed for a minimum of one month and a maximum of two months, between this week and Monday 21 February.

They will be used to carry out water quality sampling surveys as well as vessel-mounted ADCP surveys at the same time as the deployments and these are tide and weather dependent and may cause a slight delay in the recovery of the seabed frames.

The ADCPs will be measuring currents through the water column at each location over the course of their month-long deployment. This data will be used to validate a hydrodynamic model being developed of the area for Irish Water.

There will be no surface marker during the extent of deployment so vessel traffic will not need to avoid the area but should be aware of its presence. Throughout operations, the Ocean Navigator will be displaying appropriate lights and shapes.

Details of the exact locations of the ADCP frames and other information for mariners are included in Marine Notice No 08 of 2022, which can be downloaded below.

Published in News Update

The deployment of an Acoustic Doppler Current Profiler (ADCP) sub-surface installation by University College Dublin, which was scheduled to take place between 15 - 21 October 2020 as Afloat previously reported, will now take place on 7 November 2020.

The deployment will occur approximately 0.60 Nautical Miles from Rock Island lighthouse in a direction of 235° (see Appendix 1). The exact location co-ordinates are as follows:

Latitude: 53°08' 57.4"N
Longitude: 009°52' 23.4"W

The deployment will be carried out by the 'MV Chateau-Thierry'

Yellow spherical marker buoys, 40 cm in diameter will be used. They will flash yellow every 5 seconds.

An acoustic Doppler current profiler (ADCP) is a hydroacoustic current meter similar to a sonar, used to measure water current velocities over a depth range using the Doppler effect of sound waves scattered back from particles within the water column.

The UCD Highwave Project aims to use statistics and fluid mechanics to explore fundamental questions in wave breaking.

Published in Marine Warning
Tagged under

University College Dublin have been set to deploy an Acoustic Doppler Current Profiler (ADCP) off Inis Mór in the Aran Islands between today, Thursday 15 October, and next Wednesday 21 October as part of the Highwave project.

The university previously deployed an ADCP in February as par of the same ocean wave data modelling project.

Thos latest deployment, from the MV Chateau-Thierry (callsign EIHK6), will be some 0.6 nautical miles from Rock Island lighthouse — at 53°08’57.4” N, 009°52’23.4” W. The vessel will display appropriate lights and signals.

Map showing the area of the ADCP deployment off Inis Mór

Navigational warnings will be issued by radio when the deployment of the marker buoys takes place. These buoys will be yellow spherical markers, 40cm in diameter and flashing yellow every five seconds.

Published in Coastal Notes

The Department of Transport, Tourism and Sport advises that University College Dublin intends to deploy an Acoustic Doppler Current Profiler (ADCP) sub-surface installation off the Aran Islands this Friday 28 February, weather permitting.

The deployment will occur around 0.6 nautical miles from Eeragh Lighthouse on Rock Island, off Inishmore, in a direction of 235°. The exact location co-ordinates are 53° 08' 34.437" N, 9° 52' 14.040" W.

The one-day deployment will be carried out by the MV Madelen (Callsign: EI4990). The vessel will display appropriate lights and signals.

Navigational warnings will be issued by radio when the marker buoy deployment takes place. Yellow, spherical marker buoys, 40cm in diameter, will be used. They will flash amber every five seconds.

For more information on this deployment visit www.highwave-project.eu

Published in Coastal Notes

Marine Notice No 25 of 2019 from the Department of Transport, Tourism and Sport advises that there will be a deployment of ADCP current meters on the sea floor in Castletownbere, Co Cork from tomorrow, Thursday 25 July.

Current meters will be mounted in a stainless-steel frame at two locations: Lat 51°38'33.06”N, Long 009°54'42.00"W and Lat 51°38'33.00”N, Long 009°53'43.68”W.

The stainless-steel frame will be deployed from vessel An tOileanach (Callsign EI5930) for 14 days from tomorrow, subject to weather.

Surface spar-style buoys will be used to mark locations. Buoys will be a 700mm diameter yellow buoy of height approximately 1m above the water line.

The buoys will be fitted with a flashing LED light with a range of 2-3 nautical miles. The light will be set to flash 3 times every 10 seconds (duration of flash 0.3 seconds).

Published in Irish Harbours

TechWorks Marine Ltd is deploying trawl-resistant bottom mounted Acoustic Doppler Current Profiler (ADCP) frames in Waterford Harbour this week.

It is anticipated that the ADCPs will be deployed between today, Monday 8 July, and this Friday 12 July, depending on the weather. If the deployment is delayed due to the weather, it will be carried out on the next viable tide and weather window. Update: the ADCPs will now be deployed on or after Thursday 18 July.

The frames will be deployed from the vessel James (callsign EITT2). The frames will be on the seafloor for a minimum period of one calendar month and a maximum period of two months (weather permitting).

The ADCPs will be measuring currents through the water column at each location over the deployment. This data will be used to validate a hydrodynamic model of the area being developed for Irish Water.

Each frame will have one ADCP sensor, an acoustic pinger, an acoustic release and a rigid recovery buoy.

The frames are approximately 1m2 and will remain on the seafloor for a period of up to 30 days, after which the frame will be retrieved using the acoustic release and recovery buoy.

There will be no surface marker during the extent of deployment so vessel traffic will not need to avoid the area but should be aware of its presence.

Details of the relevant co-ordinates are included in Marine Notice No 22 of 2019, a PDF of which is available to read or download HERE.

Meanwhile, planned cable survey works on the EirGrid East West Interconnector are being carried out by the vessel Deep Helder (callsign PBYU) until this Thursday 11 July. During this survey, the vessel will be deploying underwater survey equipment along a thin 50m corridor.

Fishermen are advised not to leave any static fishing equipment in the vicinity of the survey route (250 metres) and keep a safe distance of at least one nautical mile from the survey vessels that will be operating with towed equipment and will have restricted manoeuvrability.

In addition, the survey vessel Ping will carry out operations in the near-shore waters off Rush, Co Dublin from next Monday 15 July. Near-shore survey operations will take place between beach HW mark and the 10m water depth contour.

Details of co-ordinates and survey contacts are included in Marine Notice No 21 of 2019, a PDF of which is available to read or download HERE.

Published in Marine Warning

The Department of Transport, Tourism and Sport (DTTAS) advises that TechWorks Marine has deployed four trawl-resistant, bottom-mounted Acoustic Doppler Current Profilers (ADCPs) frames throughout Lough Swilly.

The frames deployed on Wednesday 20 February will be on the seafloor for a minimum period of one calendar month and a maximum period of two months (weather permitting).

Water sampling surveys are required to be carried out at the same time as the deployments and these are tide and weather dependent, and may cause a slight delay in recovery, hence the two-month deployment period.

The ADCPs will be measuring currents through the water column at each location over the month-long deployment. This data will be used to validate a hydrodynamic model of the area being developed for Irish Water.

The deployment locations as noted in Marine Notice No 5 of 2019 are (degrees, minutes, seconds) WGS84 as follows:

  • ADCP 1: 55° 12' 59.5" N, 7° 34' 37.2" W
  • ADCP 2: 55° 06' 51.9" N, 7° 29' 02.7" W
  • ADCP 3: 55° 03' 52.4" N, 7° 32' 11.3" W
  • ADCP 4: 55° 01' 17.5" N, 7° 32' 55.4" W

Each frame will have an ADCP sensor (for waves and currents), acoustic release, rigid recovery buoy, acoustic pinger and grapple line. The frames are approximately 1m2 and will remain on the seafloor for a period of up to 30 days, after which the frame will be retrieved by the acoustic release by the retrieval team of a pop-up buoy allowing for its recovery or by a grapple line recovery method.

During the extent of the deployment, ADCP frames 1, 2 and 3 will have a surface marker. The ADCP 1 and 2 will have a red in colour surface buoy and ADCP 3 will have a yellow in colour surface buoy. There will be no surface marker for ADCP 4 so vessel traffic will not need to avoid its location but should be aware of its presence.

Published in Marine Warning

Marine Notice No 12 of 2018 advises that the Marine Institute was scheduled to deploy a bottom-mounted acoustic Doppler current profiler (ADCP) on the Aran prawn ground today, Monday 26 March.

The ADCP will be recovered in May and will remain in place for the duration. The purpose of this deployment is to measure water current speed over a depth range using the Doppler effect of sound waves scattered from particles within the water column.

The ADCP was set to be deployed at Latitude 53°46.133 N and Longitude 9°47.4 W by the RV Celtic Voyager (Callsign EIQN) listening on VHF Channel 16.

As this is sensitive scientific equipment, it is requested that fishermen and marine operators engaged in such activities as bottom trawling or laying of static gear avoid the location concerned to avoid damaging the equipment or damaging fishing gear.

Published in Marine Science

#MarineNotice - TechWorks Marine are deploying three trawl-resistant bottom mounted acoustic Doppler current profiler (ADCP) frames at three locations in Donegal Bay from this week.

The frames, which will be on the sea floor between now and June, are being deployed as part of the oceanographic monitoring programme for the Department of Agriculture, Food and the Marine.

Scheduled for deployment earlier this week on Monday 27 March, the frames will be left in the water for a minimum of one month before being retrieved.

The vessel Dulra na Mara (Callsign EIFS6) will be used for both deployment and collection of the frames. The vessel will be listening on VHF Channel 16 throughout the project.

The frames are 2m by 1m and will remain on the seafloor for a period of up to 90 days, after which each frame will be retrieved by the acoustic release of a pop-up buoy allowing for its recovery.

There will be no surface marker during the extent of deployment so vessel traffic will not need to avoid the area but should be aware of its presence.

A map and co-ordinates of the frame placement points are included in Marine Notice No 14 of 2017, a PDF of which is available to read or download HERE.

Published in Marine Science

#MarineNotice - The latest Marine Notice from the Department of Transport, Tourism and Sport (DTTAS) advises that marine scientists from the Dublin Institute of Advanced Studies (DIAS) are deploying a tsunameter close to the new location of the M4 weather buoy off the Donegal coast.

In addition to the tsunameter, they will also deploy a sub-surface buoy with an acoustic Doppler current profiler (ADCP) mounted on it, as well as pressure sensors clamped to a moored string to measure pressure variations at depth. This system will be deployed in proximity to the tsunameter location but not too close to avoid tangling.

The tsunameter and system used for the ADCP and the pressure string sensors is scheduled to be be deployed imminently from the RV Celtic Voyager (Callsign: EIQN) at latitude 54°59.892 N, longitude 009°58.14 W, at a depth of 119m adjacent to M4 weather buoy.

As this is sensitive scientific equipment, it is requested that fisherman and marine operators engaged in such activities as bottom trawling or laying of static gear avoid the locations concerned to avoid damaging the equipment or damaging fishing gear.

Published in Marine Warning

Dun Laoghaire Harbour Information

Dun Laoghaire Harbour is the second port for Dublin and is located on the south shore of Dublin Bay. Marine uses for this 200-year-old man-made harbour have changed over its lifetime. Originally built as a port of refuge for sailing ships entering the narrow channel at Dublin Port, the harbour has had a continuous ferry link with Wales, and this was the principal activity of the harbour until the service stopped in 2015. In all this time, however, one thing has remained constant, and that is the popularity of sailing and boating from the port, making it Ireland's marine leisure capital with a harbour fleet of between 1,200 -1,600 pleasure craft based at the country's largest marina (800 berths) and its four waterfront yacht clubs.

Dun Laoghaire Harbour Bye-Laws

Download the bye-laws on this link here

FAQs

A live stream Dublin Bay webcam showing Dun Laoghaire Harbour entrance and East Pier is here

Dun Laoghaire is a Dublin suburb situated on the south side of Dublin Bay, approximately, 15km from Dublin city centre.

The east and west piers of the harbour are each of 1 kilometre (0.62 miles) long.

The harbour entrance is 232 metres (761 ft) across from East to West Pier.

  • Public Boatyard
  • Public slipway
  • Public Marina

23 clubs, 14 activity providers and eight state-related organisations operate from Dun Laoghaire Harbour that facilitates a full range of sports - Sailing, Rowing, Diving, Windsurfing, Angling, Canoeing, Swimming, Triathlon, Powerboating, Kayaking and Paddleboarding. Participants include members of the public, club members, tourists, disabled, disadvantaged, event competitors, schools, youth groups and college students.

  • Commissioners of Irish Lights
  • Dun Laoghaire Marina
  • MGM Boats & Boatyard
  • Coastguard
  • Naval Service Reserve
  • Royal National Lifeboat Institution
  • Marine Activity Centre
  • Rowing clubs
  • Yachting and Sailing Clubs
  • Sailing Schools
  • Irish Olympic Sailing Team
  • Chandlery & Boat Supply Stores

The east and west granite-built piers of Dun Laoghaire harbour are each of one kilometre (0.62 mi) long and enclose an area of 250 acres (1.0 km2) with the harbour entrance being 232 metres (761 ft) in width.

In 2018, the ownership of the great granite was transferred in its entirety to Dun Laoghaire Rathdown County Council who now operate and manage the harbour. Prior to that, the harbour was operated by The Dun Laoghaire Harbour Company, a state company, dissolved in 2018 under the Ports Act.

  • 1817 - Construction of the East Pier to a design by John Rennie began in 1817 with Earl Whitworth Lord Lieutenant of Ireland laying the first stone.
  • 1820 - Rennie had concerns a single pier would be subject to silting, and by 1820 gained support for the construction of the West pier to begin shortly afterwards. When King George IV left Ireland from the harbour in 1820, Dunleary was renamed Kingstown, a name that was to remain in use for nearly 100 years. The harbour was named the Royal Harbour of George the Fourth which seems not to have remained for so long.
  • 1824 - saw over 3,000 boats shelter in the partially completed harbour, but it also saw the beginning of operations off the North Wall which alleviated many of the issues ships were having accessing Dublin Port.
  • 1826 - Kingstown harbour gained the important mail packet service which at the time was under the stewardship of the Admiralty with a wharf completed on the East Pier in the following year. The service was transferred from Howth whose harbour had suffered from silting and the need for frequent dredging.
  • 1831 - Royal Irish Yacht Club founded
  • 1837 - saw the creation of Victoria Wharf, since renamed St. Michael's Wharf with the D&KR extended and a new terminus created convenient to the wharf.[8] The extended line had cut a chord across the old harbour with the landward pool so created later filled in.
  • 1838 - Royal St George Yacht Club founded
  • 1842 - By this time the largest man-made harbour in Western Europe had been completed with the construction of the East Pier lighthouse.
  • 1855 - The harbour was further enhanced by the completion of Traders Wharf in 1855 and Carlisle Pier in 1856. The mid-1850s also saw the completion of the West Pier lighthouse. The railway was connected to Bray in 1856
  • 1871 - National Yacht Club founded
  • 1884 - Dublin Bay Sailing Club founded
  • 1918 - The Mailboat, “The RMS Leinster” sailed out of Dún Laoghaire with 685 people on board. 22 were post office workers sorting the mail; 70 were crew and the vast majority of the passengers were soldiers returning to the battlefields of World War I. The ship was torpedoed by a German U-boat near the Kish lighthouse killing many of those onboard.
  • 1920 - Kingstown reverted to the name Dún Laoghaire in 1920 and in 1924 the harbour was officially renamed "Dun Laoghaire Harbour"
  • 1944 - a diaphone fog signal was installed at the East Pier
  • 1965 - Dun Laoghaire Motor Yacht Club founded
  • 1968 - The East Pier lighthouse station switched from vapourised paraffin to electricity, and became unmanned. The new candle-power was 226,000
  • 1977- A flying boat landed in Dun Laoghaire Harbour, one of the most unusual visitors
  • 1978 - Irish National Sailing School founded
  • 1934 - saw the Dublin and Kingstown Railway begin operations from their terminus at Westland Row to a terminus at the West Pier which began at the old harbour
  • 2001 - Dun Laoghaire Marina opens with 500 berths
  • 2015 - Ferry services cease bringing to an end a 200-year continuous link with Wales.
  • 2017- Bicentenary celebrations and time capsule laid.
  • 2018 - Dun Laoghaire Harbour Company dissolved, the harbour is transferred into the hands of Dun Laoghaire Rathdown County Council

From East pier to West Pier the waterfront clubs are:

  • National Yacht Club. Read latest NYC news here
  • Royal St. George Yacht Club. Read latest RSTGYC news here
  • Royal Irish Yacht Club. Read latest RIYC news here
  • Dun Laoghaire Motor Yacht Club. Read latest DMYC news here

 

The umbrella organisation that organises weekly racing in summer and winter on Dublin Bay for all the yacht clubs is Dublin Bay Sailing Club. It has no clubhouse of its own but operates through the clubs with two x Committee vessels and a starters hut on the West Pier. Read the latest DBSC news here.

The sailing community is a key stakeholder in Dún Laoghaire. The clubs attract many visitors from home and abroad and attract major international sailing events to the harbour.

 

Dun Laoghaire Regatta

Dun Laoghaire's biennial town regatta was started in 2005 as a joint cooperation by the town's major yacht clubs. It was an immediate success and is now in its eighth edition and has become Ireland's biggest sailing event. The combined club's regatta is held in the first week of July.

  • Attracts 500 boats and more from overseas and around the country
  • Four-day championship involving 2,500 sailors with supporting family and friends
  • Economic study carried out by the Irish Marine Federation estimated the economic value of the 2009 Regatta at €2.5 million

The dates for the 2021 edition of Ireland's biggest sailing event on Dublin Bay is: 8-11 July 2021. More details here

Dun Laoghaire-Dingle Offshore Race

The biennial Dun Laoghaire to Dingle race is a 320-miles race down the East coast of Ireland, across the south coast and into Dingle harbour in County Kerry. The latest news on the Dun Laoghaire to Dingle Race can be found by clicking on the link here. The race is organised by the National Yacht Club.

The 2021 Race will start from the National Yacht Club on Wednesday 9th, June 2021.

Round Ireland Yacht Race

This is a Wicklow Sailing Club race but in 2013 the Garden County Club made an arrangement that sees see entries berthed at the RIYC in Dun Laoghaire Harbour for scrutineering prior to the biennial 704–mile race start off Wicklow harbour. Larger boats have been unable to berth in the confines of Wicklow harbour, a factor WSC believes has restricted the growth of the Round Ireland fleet. 'It means we can now encourage larger boats that have shown an interest in competing but we have been unable to cater for in Wicklow' harbour, WSC Commodore Peter Shearer told Afloat.ie here. The race also holds a pre-ace launch party at the Royal Irish Yacht Club.

Laser Masters World Championship 2018

  • 301 boats from 25 nations

Laser Radial World Championship 2016

  • 436 competitors from 48 nations

ISAF Youth Worlds 2012

  • The Youth Olympics of Sailing run on behalf of World Sailing in 2012.
  • Two-week event attracting 61 nations, 255 boats, 450 volunteers.
  • Generated 9,000 bed nights and valued at €9 million to the local economy.

The Harbour Police are authorised by the company to police the harbour and to enforce and implement bye-laws within the harbour, and all regulations made by the company in relation to the harbour.

There are four ship/ferry berths in Dun Laoghaire:

  • No 1 berth (East Pier)
  • No 2 berth (east side of Carlisle Pier)
  • No 3 berth (west side of Carlisle Pier)
  • No 4 berth  (St, Michaels Wharf)

Berthing facilities for smaller craft exist in the town's 800-berth marina and on swinging moorings.

© Afloat 2020