Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Gas Interconnector

The Department of Transport has been advised that a geophysical survey, remotely operated vehicle (ROV) diving and an offshore survey of gas pipeline landfalls in Scotland’s Brighouse Bay and Ross Bay, Kirkcudbright and Ireland (Loughshinny and Gormanston) will take place between Tuesday 14 November and the end of December, subject to weather and operational constraints.

Survey works on the Irish Sea gas interconnector will begin in Scottish waters on 14 November before moving into Irish waters on Sunday 19 November.

The survey vessels will conduct a geophysical, ROV and offshore survey of the pipeline landfalls. These shallow water surveys will extend to a depth of approximately 10m below the lowest astronomical tide (LAT) at each location.

The surveys will be conducted by the vessels AMS Panther (callsign 2EHC2) and 4Winds (callsign PCPE) which will work on a 24-hour basis, the former near-shore to some 10m below chart datum and the latter outside that.

During the surveys and ROV diving operations, the vessels will be displaying the relevant day shapes and night lights and will be monitoring VHF Channels 12 and 16.

Due to ROV operations being operated from the vessel, all other passing vessels are requested to leave a wide berth during the operations and operate at minimum speed to reduce vessel wash.

Coordinates and a map of the survey areas as well as contact details can be found in Marine Notice No 75 of 2023, attached below.

Published in News Update

Dun Laoghaire Baths Renovation

Afloat has been reporting on the new plans for the publically owned Dun Laoghaire Baths site located at the back of the East Pier since 2011 when plans for its development first went on display by Dun Laoghaire Rathdown County Council. 

Foreshore consent was applied for in 2013.

Last used 30 years ago as the 'Rainbow Rapids' before falling into dereliction – the new site does not include a public pool.

The refurbished Dun Laoghaire Baths include the existing Baths Pavilion for use as artist workspaces, a gallery café and for the provision of public toilet facilities. 

Work finally got underway at Dún Laoghaire on the €9 million redevelopments of the old Dún Laoghaire Baths site in June 2018 under a contract with SIAC-Mantovani.

The works have removed dilapidated structures to the rear of the Pavilion to permit the creation of a new route and landscaping that will connect the walkway at Newtownsmith to both the East Pier and the Peoples Park. 

Original saltwater pools have been filled in and new enhanced facilities for swimming and greater access to the water’s edge by means of a short jetty have also been provided.

The works included the delivery of rock armour to protect the new buildings from storm damage especially during easterly gales. 

It hasn't all been plain sailing during the construction phase with plastic fibres used in construction washing into the sea in November 2018

Work continues on the project in Spring 2020 with the new pier structure clearly visible from the shoreline.

A plinth at the end of the pier will be used to mount a statue of Roger Casement, a former Sandycove resident and Irish nationalist.