Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: angling

Volunteers from the Gweebarra Fishing Club have completed work on a footbridge across the river near Doochary, the Donegal Democrat reports.

The new bridge is part of a three-year project to develop accessibility on the riverside for walkers and anglers alike. Inland Waterways.

Club chairman Thomas Monds commented: "There’s been nothing there since the flood swept [the old bridge] away years ago. But with the club getting going and more and more local people getting involved, we thought this was a good chance to do something."

He added: "The footbridge makes both banks of the Gweebarra accessible to both anglers and walkers, without having to retrace yours steps."

According to Monds, the new bridge in tandem with recent enhancements in the local fishery infrastructure have helped to make Gweebarra "one of the most accessible and attractive angling venues in the country".

The Donegal Democrat has more on the story HERE.

Published in Inland Waterways

People don’t generally associate Ribs with fishing, their perception is that the hooks will puncture the tubes.  One man Hamish Currie has disproved this theory, Hamish who runs one of the top charter angling businesses in Ireland has just taken delivery of his new purpose built 10 meter rib.

This new rib replaced his previous 9m rib which Hamish has fished for the past six years. In that time Hamish has customers from all over Europe and has been the top Irish specimen boat for the last five years. Last year Hamish’s rib caught one hundred and thirty nine Irish specimens and the heaviest Irish & British skate at 247lbs.

Having worked his old rib for six years Hamish decided to order a purpose built rib, putting his experience and needs to the team at Red Bay Boats, we came up with what we feel is the ideal charter angling boat.

The first advantage of the rib is that there is no sideways roll as the tubes touch the water at rest this cuts out the sickness that many anglers experience on a rolling hand sided boat. The next advantage is the low horse power required to push the boat.  Hamish boat is fitted with a single 285hp Yamaha diesel stern-drive at 18 knots his fuel burn is 20 litres per hours. This gives him a range of 400 miles and at top speed of 28 knots.  

 


So the design spec of the new boat is as follows – 10 meter overall, with a beam of 3.5m, self draining deck complete with twin stern scuppers extra D-fender and cladding, heavy duty tubes with 3 compartments per side. Island wheel house with seating for ten persons and helmsman Fish hold/storage lockers and stern, sealed engine box all with reinforced lids for added fishing space 1m high side deck and rails large bow storage locker with anchor and rope storage in the very bow.  Hamish carries 1500ft rope and anchors in 400ft of water so with the bow storage he can haul his anchor from deck level!  The wheelhouse features two Seaglaze sliding doors, with a separate toilet on the starboard rear. The off-set forward console houses the Garmin 12’ plotter complete with depth and radar, stern camera, Garmin VHF, 2nd Garmin fish finder and sound system, under console there are storage areas for the various bits of fishing tackle needed to catch large fish, weights, traces etc. In order to get enough walk round space round the wheelhouse Red Bay opted for a D section tube, this enabled us to mould a straight side and deck encasing the tube, the result a full walk around boat with 23.5 meters of fishing space on a 10m boat this is exceptional. Rods are stored above the cabin roof along with the liferaft, boat hook etc. < /br> < /br> < /br> < /br> The Yamaha stern-drive is fitted with twin props for max drive and grip, the leg can be trimmed up for shallow work and ease of launching and recovering. Hamish hauls his rib each day with the aid of a special drive in trailer. Hamish believes his boat to be the best angling boat available, the large fishing space, lack of roll, ease of running, excellent sea keeping range and the fact that the boat can’t sink would indeed all add up to the perfect angling rib.

For more details and photos visit www.redbayboats.com and www.predatorireland.com. If you would like to try Hamish’s boat then send redbay an email.

The boat is coded to mca: Cat 3.

 

redbay1

redbay2

redbay3

Published in RIBs

The Launch of the Waterways Ireland Classic Fishing Festival takes place yesterday Friday 23 April 2010 in advance of the competition which runs from Sunday 25 April to Friday 30 April 2010. This year’s Classic Fishing Festival is the 35th anniversary event, cumulatively hosting over 12,250 anglers. Though it must be said most of them have come year after year, in total they have spent over £17,500,000 in the Lakeland County since 1976.

The 2010 event welcomes competitors at a reception taking place on Sunday 25 April, with the competition begins on Monday 26 April and the Festival closes with a Gala Farewell and Prize Presentation on Friday 30th April.

The Waterways Ireland Classic Fishing Festival is the main event of the Fermanagh match fishing season and attracts up to 250 anglers from Northern Ireland, the Republic of Ireland, Great Britain, Germany, Austria and even further afield.

Over the five days, anglers will compete for prizes worth more than £20,000, with section and daily prizes on offer along with aggregate prizes. The “Classic Competition” takes place on Monday, Wednesday and Friday with the “King of the Erne”, organised by the local Erne Anglers Angling Club, completing the Festival on Tuesday and Thursday.

Among the 250 eager anglers lining up at the Fermanagh Lakeland Forum on Monday morning will be last year’s winner, Andrew Chapman from Ballybay, Co Monaghan. He is to be joined by twelve other previous winners, including Kevin Ashurst, who won the Classic in 1978.

Organised by Fermanagh District Council, with assistance from the Department of Culture, Arts and Leisure, the Festival’s major sponsor for the last seven years has been Waterways Ireland, the navigation authority on the inland waterways of which Lough Erne is one.

Martin Dennany Director of Marketing & Communications Waterways Ireland said’ The Waterways Ireland Classic Fishing Festival is a major joint activity which Waterways Ireland supports in partnership with Fermanagh District Council.

Speaking at the Press Launch for the 2010 Waterways Ireland Classic Fishing Festival, Chairman of Fermanagh District Council, Councillor Robert Irvine stated: “The Classic, now running for thirty five years, is one of our longest established events here in Fermanagh and we are delighted to once again welcome the many anglers who make an annual pilgrimage to our Lakeland County”.

Anglers can apply before the event by contacting Fermanagh District Council, Town Hall, Enniskillen, Co. Fermanagh, BT74 7BA or by calling +44 (0)28 6632 5050.

Published in Angling
The Northwest Charter Skippers Organisation was inaugurated in January 2002, and was formed to enhance and develop Charter Boat Services through the interchange of Information, between our membership and through the promotion of a fleet of fully licensed, Insured, and well equipped Modern Sea Angling Vessels adopting best practice and providing a high quality service in Sea Angling and general tourism charters to the Northwest Coast of Ireland, our Slogan being Service with Safety.
 
When you choose a member of the association you can be assured that the operator is fully licensed and insured and will have the experience and qualifications to provide the Service you require at prices you can afford.
 
The association does not provide a booking service, we provide links to angling sites and information pages submitted by our members. The information listed is produced by the individual members of the organisation and the owners of the relevant web sites. Top class fishing aboard quality charter boats in North West Ireland.

Enjoy the very best in Sea Angling Charters.

North West Charter Skippers Association  

Published in Organisations
Page 44 of 44

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020