Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Ocean Bank

#TOWAGE – The tug Ocean Bank that righted the capsized US entrant Rambler 100 following the Rolex Fastnet Race 2011, arrived in Dublin Bay recently with a barge under tow, writes Jehan Ashmore.

The Rambler 100 had overturned in force-five winds off Fastnet Rock arising from "dramatic and catastrophic" failure of the keel triggered events that ultimately delayed the rescue of the majority of her 21-strong crew, according to the official report by the MCIB into the capsize.

After the rescue of Rambler 100's crew, the yacht remained adrift but eventually was recovered by the Bere Island based tug Ocean Bank to the shelter of Barley Cove, west Cork. From there the 30 tonne bollard pull tractor tug operated by Atlantic Towage & Marine successfully up-righted the yacht.

This week's operation by the Ocean Bank involved towing a completely different type of vessel, the construction barge Skerchi from the south-west coast to a berth alongside Ocean Pier in Dublin Port.

Published in Ports & Shipping

Dun Laoghaire Baths Renovation

Afloat has been reporting on the new plans for the publically owned Dun Laoghaire Baths site located at the back of the East Pier since 2011 when plans for its development first went on display by Dun Laoghaire Rathdown County Council. 

Foreshore consent was applied for in 2013.

Last used 30 years ago as the 'Rainbow Rapids' before falling into dereliction – the new site does not include a public pool.

The refurbished Dun Laoghaire Baths include the existing Baths Pavilion for use as artist workspaces, a gallery café and for the provision of public toilet facilities. 

Work finally got underway at Dún Laoghaire on the €9 million redevelopments of the old Dún Laoghaire Baths site in June 2018 under a contract with SIAC-Mantovani.

The works have removed dilapidated structures to the rear of the Pavilion to permit the creation of a new route and landscaping that will connect the walkway at Newtownsmith to both the East Pier and the Peoples Park. 

Original saltwater pools have been filled in and new enhanced facilities for swimming and greater access to the water’s edge by means of a short jetty have also been provided.

The works included the delivery of rock armour to protect the new buildings from storm damage especially during easterly gales. 

It hasn't all been plain sailing during the construction phase with plastic fibres used in construction washing into the sea in November 2018

Work continues on the project in Spring 2020 with the new pier structure clearly visible from the shoreline.

A plinth at the end of the pier will be used to mount a statue of Roger Casement, a former Sandycove resident and Irish nationalist.