Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Shannon Navigation

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that in-river works for the construction of a wastewater treatment plant outfall pipe will take place from Tuesday 7 May to Friday 7 June downstream of Killaloe/Ballina.

Two isolated danger buoys will mark the extremity of the in-river works which will extend from the Ballina side into the river for around 70 metres.

Masters of vessels are requested to proceed at slow speed (5 knots, no wash) with additional caution in the vicinity of the works and to follow the instructions of the safety boat crew.

Elsewhere, boaters on the Shannon-Erne Waterway are advised that the waterfront jetty in Leitrim village is now owned and managed by Waterways Ireland, the cross-border body for Ireland’s inland waterways.

This jetty is located upstream of the slipway on the northern side of the waterway. The Shannon Navigation Bye Laws apply to this jetty as of 17 April 2023.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that the closure of Tarmonbarry Bridge will be extended until at least Monday 27 May.

This further delay is due to additional repair works requiring specialist components being manufactured and delivered from international suppliers.

The cross-border body for Ireland’s inland waterways says the parts required are essential to the safe operation of the bridge.

A diversion route remains available via the Camlin River with additional staff being deployed to Clondra Lock to aid vessel movements along the Camlin.

Waterways Ireland says it regrets any inconvenience that this may cause and thanks its customers for their cooperation in relation to this matter.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that the Gaelforce Great River Swim will take place between Tarmonbarry and Ballyleague next month.

Around 500 swimmers will participate in the swim event in Lanesborough on Saturday 18 May.

The Shannon Navigation between Tarmonbarry lock and Ballyleague bridge will be closed on the day between 9am and 2pm. Tarmonbarry lock and Cloondara Canal lock will also be closed and vessels will be prohibited from proceeding upstream from Ballyleague bridge during thus time.

A series of large bright green and red buoys branded with Gaelforce will be positioned along the swim route on the evening of Friday 17 May and will be removed after the swim on Saturday 18 May, the cross-border body for Ireland’s inland waterways says.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that the lifting bridge at Tarmonbarry in Co Roscommon will now reopen on Friday 3 May.

This extension of the bridge’s closure since February is a result of additional repair works required following a bridge strike.

The cross-border body for Ireland’s inland waterways says it apologises for extending this closure “but the additional work is essential to ensure the bridge is safely operational in advance of the bank holiday weekend”.

A diversion route remains available via the Camlin River.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on the Shannon Navigation that in-river works for the construction of the Killaloe Bypass upper bridge superstructure are progressing as planned and will continue until October 2024.

As previously reported on Afloat.ie, the bridge is being constructed around 1km downstream of the current Killaloe–Ballina bridge.

A buoyed navigational channel continues to be provided for 100 metres either side of the in-river works.

The following plant and equipment will be operating on or overhead the navigation during the upper bridge works:

  • 600t crawler crane set up on the east shore
  • Stabilising crane barge (30m x 23m x 1.88m)
  • 100t crawler crane
  • Tugboat/pusher boat
  • Dumb barge (23m x 9m) and mobile elevated work platforms
  • Safety boat
  • Landing pontoon and gangways

From next Tuesday 2 to Friday 19 April, the final steel girders will be lifted into position in the central spans of the bridge.

This is a heavy lift operation and deemed high-risk work, requiring calm waters for operation of mobile elevated work platforms (MEWP) on barges.

Masters of vessels are requested to proceed at slow speed (5 knots, no wash) with additional caution in the vicinity of the works, and to follow the instructions of the safety boat crew as there are hazards such as bridge piers, steel piles and mooring lines to navigate.

The cross-border body for Ireland’s inland waterways thanks its customers for their cooperation in relation to these works.

Published in Inland Waterways

Waterways Ireland advises masters of vessels that the winter mooring period will end this Easter Sunday, 31 March, on the Shannon Navigation and Shannon-Erne Waterway.

Shannon Navigation Bye-law No. 17(3) will apply from 31 March, such that vessels should not berth in the same harbour for longer than the statutory period of five consecutive days nor more than a total of seven days in any one month.

Services were reconnected to Waterways Ireland harbours and jetties from Friday 15 March, the cross-border body for Ireland’s inland waterways adds.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels on and users of the Shannon Navigation that Battlebridge Lock and the harbour areas immediately upstream and downstream in Battlebridge, Co Leitrim will be closed from this Wednesday 27 to Friday 29 March due to planned diving inspections in the area.

The cross-border body for Ireland’s inland waterways says it regrets any inconvenience that this may cause and thanks its customers for their cooperation.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that all locks and bridges within the North Shannon region will be closed for one day on Thursday 21 March to facilitate mandatory staff training.

The cross-border body for Ireland’s inland waterways apologies for any inconvenience this may cause and thanks its customers for their cooperation in relation to this matter.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels on and users of the Shannon Navigation that the lifting bridge at Tarmonbarry in Co Roscommon will remain closed until at least Thursday 18 April to facilitate essential maintenance works.

Works at Tarmonbarry were previously extended twice since beginning in early February, and a diversion route is available via the Camlin River.

The cross-border body for Ireland’s inland waterways says it regrets any inconvenience that this may cause and thanks its customers for their cooperation.

This story was updated on Wednesday 3 April to include the latest information.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels on and users of the Shannon Navigation that Clarendon Lock in Knockvicar, Co Roscommon will be closed this Wednesday 28 February from 9am to 5pm due to a planned ESB power outage in the area.

Published in Inland Waterways
Page 1 of 19

ESB’s 2040 strategy Driven to Make a Difference: Net Zero by 2040 sets out a clear roadmap for ESB to achieve net zero emissions by 2040. 

ESB will develop and connect renewable energy to decarbonise the electricity system by 2040. ESB will invest in the development of new renewable generation, including onshore and offshore wind and solar, and will significantly increase the amount of renewable generation connected to our electricity networks.

ESB will:

  • Deliver more than a fivefold increase in our renewable generation portfolio to 5,000MW.
  • Reduce carbon intensity of generation fleet from 414 to 140gCO2/kWh by 2030.
  • Decarbonise 63% of our generation output by 2030 and 100% by 2040 (up from c20% now).

Offshore wind

ESB know the importance of offshore wind in tackling climate change and delivering net zero. Ireland has a unique capability given its prime location to take advantage of the potential of offshore wind. ESB are working hard to develop offshore wind projects for the benefit of everyone across society in Ireland and the UK. This includes ongoing engagement with marine users and local communities so ESB can deliver these significant projects.

Offshore wind will play a major role globally in our fight against climate change. It will help to replace energy generated by burning fossil fuels with that from a clean, safe and secure renewable energy source. Ireland’s geographic location on the exposed edge of the Atlantic presents us with a significant opportunity to generate electricity from wind – both offshore and onshore.

Power from onshore wind farms currently provide over one-third of Ireland’s electricity needs. But, whilst its marine area is many times the size of its landmass, Ireland’s offshore wind potential is only starting to be realised. ESB have a coastline stretching over 3,000km but only one operational offshore wind farm – Arklow Bank, with a capacity of 25 MW. In contrast, Belgium’s coastline is only 63km long, but it has already developed more than 2,000 MW of offshore wind. In Great Britain, with a coastline four times the length of ours, offshore wind generation now equates to over 440 Arklow Banks, with an installed capacity of 11,0000 MW as of late 2021.

The Irish Government's target to install 5,000 MW of offshore wind capacity in our maritime area by 2030 is set out in the Climate Action Plan 2021. It also has the objective to source 80% of Ireland’s electricity needs from renewables by the same year. In line with this, ESB is applying its professional and proven engineering expertise to the challenges set within the Climate Action Plan.

ESB are committed to playing a strong role in developing Ireland’s offshore wind potential for the benefit of the people of Ireland. This will be done in consultation with marine users and local communities, and with due care for the marine environment.