Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Lough Rinn

#Rowing: Powerful winds and very choppy water forced the cancellation of the Irish Schools and University Championships at Lough Rinn today.

The early part of the programme went ahead, but after two hours of action, the conditions had deteriorated with no prospect of improvement. Boats were taking on water and some rowers had fallen in.

A decision on the Lough Rinn regatta tomorrow (Sunday) will be made later today. It is likely to go ahead, but may have some alterations to the schedule.

Published in Rowing
#Rowing: Methodist College, Belfast, beat Colaiste Iognaid in a thrilling first final at the Irish Schols’ Regatta at Lough Rinn this morning. The junior 16 boys eight became a battle between the two crews in the final 200 metres, with the Belfast boys finishing well to hold off ‘the Jes’ from Galway. The junior 15 women's eight was won by Coleraine Grammar School, while the women's junior 16 coxed four went to Colaiste Iognaid The windy conditions and choppy water saw the organisers decide to ask the pairs, doubles and singles to hold off on launching, though the programme had started. The University Championships was going ahead, with UCC's women's senior four starting their day with a win, and UCD winning the men's senior four. UCD also took the men's novice eight. Racing was then suspended.
Published in Rowing

#Rowing: The agm of Rowing Ireland was businesslike and brief – coming in under an hour.

 Neville Maxwell, the chair of the high performance committee, praised the “energy and enthusiasm” of high performance director Antonio Maurogiovanni. “He wants a system which is open and transparent,” he said.

 Maxwell said that there was a move away from lightweight rowing and it was essential to build a programme which would last. Finding new sources of income was very important.

 Leo Gibson replaced outgoing treasurer Dan Buckley, who has stepped down. The Old Collegians man spoke of the hope of drawing down Large Scale Sports Infrastructure grants.

 Rowing Ireland president Eamonn Colclough said the priority was to finance work on the National Rowing Centre, with the hope of replacing the slips and, perhaps, the buoyed course. Next in priority would be Lough Rinn and then the proposed new Blessington course.

 Colclough said that he hoped there was a big uptake on the package deal which will give Irish spectators a good way to travel to the World Rowing Championships in Linz in Austria in August/September. “I would love to hear The Fields of Athenry ring out over the waters in Linz,” he said.

 Rowing Ireland is preparing to facilitate clubs using Lough Rinn by taking over the insurance requirements asked for by Leitrim County Council. The Council will “spend hundreds of thousands of euro” on developing the course and surrounds, Colclough told the agm.

 The fixtures calendar for 2020 emerged in a very similar form to the one proposed. Erne Head moved to a week earlier than scheduled and will now take place on March 7th and the Castleconnell Sprint Regatta takes a similar step to May 9th. Carlow’s Dambuster Head is set to take place on  February 1st.

 Galway Regatta (June 6th) and Shandon Masters Regatta (August 15th) were late additions to the draft calendar put before delegates.  

Awards

President’s: Seamus Scully, Carlow

Connacht: Paul Gallen

Leinster: Gerry Conway, Frank Moore, Willie Ryan, Mick Carney, Andrew Coleman

Munster: Brian Sheppard

Ulster: Jeremy Johnston

Published in Rowing

#ROWING: Minister of State Michael Ring yesterday opened the top-class new rowing and canoeing facility at Lough Rinn in Leitrim. The adjustable 2,000 metre course, which can be used for sprint canoeing and rowing, is of top intenational standard. According to Leitrim Tourism the investment so far has been €900,000. The next phase, if it is funded, would bring the associated facilities up to the standard where international events could be held at the course.

Deane Public Works of Enniskillen worked on the course with Polaritas of Hungary, whose systems were used in London 2012 and will be in Rio 2016.

Lough Rinn is very accessible from the North, South and East of Ireland. It has a number of major advantages, including dependable water levels, a 1,000 metre area at one end of the course where crews can warm up and cool down, and a north-south orientation, which should mean the course would rarely be adversely affected by windy conditions.

Published in Rowing

#ROWING: The new Lough Rinn rowing and canoeing facility in County Leitrim will be officially opened tomorrow (Friday). The development is backed by Leitrim Tourism and Leitrim County Council. The opening will be attended by  Michael Ring TD, Minister of State at the Department of Transport, Tourism and Sport with Special Responsibility for Tourism and Sport.

The facility has a 2,000 metre, eight-lane rowing course. It is within easy reach of Dublin, Belfast and Galway and has already attracted the attention of many of the clubs in Ireland, and in particular in Northern Ireland, where there is no facility of this nature.

Published in Rowing
Tagged under

ESB’s 2040 strategy Driven to Make a Difference: Net Zero by 2040 sets out a clear roadmap for ESB to achieve net zero emissions by 2040. 

ESB will develop and connect renewable energy to decarbonise the electricity system by 2040. ESB will invest in the development of new renewable generation, including onshore and offshore wind and solar, and will significantly increase the amount of renewable generation connected to our electricity networks.

ESB will:

  • Deliver more than a fivefold increase in our renewable generation portfolio to 5,000MW.
  • Reduce carbon intensity of generation fleet from 414 to 140gCO2/kWh by 2030.
  • Decarbonise 63% of our generation output by 2030 and 100% by 2040 (up from c20% now).

Offshore wind

ESB know the importance of offshore wind in tackling climate change and delivering net zero. Ireland has a unique capability given its prime location to take advantage of the potential of offshore wind. ESB are working hard to develop offshore wind projects for the benefit of everyone across society in Ireland and the UK. This includes ongoing engagement with marine users and local communities so ESB can deliver these significant projects.

Offshore wind will play a major role globally in our fight against climate change. It will help to replace energy generated by burning fossil fuels with that from a clean, safe and secure renewable energy source. Ireland’s geographic location on the exposed edge of the Atlantic presents us with a significant opportunity to generate electricity from wind – both offshore and onshore.

Power from onshore wind farms currently provide over one-third of Ireland’s electricity needs. But, whilst its marine area is many times the size of its landmass, Ireland’s offshore wind potential is only starting to be realised. ESB have a coastline stretching over 3,000km but only one operational offshore wind farm – Arklow Bank, with a capacity of 25 MW. In contrast, Belgium’s coastline is only 63km long, but it has already developed more than 2,000 MW of offshore wind. In Great Britain, with a coastline four times the length of ours, offshore wind generation now equates to over 440 Arklow Banks, with an installed capacity of 11,0000 MW as of late 2021.

The Irish Government's target to install 5,000 MW of offshore wind capacity in our maritime area by 2030 is set out in the Climate Action Plan 2021. It also has the objective to source 80% of Ireland’s electricity needs from renewables by the same year. In line with this, ESB is applying its professional and proven engineering expertise to the challenges set within the Climate Action Plan.

ESB are committed to playing a strong role in developing Ireland’s offshore wind potential for the benefit of the people of Ireland. This will be done in consultation with marine users and local communities, and with due care for the marine environment.