Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: PortRail freight

An hourly train service should be operating between major cities and at least one train every two hours between other urban centres, according to a new report that recommends the transformation of the current rail system including port rail freight.

At a launch (yesterday, 25 July), Minister for Transport Eamon Ryan will bring the draft report of the first All-Island Strategic Rail Review (AISRR). The review makes for 30 recommendations that will be brought to the Cabinet.

The AISRR wants to have faster speeds amd improved frequency in addition to new rail routes for people and those for freight. The latter is particularly aimed to be in place across the west and north regions of the country.

Recommendations in the report would take a timeframe beyond 25 years to achieve, however several of the proposals could be implemented beforehand by 2030.

Among the recommended proposals include reducing the level of trucks off the roads with the Limerick to Foynes Port railway reinstated for freight as Afloat previously reported and potentially for passengers returning on the Shannon estuary rail link.

In addition another rail-freight project is to start reopening the south Wexford railway line connecting Waterford and Rosslare Europort, operated by Irish Rail (Iarnród Éireann).

In addition there is a suggestion to develop a rail line around Dublin Port

For more on the AISRR recommendations including Northern Ireland, RTE News reports as well to coverage of matters maritime, as the Minister also highlighted issues facing lighthouse authorities on both sides of the Irish Sea.

General Lighthouse Authorities  

The Minister is seeking Cabinet approval for an international agreement between the General Lighthouse Authorities (GLA) in Ireland and Britain.

Responsibility for the navigation safety around the coasts of Ireland and the UK is overseen by the three lighthouse authorities as Afloat has featured notably of recent years given plans to replace ageing aids to navigation vessels with newbuilds.

The GLA's are the Commissioners of Irish Lights for Ireland and Northern Ireland, the Northern Lighthouse Board for Scotland and the Isle of Man, and Trinity House for England, Wales, the Channel Islands and Gibraltar.

All three GLA's have used joint procurement measures to benefit from the economies of scale and by having closer operational ties. This process was straightforward when all the three lighthouse authorities were under the same EU procurement regime.

However, given post-Brexit this has led to a new solution being required.

The Minister has been advised by the Attorney Gerneral that an international agreement be implemented so to enable the GLA's to achieve solutions.

Among them is the key contract to provide helicopter services needed to service lighthouses in offshore remote locations in particular on Ireland's western seaboard. 

Published in News Update

ESB’s 2040 strategy Driven to Make a Difference: Net Zero by 2040 sets out a clear roadmap for ESB to achieve net zero emissions by 2040. 

ESB will develop and connect renewable energy to decarbonise the electricity system by 2040. ESB will invest in the development of new renewable generation, including onshore and offshore wind and solar, and will significantly increase the amount of renewable generation connected to our electricity networks.

ESB will:

  • Deliver more than a fivefold increase in our renewable generation portfolio to 5,000MW.
  • Reduce carbon intensity of generation fleet from 414 to 140gCO2/kWh by 2030.
  • Decarbonise 63% of our generation output by 2030 and 100% by 2040 (up from c20% now).

Offshore wind

ESB know the importance of offshore wind in tackling climate change and delivering net zero. Ireland has a unique capability given its prime location to take advantage of the potential of offshore wind. ESB are working hard to develop offshore wind projects for the benefit of everyone across society in Ireland and the UK. This includes ongoing engagement with marine users and local communities so ESB can deliver these significant projects.

Offshore wind will play a major role globally in our fight against climate change. It will help to replace energy generated by burning fossil fuels with that from a clean, safe and secure renewable energy source. Ireland’s geographic location on the exposed edge of the Atlantic presents us with a significant opportunity to generate electricity from wind – both offshore and onshore.

Power from onshore wind farms currently provide over one-third of Ireland’s electricity needs. But, whilst its marine area is many times the size of its landmass, Ireland’s offshore wind potential is only starting to be realised. ESB have a coastline stretching over 3,000km but only one operational offshore wind farm – Arklow Bank, with a capacity of 25 MW. In contrast, Belgium’s coastline is only 63km long, but it has already developed more than 2,000 MW of offshore wind. In Great Britain, with a coastline four times the length of ours, offshore wind generation now equates to over 440 Arklow Banks, with an installed capacity of 11,0000 MW as of late 2021.

The Irish Government's target to install 5,000 MW of offshore wind capacity in our maritime area by 2030 is set out in the Climate Action Plan 2021. It also has the objective to source 80% of Ireland’s electricity needs from renewables by the same year. In line with this, ESB is applying its professional and proven engineering expertise to the challenges set within the Climate Action Plan.

ESB are committed to playing a strong role in developing Ireland’s offshore wind potential for the benefit of the people of Ireland. This will be done in consultation with marine users and local communities, and with due care for the marine environment.