Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Mojito

Volvo Cork Week 2024 entries have been steadily climbing with a huge variety of boats and sailors from Ireland and all over the world expected to be competing at the Royal Cork’s famous regatta from 15-19 July.

The championship fleet boasts a fine array of race boats, including high performance carbon-fibre flyers to Quarter-Tonners.

Racing in sportsboats at Volvo Cork Week will be the 1720 class for the European Championship, the phenomenal Cape 31 class and, new this year, the RS21 keelboat class with boats available for charter.

For those new to racing, or for cruising boats that don’t want to bring a massive crew, the non-spinnaker/White Sail class offers an ideal programme to enjoy. For a unique experience, the Beaufort Cup provides offshore and inshore racing as an inter-services regatta within Volvo Cork Week.

The championship fleets are always a big feature of Volvo Cork Week, with a several well-known names and boats already entered for 2024. Quarter-Tonners already entered include Anchor Challenge, Panic and Diamond. Half-Tonners already entered include 2 Farr, with reigning ICRA Boat Of The Year Swuzzlebubble planning to enter soon.

Visiting boats such as Raptor, Flyover, Meridian, Allig8r and Valentina will have to get the better of local boats such as Ellida, Magnet and North Star if they are to lift the trophies.

There has been particular interest from the Welsh fleet, some of whom will also compete in the Kingstown to Queenstown race as part of the ISORA series. Entries include Impetuous, Faenol and Mojito — the former El Gran Senor. Several entries from Portishead have been received, including ScrumpyJ, Assassin and Ctrl-J.

The level of interest in non-spinnaker/White Sail classes is high, with many skippers keen to experience racing at Volvo Cork Week for the first time. Visiting boats will include Dreamcatcher, Apache, Hansemer and Calero. They will battle local boats including Sweet Dreams, Indulgence, Loch Greine, Morning After and Rosmarina for the silverware.

The RS21 keelboat class is set to make a splash at Volvo Cork Week 2024The RS21 keelboat class is set to make a splash at Volvo Cork Week 2024

Sportsboats

Notable entries for the 1720 European Championship include local boats Zing, Dark Side and Mini Apple, as well as visitors Mo and After Midnight.

The Cape 31 class previously attended Volvo Cork Week as a relatively new keelboat but is now firmly established as the most exciting one-design class in these waters. Volvo Cork Week is now part of the global Cape 31 2024 events circuit. The strong Irish fleet are expecting international competition from all over the world.

The RS21s will be keen to make a mark, as this is the first time the keelboat class will be part of the event. A unique element of this fleet is the availability of charter boats in ready to race condition for the week. These boats will be supplied by the class and managed at the event by Kenny Rumball of the INSS, making this a very attractive package for those that can’t bring their own boats to Cork. Contact [email protected] for more details.

Beaufort Cup

The Notice of Race for the Beaufort Cup has recently been published on the Volvo Cork Week website. The Beaufort Cup is a unique inter-services regatta, hosted by the Irish Defence Forces in conjunction with the Royal Cork Yacht Club.

A number of veteran teams from the USA have expressed interest in joining the competition, along with uniformed service teams from across Ireland and the UK. Any boat owner interested in chartering a suitable boat to one of the teams is encouraged to make contact by sending an email to [email protected].

Accommodation update

Additional local accommodation has been secured and more details are available on the Volvo Cork Week website. Competitors bringing campervans will be accommodated at the Crosshaven Rugby Club, which is provides appropriate facilities and is located around 1km from the Royal Cork Yacht Club. A regular bus service runs from Carrigaline and Cork City which stops directly outside the Royal Cork Yacht Club.

Social update

Daily entertainment will be provided at the Royal Cork Yacht Club for all competitors after racing, along with various promotional events and sponsor activities. The Ladies Gala Lunch, which will be hosted in aid of the RNLI, is planned for Wednesday 17 July.

For more information including race documents, marina Facilities, accommodation and the superb social programme, visit www.corkweek.ie.

Published in Cork Week
Tagged under

The ISORA Champion, the J109 Mojito (Peter Dunlop and Vicky Cox), won Class One overall of the 23-boat IRC Welsh National Championships on Sunday (May 14).

After seven races sailed at Plas Heli, the Welsh National Sailing Academy and Events Centre, the defending champions counted four race wins to be 11 points clear of Andrew Hall's J125 Jackknife, whose last race victory saw him overtake Wilhelmus Batist's Only Magic for the runner-up slot.

The event incorporated the Celtic Championships, IRC 1 and 2 inshore and cruiser racing.

As regular Afloat readers will recall, Mojito won Saturday's 90-mile cross-channel ISORA race from Dun Laoghaire to Pwllheli on May 6th and now adds the Welsh IRC title to her 2023 early successes.

In the eight-boat Class 2 fleet, Adam Kyffin's Eazitiger won by two points after eight races sailed from Ian McMillan's Checkmate on 11. Third was Chris Seal's Brainstorm.

Class three, sailing on NHS handicap four, sailed Suspicious Minds, skippered by Gavin Nicholas, won the six-boat fleet sailing on NHS handicap.

All results here

Published in Racing
Tagged under

The ISORA Champion, the J109 Mojito (Peter Dunlop and Vicky Cox), leads Class One into the final day of racing at the 23-boat IRC Welsh National Championships on Sunday (May 14).

After three races sailed at Plas Heli, the Welsh National Sailing Academy and Events Centre, the Pwllheli crew are four points clear of Wilhelmus Batist's Only Magic on nine. Third in the nine-boat fleet is Mike Crompton's Xpletive on ten points.

As regular Afloat readers will recall, Mojito won Saturday's 90-mile cross-channel ISORA race from Dun Laoghaire to Pwllheli on May 6th. 

In the eight-boat Class 2 fleet, Adam Kyffin's Eazitiger leads after four sailed from Ian McMillan's Checkmate. Third is Gary Ward's Altima.

Class three, sailing on NHS handicap four, sailed Suspicious Minds, skippered by Gavin Nicholas, leads the six-boat fleet.

Published in Racing
Tagged under

After a successful Irish campaign that included wins in the 260-mile K2Q race from Dun Laoghaire to Cork Harbour and a Cork Week coastal win in July, the top Welsh J109 returned home to dominate the IRC Welsh National Championships.

The championships were again held at Plas Heli, the Welsh National Sailing Academy and Event Centre, with race management by Clwb Hwylio Pwllheli Sailing Club and the Royal Dee Yacht Club. They enjoyed excellent sailing conditions over the three days.

The three-day championship consisted of an IRC class competing for the Welsh National Champion title and a cruiser class racing under the progressive NHC rating system.

The event got underway with a Commodores reception on the deck at Plas Heli on Thursday and a great BBQ party with the Jac Dobson a'r band on Friday evening.

The IRC class enjoyed three days of racing various courses, managed by the RDYC from the Royal Dee committee boat Bacardee, in mainly light north westerly winds.

In form Mojito, fresh from an IRC Coastal class win at Cork Week Regatta, started with a win in race one and continued to win five more races out of the nine races sailed.

Second place was last year's winner Imposter (Richard Fildes), with Darling XX (Stephen Williams) third.

The NHC class enjoyed six races, managed by the PSC race management team from the PSC bridge, around the club's fixed marks and St Tudwals Islands. This class had very close racing with the progressive handicap system working well. Quattro (Avril banks) and Crud y Awel (Pete Driver) tied the class going into the last day, with Quattro (Avril Banks) winning the NHC cruiser class after a fine win in the previous race.

The final day's prizegiving was conducted on the deck at Plas Heli with prizes and trophies presented by PSC Commodore Gerallt Williams and RDYC Commodore Charlie Jones.

Published in J109
Tagged under

The successful Welsh J109 Mojito (Vicky Cox and Peter Dunlop) that was crowned K2Q and Cork Week Coastal Class Champion earlier this month on the south coast returns to the east coast of Ireland for the last offshore fixture of July as the favourite in ISORA's for Saturday's ISORA cross-channel race from Dun Laoghaire to Pwllheli in North Wales.

Up to 11 starters from a pool of 21, including and six from Wales, are expected for Race No. 10 in the Musto ISORA 2022 Series and ISORA's sixth offshore race.

Royal St. George Swan 60, Lee Overlay Partners is expected to make her ISORA debut and the Northern Ireland yacht Excession from Belfast Lough is also slated to compete.

Samatom, the Grand Soleil 44, owned By Bob Rendell from Howth is racing to PwllheliSamatom, the Grand Soleil 44, owned By Bob Rendell from Howth is racing to Pwllheli

From 0800 hours, starting from Dun Laoghaire Harbour the fleet will sail to South Arklow to finish off Pwllheli. 

The course is approximately 120 miles long.

The course is as follows: STARTING LINE at Dun Laoghaire, Muglins Island (S) ISORA Dublin Bay Virtual Mark N53o17.110 W6o00.100 (P), South Arklow Cardinal Buoy N52o40.234’ W 5o58.767’(P) FINISH LINE – at Pwllheli 

Winds are forecast to be westerly at 10 knots with gusts up to 16  at start time.

Entrants for Race No. 10 in the Musto ISORA 2022 SeriesEntrants for Race No. 10 in the Musto ISORA 2022 Series

Published in ISORA
Tagged under
28 sailing boats, the biggest fleet asembled so far is entered for tomorrow's (Saturday) Dun Laoghaire – M2 Buoy – Dun Laoghaire race starting at 10 am. This is the eighth race of the ISORA series and it is organised in conjunction with the Royal Alfred Yacht Club. The start line will be located in Scotsman's Bay. An updated entry list was published last night and is available for download below.
Published in ISORA

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020