Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Belfast Lough News

21st October 2013

Belfast Harbour's Public AGM

#BelfastPortAGM – Belfast Harbour's public AGM is to be held tomorrow (22 October) between 9.45am - 10.45am.

The venue is the Belfast Harbour Office on Corporation Square.

In order to anticipate demand, the organisers would appreciate if interested parties would notify in advance by e-mailing: or contacting Belfast Harbour office reception for details visit this link.

Belfast Harbour has in recent years invested £150m to develop port infrastructure. As previously reported on Afloat.ie, the port has embarked on a Masterplan for a period of over the next 20-30 years.

 

Published in Belfast Lough

HMScaroline – As previouslt reported, the Belfast-based former WWI warship HMS Caroline could create "one of the most significant World War One commemoration projects in the world".

The claim has been made by the grandson of the admiral who commanded the Royal Navy's Grand Fleet in 1916. HMS Caroline has been docked at Alexandra Dock in Belfast since 1923.

Plans to transform it into a floating museum are progressing. The fast light cruiser played a lead role in the 1916 Battle of Jutland in which the Royal Navy forced the German Imperial Navy to retreat to port.

For much more on this development, BCC News Northern Ireland has a report.

 

Published in Belfast Lough

#Harland&Wolff – Harland & Wolff's landmark iconic cranes are to be relocated due to the refit of a massive oil rig which will act as the city's unofficial Christmas tree, bedecked with lights, as it towers over the harbour estate in a repair deal worth tens of millions of pounds.

The mammoth Blackford Dolphin oil drilling rig, originally built in 1974 in Norway, will be upgraded and repaired in the firm's 556m x 93m main building dock, starting in November for approximately 50 days.

The Aker H-3 rig underwent a major upgrade from 2006 to 2008, when Harland & Wolff designed and built accommodation blocks, power generation module, mud room and additional buoyancy.

For more on this story The Belfast Telegraph reports.

 

Published in Belfast Lough

#BelfastPort – In this 400th anniversary year of Belfast Harbour which was established by a Royal Charter, the port in 2013 has embarked on a Port Master Plan for a period over the next 20-30 Years.

The Masterplan sets out Belfast Harbour Company's (BHC) medium to long term development plans for consultation in order to inform stakeholders and assist local and regional planning authorities to prepare and revise their own plans.

BHC plays an essential role in the local economy of Belfast and regional economy of Northern Ireland. The Northern Ireland economy is largely dependent on seaborne trade and BHC handles 60% of this trade and 20% for the island of Ireland.

Belfast Harbour directly and indirectly supports approximately 31% of Northern Ireland's Gross Value Add (GVA) and 27% of employment. The Harbour Estate, extending to almost 2,000 acres, is home to over 650 businesses employing circa 17,000 people.

Forecasts for Belfast Harbour, indicate a potential growth in port tonnage of circa 68% from 17.6 million tonnes in the base year (2012) to 29.3 million tonnes in 2030. This represents a Compound Annual Growth Rate (CAGR) of 2.8%

The capacity analysis and resulting infrastructure and land strategy indicates that, to accommodate the projected tonnage of 29.3 million tonnes, an additional 60 acres of land must be created through reclamation.

The infrastructure and land strategy includes a significant increase in the intensification of use of the current facilities through the redevelopment of existing infrastructure.

For further details of the Belfast Harbour Port Masterplan, click here to download a PDF copy.

 

Published in Belfast Lough

#BelfastCruises – This Autumn Fred Olsen Cruise Lines is 'bringing the world closer' to the people of Belfast, with three exciting cruise itineraries on board the 880-guest Boudicca.

According to Breaking Travel News, guests will have the opportunity, for the first time since 2007, to embark on a Fred. Olsen cruise from Belfast, without having to endure an expensive flight or long ferry crossing to reach its ships.

Boudicca will be offering a 10-night D1322 'Scandinavian Cities Cruise', departing on 23rd September 2013, a 12-night D1323 'Portugal, Madeira & the Canaries' cruise, departing on 3rd October 2013, and a two-night mini-cruise, D1324 'Liverpool Highlights', departing on 15th October 2013.

As previously reported, Braemar, a fleetmate of Boudicca had called to Dublin and Liverpool over the weekend.

 

Published in Belfast Lough

#BelfastHarbour – Belfast Harbour Commissioners which celebrates its 400th anniversary this year, are running a competition to win a private tour of the company's Grade A listed office building which dates to 1854.

The building which was extended in 1895, has a rich and fascinating history and is crammed with original artworks not normally on show to the public.

The competition winner and a guest will be invited on this special tour of the building.

Highlights of the tour are to include a visit to the office's rooftop clock tower, to view the art-collection, tea on the commissioners private terrace (weather permitting) as well as the cellars which harbour some spooky tales!

To enter the competition, simply complete the online form by clicking this LINK.

 

Published in Belfast Lough

#TheWorld – Residensea's 41,000 tonnes ultra-luxury The World, the only private residential community-at-sea based ship berthed in Belfast Harbour this morning, writes Jehan Ashmore.

Residents on board the 644ft ship may travel the globe without ever leaving home, as they own one or more of the 165 private residences. For an example of the accommodation take a peek of a two-bed apartment.

Since her launch in 2002 continuously circumnavigated the world visiting the most exotic locations as well to calling to well-travelled ports.

Belfast Harbour which celebrates its 400th anniversary this year is to welcome a record 60 cruiseship calls, bringing over 100,000 visitors to the city and to tourist hotspots throughout Northern Ireland.

The World berthed in the Pollock Basin of the port, though most larger vessels dock alongside Stormont Wharf. The port is to increase business in this sector with a £7m investment purpose-built cruise terminal which will see such cruiseships moor instead on the south quays of the Lagan and nearby to the Titanic Belfast Visitor Centre and Quarter.

Among the cruise line operators visiting Belfast Harbour in 2013 are Princess Cruises, Holland America Line, Celebrity Cruises, MSC, Thomson, Fred Olsen Cruise Line and Saga Cruises.

The first caller of the season was by another ultra-luxury caller Hebridean Princess which visited in April.

 

Published in Belfast Lough

#BelfastHarbour – In 2012 Belfast Harbour recorded a jump in profits resulting from investment in deep-water facilities and new Stena Line ferries, writes The Irish Independent.

Revenues at the port company, which is celebrating its 400th anniversary, were £39m in 2012, up 7pc from 2011. Operating profit was £18.4m, up 11pc.

The company said trade grew by more than a tenth, primarily due to improved performance in its bulk and roll-on / roll-off business.

2012 was also the first full operating year for Stena Line's new Superfast ferries which the port says has improved the competitiveness of the Belfast – Cairnryan route.

 

Published in Belfast Lough

#BelfastLough – Belfast's Harland and Wolff Group (H&W) continues to operate as an expanding diverse engineering business.

The group has a number of special capabilities related to marine engineering and design, ship repair, and including offshore wind-farm fabrication. The company is a wholly owned subsidiary of the Norwegian Fred Olsen Energy Group.

In 2012, H&W enjoyed a significant increase in turnover and improved its profitability. This followed a loss in 2010 when trading conditions were described as 'externally challenging' and a recovery in 2011. For more on this story The Belfast Telegraph reports.

 

Published in Belfast Lough

#NewCruiseTerminal – The first purpose-built cruise terminal in Ireland is to be built in Belfast Harbour.

The £7m investment  will ensure that Belfast Harbour will be able to handle all cruise ships operating in the Irish Sea, as well as next generation ships which carry over 4,500 passengers and crew, a harbour spokesman said.

According to a report in today's Belfast Telegraph, the new facility will also enable visitors to disembark within walking distance of the city's Titanic visitor attractions - Titanic's Dock & Pumphouse, Titanic Belfast visitor centre and SS Nomadic - by next year.

Roy Adair, Belfast Harbour's chief executive, said: "A decade ago hardly any cruise ships berthed in Belfast. Now, thanks to our Cruise Belfast partnership with Visit Belfast, considerable previous investment in our existing facilities for accommodating cruise ships and tourism attractions such as Titanic Belfast and the new Giant's Causeway Centre, Northern Ireland has a thriving cruise sector.

 

Published in Belfast Lough
Page 7 of 10

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020