Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Grimaldi Lines

The possibility of building at the Port of Cork, a vast 6,000-space multi-storey storage compound for new cars imports is been explored, after it had to cope with a 60% surge in new cars that led to opening a new 'temporary' facility.

Typically, the port writes the Irish Examiner, receives approximately 5,000 trade cars at its Ringaskiddy (DWT) Deepwater Terminal in lower Cork Harbour in January, is expecting the arrival of more new vehicles estimated to be 8,000. The terminal Afloat adds is opposite of the berth for Brittany Ferries route to France which adjoins the Cork Container Terminal (CCT) which opened in 2022.

Existing infrastructure to store cars is at a facility also in Ringaskiddy which has reached capacity, however this has led to a port company decision to allocate a new storage facility for cars at Paddy’s Point, for the first time.

Paddy’s Point is located to the east of Ringaskiddy village, close to University College Cork’s Beaufort Research Laboratory which neighbours the campus of the National Maritime College of Ireland (NMCI).

According to the port which said today, “This temporary expansion is required to ensure the smooth and efficient handling of this substantial shipment”

At the weekend, the Port of Cork handled almost 3,000 cars, having arrived on two vehicle carrying-vessels from the Italian operator, Grimaldi Group, which Afloat reported of their separate Zeebrugge-Antwerp-Cork ro-ro freight feeder route launched in 2021 avoiding the UK land-bridge.

As for the combined vehicles on board, they ranged of Audi, Cupra, Seat, Skoda and Volkswagen models. Several companies are involved in importing to Cork, including OGMA, Euromed Ireland Logistics Ltd, National Vehicle Distribution, Mainport and the Doyle Shipping Group.

More from newspaper on the expansion of the vehicle trade sector. 

Published in Port of Cork

#GrandeShip - Almost 57,000 tonnes, the impressive Grande Atlantico (as pictured), a vehicle-carrier fresh from dry-docking in the UK, remains anchored in Dublin Bay offshore of the popular Forty Foot bathing place, writes Jehan Ashmore.

Since her arrival last weekend, the multipurpose ro-ro vessel capable of handling 3,515 cars and more than 1,300 containers had been in drydock for a period of one month having undergone maintenance at A&P Falmouth, Cornwall.

Grande Atlantrico measures 214m length X 32m beam X 9.6m draught. She is a  'Grande Class 1' series vessel operated by Italian shipping giant, Grimaldi Lines. The Naples based group, has one of the world's largest fleet of ro-ro, combination ro-ro's carriers in addition to operating ferries in the Mediterranean.

Having anchored less than 2 nautical miles offshore of Sandycove, the appearance of the 1999 built vessel is an unusual sight in Dublin Bay, as normally she and her fleetmates are scheduled to make arrival and departures into Dublin Port during night-time operations.

She is to berth in the port this evening at Alexandra Basin west from where her large stern door will be lowered onto the quayside so to discharge and take on board cargo.

The Gibraltar registered Grande Atlantico operates the 'Grimaldi Central Express Service' which involves calling to Hamburg, Germany and Antwerp Belgium and ports in the following West African countries, Benin, Togo, Nigeria and Ghana.

Following her Dublin departure around midnight, Grande Atlantico is scheduled to reach her final port of call, Tema in Ghana in mid-September.

Grimaldi Lines only began operations to Dublin in 2012, though the shipping company's distinctive yellow hulled ships have been serving Cork Harbour for many years using Ringaskiddy's deepwater berth.

 

Published in Forty Foot Swimming

On Monday 26 July, the Grande Senegal, a brand new vessel that was only launched this year for Italian shipping giant, Grimaldi Lines, docked in Dublin after a 9,600km voyage from Douala, Cameroon, along Africa's mid-western coast.
Onboard was a large-scale consignment of Irish Defence Forces military equipment from Chad, writes Jehan Ashmore.
The charter of the 47,218 gross tonnes marked the final phase in the withdrawel since April of Irish Defence Forces from UN-peacekeeping duties in the troubled land-locked central African state. The Irish-based troops had already flown home in advance of the military hardware.
In total, 3,000 tonnes of equipment was shipped which included 208 TEU (20-foot long containers) 75 trucks, 4x4s, armoured vehicles and an assortment of trailers and fuel bowsers.
The cargo was first moved from Defence Force facilities based at Goz Beida, in eastern Chad, across 900km of desert to the Chadian capital, N'Djamena. From there the equipment was divided with sensitive cargo flown to the port of Douala. The remaining cargo was taken on another 900km road-trip to Ngaoundere, in northern Cameroon. Upon arrival at Ngaoundere, the cargo was transferred by rail for 650km to Douala, finally completing the journey to the African port.
The transportation was undertaken during the impending threat of the rainy season which can pose serious difficulties for all modes of
wheeled transport to the extent that renders progress to be difficult if not impossible. The major logisticical exercise was one of the most
challenging operations experienced by the Defence Forces.
With the equipment loaded at Douala, Grande Senegal set sail on 13 July bound for Dublin. The long-distance passage took a fortnight to arrive at Dublin, where the ConRo (Containers and Roll-On Roll-Off) vessel discharged vehicles through the stern-mounted door ramp.
Once the equipment was disembarked at the quayside, the Gardai and Defence Forces provided joint escorts to the vehicle-conveys, to ensure a speedy exit out of the port, destined for military barracks. Grande Senegal is one of seven Grande 'Angola' class newbuilds built at the Uljanik Shipyard, Pula, Croatia. Each 210 metre-long ConRo vessel can combine a load of 2000 vehicles and 800 TEU, or alternatively a maximum of 1,360 TEU. The Grande Senegal departed Dublin the next day for Amsterdam.

The_new_multi-purpose

The new multi-purpose vessel, Grande  Senegal fitted with stern-vehicle ramp, berthed at Alexandra Basin, Dublin on 26 July. Photo © Jehan Ashmore/ShipSNAPS
Published in Ports & Shipping

About Dublin Port 

Dublin Port is Ireland’s largest and busiest port with approximately 17,000 vessel movements per year. As well as being the country’s largest port, Dublin Port has the highest rate of growth and, in the seven years to 2019, total cargo volumes grew by 36.1%.

The vision of Dublin Port Company is to have the required capacity to service the needs of its customers and the wider economy safely, efficiently and sustainably. Dublin Port will integrate with the City by enhancing the natural and built environments. The Port is being developed in line with Masterplan 2040.

Dublin Port Company is currently investing about €277 million on its Alexandra Basin Redevelopment (ABR), which is due to be complete by 2021. The redevelopment will improve the port's capacity for large ships by deepening and lengthening 3km of its 7km of berths. The ABR is part of a €1bn capital programme up to 2028, which will also include initial work on the Dublin Port’s MP2 Project - a major capital development project proposal for works within the existing port lands in the northeastern part of the port.

Dublin Port has also recently secured planning approval for the development of the next phase of its inland port near Dublin Airport. The latest stage of the inland port will include a site with the capacity to store more than 2,000 shipping containers and infrastructures such as an ESB substation, an office building and gantry crane.

Dublin Port Company recently submitted a planning application for a €320 million project that aims to provide significant additional capacity at the facility within the port in order to cope with increases in trade up to 2040. The scheme will see a new roll-on/roll-off jetty built to handle ferries of up to 240 metres in length, as well as the redevelopment of an oil berth into a deep-water container berth.

Dublin Port FAQ

Dublin was little more than a monastic settlement until the Norse invasion in the 8th and 9th centuries when they selected the Liffey Estuary as their point of entry to the country as it provided relatively easy access to the central plains of Ireland. Trading with England and Europe followed which required port facilities, so the development of Dublin Port is inextricably linked to the development of Dublin City, so it is fair to say the origins of the Port go back over one thousand years. As a result, the modern organisation Dublin Port has a long and remarkable history, dating back over 300 years from 1707.

The original Port of Dublin was situated upriver, a few miles from its current location near the modern Civic Offices at Wood Quay and close to Christchurch Cathedral. The Port remained close to that area until the new Custom House opened in the 1790s. In medieval times Dublin shipped cattle hides to Britain and the continent, and the returning ships carried wine, pottery and other goods.

510 acres. The modern Dublin Port is located either side of the River Liffey, out to its mouth. On the north side of the river, the central part (205 hectares or 510 acres) of the Port lies at the end of East Wall and North Wall, from Alexandra Quay.

Dublin Port Company is a State-owned commercial company responsible for operating and developing Dublin Port.

Dublin Port Company is a self-financing, and profitable private limited company wholly-owned by the State, whose business is to manage Dublin Port, Ireland's premier Port. Established as a corporate entity in 1997, Dublin Port Company is responsible for the management, control, operation and development of the Port.

Captain William Bligh (of Mutiny of the Bounty fame) was a visitor to Dublin in 1800, and his visit to the capital had a lasting effect on the Port. Bligh's study of the currents in Dublin Bay provided the basis for the construction of the North Wall. This undertaking led to the growth of Bull Island to its present size.

Yes. Dublin Port is the largest freight and passenger port in Ireland. It handles almost 50% of all trade in the Republic of Ireland.

All cargo handling activities being carried out by private sector companies operating in intensely competitive markets within the Port. Dublin Port Company provides world-class facilities, services, accommodation and lands in the harbour for ships, goods and passengers.

Eamonn O'Reilly is the Dublin Port Chief Executive.

Capt. Michael McKenna is the Dublin Port Harbour Master

In 2019, 1,949,229 people came through the Port.

In 2019, there were 158 cruise liner visits.

In 2019, 9.4 million gross tonnes of exports were handled by Dublin Port.

In 2019, there were 7,898 ship arrivals.

In 2019, there was a gross tonnage of 38.1 million.

In 2019, there were 559,506 tourist vehicles.

There were 98,897 lorries in 2019

Boats can navigate the River Liffey into Dublin by using the navigational guidelines. Find the guidelines on this page here.

VHF channel 12. Commercial vessels using Dublin Port or Dun Laoghaire Port typically have a qualified pilot or certified master with proven local knowledge on board. They "listen out" on VHF channel 12 when in Dublin Port's jurisdiction.

A Dublin Bay webcam showing the south of the Bay at Dun Laoghaire and a distant view of Dublin Port Shipping is here
Dublin Port is creating a distributed museum on its lands in Dublin City.
 A Liffey Tolka Project cycle and pedestrian way is the key to link the elements of this distributed museum together.  The distributed museum starts at the Diving Bell and, over the course of 6.3km, will give Dubliners a real sense of the City, the Port and the Bay.  For visitors, it will be a unique eye-opening stroll and vista through and alongside one of Europe’s busiest ports:  Diving Bell along Sir John Rogerson’s Quay over the Samuel Beckett Bridge, past the Scherzer Bridge and down the North Wall Quay campshire to Berth 18 - 1.2 km.   Liffey Tolka Project - Tree-lined pedestrian and cycle route between the River Liffey and the Tolka Estuary - 1.4 km with a 300-metre spur along Alexandra Road to The Pumphouse (to be completed by Q1 2021) and another 200 metres to The Flour Mill.   Tolka Estuary Greenway - Construction of Phase 1 (1.9 km) starts in December 2020 and will be completed by Spring 2022.  Phase 2 (1.3 km) will be delivered within the following five years.  The Pumphouse is a heritage zone being created as part of the Alexandra Basin Redevelopment Project.  The first phase of 1.6 acres will be completed in early 2021 and will include historical port equipment and buildings and a large open space for exhibitions and performances.  It will be expanded in a subsequent phase to incorporate the Victorian Graving Dock No. 1 which will be excavated and revealed. 
 The largest component of the distributed museum will be The Flour Mill.  This involves the redevelopment of the former Odlums Flour Mill on Alexandra Road based on a masterplan completed by Grafton Architects to provide a mix of port operational uses, a National Maritime Archive, two 300 seat performance venues, working and studio spaces for artists and exhibition spaces.   The Flour Mill will be developed in stages over the remaining twenty years of Masterplan 2040 alongside major port infrastructure projects.

Source: Dublin Port Company ©Afloat 2020.