Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: Port and Shipping News

#Shipping - The world's biggest capacity container ship is currently docked in Felixstowe in its first ever visit to UK waters, as BBC News reports.

The MSC Oscar is somewhat shorter than the CSCL Globe which called at the same port in January, as previously reported on Afloat.ie – though it still has a deck the size of four football pitches.

However, it's in the weightlifting department where the 393m Oscar – launched from the Daewoo shipyard in South Korea last year – has the Globe beat, with capacity for 124 more containers.

The MSC Oscar's visit comes just a week after the largest ship to ever sail up the Thames visited the new DP World London Gateway just west of Canvey Island in Essex.

Published in Ports & Shipping

#Shipping - Stricken cargo ship the Lysblink Seaways was set to be moved to a safe haven yesterday afternoon (25 February) in advance of poor weather.

As previously reported on Afloat.ie, the 120m-long vessel ran around near Ardnamuchan Point in Scotland's West Highlands a week ago while en route from Belfast to Norway.

The ship later refloated in high tide a day after her hull was lifted onto the rocky shore near Kilchoan.

Divers began inspections for damage as the Lysblink Seaways dropped anchor near the grounding spot in Mingary Bay.

But according to Practical Boat Owner, severe weather forecast for the next few days prompted quick action to pump out more than 150 tonnes of fuel from the ship.

She was then scheduled to be towed to a safe anchorage at Scallastle Bay in the Sound of Mull, some 17 miles away.

Practical Boat Owner has more on the story HERE.

Published in Ports & Shipping

#Shipping - A cargo ship en route from Belfast to Norway has run aground near Ardnamurchan Point in Scotland's West Highlands.

And as BBC News reports, the UK coastguard believes it will be stuck there for some time.

The Lysblink Seaways, a 120m-long vessel, found its hull lifted onto the rocky shore after getting into difficulty off Kilchoan in the early hours of yesterday morning (18 Feburary).

There are no reports of injuries among the nine crew on board, and tugs are on the way to try to dislodge the hull from its perch.

BBC News has images of the stricken ship HERE.

Published in Ports & Shipping

#Ports&ShippingReview - Over the last fortnight, Jehan Ashmore has reported on the shipping scene, where Arklow Beacon, the fourth of six Arklow Shipping newbuilds made her maiden call to Dublin Port.

Atlantic Companion, the massive containership bound for Canada that lost engine power in Irish waters that led to repairs in Bantry Bay, instead returned to Liverpool, her last port of call.

On a related note, next month's Merseyside Maritime Awards "overwhelmed" with the number of entries.

Downriver and leading off is the Manchester Ship Canal where the port of Runcorn Docks smashed monthly cargo records and doubled freight over past 12 months.

Another 'Arklow' cargoship, Arklow Viking called to Runcorn last November and last week she docked in a Portugal, for more click 'CargoShipFocus'.

A European Sea Ports Organisation (ESPO) seminar included core topics to include the new TEN-T Guidelines on transport infrastructure to be funded by the EU.

Published in Ports & Shipping

#ESPOjunker - The European Sea Ports Organisation (ESPO) in late January held an internal seminar on infrastructure financing.

The seminar aimed to give ports some practical information on what to expect from European Investment Bank (EIB) lending and financial instruments.

Speakers came from the European Commission, European Investment Bank and the EU's Innovation and Networks Executive Agency (INEA). Presentations focused on the new European Fund for Strategic Investment (EFSI) that is being set up following a recent initiative by European Commission President Jean-Claude Juncker, as well as existing instruments such as classic EIB lending, the Loan Guarantee Instrument for Trans-European Transport Network Projects (LGTT) and project bonds.

Ports were particularly interested in the details of the Juncker Plan. The European Fund for Strategic Investment (EFSI) aims to leverage investments in the magnitude of €315bn by covering part of the risk of projects.

For this purpose, the EU plans to set up a guarantee fund. Of the €8bn that are to be taken out of the EU budget for the new guarantee fund, EUR 2.7bn are to come from the transport envelope of the Connecting Europe Facility (CEF), in particular from the general grant part of the CEF envelope.

This means that the overall sum available for grant funding of transport projects (in non-cohesion countries) is considerably cut by the Juncker plan. The existing envelopes for financial instruments and transport investments in cohesion countries remain untouched.

The TEN-T Guidelines defined a stringent methodology for the eligibility and priorities of transport infrastructure. During the past year, the Commission, member states and infrastructure managers have jointly worked on corridor work plans that are to identify the priority projects with the highest European added value that should thus be the first recipients of EU funding.

In this methodology, ports are seen as the entry and exit points to the European corridors and are thus the strategic starting point for defining the transport needs of Europe. However, under the EFSI, any European transport project independent of location and mode of transport can receive funding. This shifts the logic away from the carefully chosen transport priorities of the CEF and TEN-T

Moreover, the EFSI does not ring-fence money for any particular type of investments. Different sectors ranging from energy, to education and health will be competing for financing. The money transferred from the CEF could thus end up being absorbed by other sectors if these are better able to present mature projects with clear revenue streams.

ESPO Secretary General Isabelle Ryckbost said: "Ports have been given a strategic role in the new TEN-T policy. We are a little concerned about what we have learned today about the new European Fund for Strategic Investment. By shifting a part of the CEF grant money to the new financial instruments we are not only diminishing the possibility for ports of receiving a grant but there also seems to be a possible shift in priorities."

She added "The criteria used by the EIB to assess projects are very different from the priorities set by the new TEN-T policy, which recognises the important role of ports as core nodes of Europe's Transport Infrastructure and entry and exit points to the European corridors."

Published in Ports & Shipping

#Arklow'V'sisters – Runcorn's record freight in 2014 as previously reported on Afloat.ie, referred to a call to the dock port by Arklow Viking to load salt for Spain, it is understood she is currently in neighbouring Portugal, writes Jehan Ashmore.

Arklow Viking is one of a trio of Arklow Shipping 'V' class 4,950 total dwt cargoships managed by Dutch subsidiary, Arklow Shipping N.V.

Her Portuguese port of call is Ribdeo, having taken a passage through the Bay of Biscay that involved rounding Galicia on Spain's north-western coast from a departure in Lisbon.

Also today, Arklow Venture which had berthed along Cork's City south quays had also sailed from an Iberian port, Musel Arnao. This afternoon she departed the Port of Cork for the short-sea coastal passage off the Cork and Kerry peninsula's and is bound for Foynes on the Shannon Estuary.

While earlier this week on Tuesday, Arklow Venus arrived to Dublin Graving Docks Ltd. The 90m long vessel had made the short sea passage in ballast from Avonmouth Docks.

On arrival at the Irish port, she initially moored along the Lead-In East Jetty within Alexandra Basin before entering the dry dock. The marine engineering business carries out repairs, maintenance and overhauls.

It is understood Arklow Venus is to remain in the graving dock until early next month and follows last year's call of Arklow Viking, for her third special survey.

The 200m long dry-dock is the only such facility in the port. The graving dock chamber can cater for two ships simultaneously or one larger vessel.

As previously reported on Afloat.ie, DGD potentially faces closure as the Dublin Port Company plan to redevelop Alexandra Basin by re-using the dry-dock site to provide more quayside cargo space.

On a related note to space and that of cargo volumes, the ASL fleet carry cargoes varying from peat-moss to animal feed and fertiliser. The 'V' class sisters for examples can handle a hold grain-bale capacity of 198762 ft³/5628 m³.

The Dutch flagged trio were all built by Pattje Shipyard B.V., Netherlands, where the yard launched the 'Venus' in 2000, however her sisters both date to 1999.

This pair having been completed before the millennium stand-out, compared to the rest of the 44 cargoships (up to 34,905dwt) to date that were all were built since 2000.

The order for six 'B' class 8,660dwt newbuilds is nearing completion as the fifth in the series, Arklow Brave was launched in mid-December 2014. She was expected to be delivered to her owners this month. 

Published in Arklow Shipping

#RuncornRecord – Manchester Ship Canal port of Runcorn Docks has smashed its monthly cargo record and doubled its freight handled over the past 12 months, writes the Liverppol Echo. 

The developments follow a multi-million pound investment by owner Peel Ports. 

In December, the facility dealt with 50,126 tonnes of cargo – its highest-ever monthly total.

The cumulative weight of the record shipment of cargo is equivalent to more than 31,420 Range Rover Evoques, 122m tins of beans.

In addition to the port handling more than 66.8m boxes of Kellogg's Cornflakes carried on Coastal Deniz as featured in a TV documentary 'Ade to Sea' during a regular shuttle service to Liverpool Docks.

In the same month, Runcorn also handled its biggest ever single shipment of cargo in its history, with the arrival of vessel Kristin C, which discharged 6,212 tonnes of soda ash for its customer Newport Industries.

The ash will be used to manufacture glass. For more on this story, click HERE.

Afloat.ie adds that during the era of the last Guinness stout-tankers, they used to call to Runcorn Docks to discharge the black stuff for the UK market.

The Irish connection continues to the present day in the form of Arklow Shipping, whose distinctive green hull coloured general cargoships call, among them Arklow Viking.

According to Ships Monthly, the 1999 built vessel in November called to Runcorn Salt Works to load 4,000 tonnes of salt for Figueria de Foz in Portugal.

Published in Ports & Shipping

#ShipRepairs – Atlantic Companion, the massive containership that was in Irish waters bound for Canada, having undergone repairs in Bantry Bay last week, is instead returning today to Liverpool, her last port of call, writes Jehan Ashmore.

As previously reported on Afloat.ie, the 57,000 tonnes vessel this day last week, had lost engine power and drifted for almost 12 hours off the Cork coast.

Altantic Companion, a G3 generation class 'con-ro' vessel which can carry containers and vehicles, was en-route from Liverpool to Halifax, however, she developed problems with one of the six cylinders on its main engine, but was able to reach the shelter of Bantry Bay.

Following repair work, it was then expected according to the ships owners, Atlantic Container Line (ACL) that the 1984 built Swedish-flagged containership would last Thursday, resume its trans-Atlantic voyage to Halifax.

Afloat.ie adds that Atlantic Companion had actually departed Bantry Bay the following Sunday but it transpired she set a different course not to Canada but a reverse passage bound for Liverpool. This involved a routine transit by the ACL ship through the Vessel Traffic Separation Scheme (VTSS) of Wexford's south-east coast until she arrived off Anglesey last night and from where she anchored.

Also last night along this same stretch of the north-west Welsh coast, sisters, Atlantic Concert was heading for Liverpool while Atlantic Cartier was in the reverse direction bound for Halifax, Canada.

For more than 40 years, ACL has been a pioneering force and leader in the North Atlantic Trade operating liner services between European ports and the US East coast.

The 2,160 TEU containership, Atlantic Companion and her sisters, may 'not be seen nor heard' off the Irish coast, however, ACL have gained a respected name in ocean transport having started off in the mid-60's with the inaugural G1 vessels then only capable of transporting 700 containers.

Afloat.ie will have more to report and that of ACL's new tonnage replacement programme, in which the first of the next G4 class newbuilds is expected for delivery by the middle of this year.

Published in Ports & Shipping

#Ports&Shipping –The latest IMDO Weekly Market Review includes the following stories as detailed below.

Irish Shipping News: Dublin Port 2014 Record Year - As reported on Afloat.ie, Dublin Port Company published trade statistics for 2014 which show a record year for trade, with Y-O-Y growth of 7.0%. Total throughput for 2014 was 31 million gross tonnes with 7,108 ship arrivals in the year, bringing the port's activity back to the record levels of 2007.

Global Maritime News: Shanghai port busiest container port for 2014 - The Port of Shanghai has taken the crown as the world's busiest container port for the fifth year in a row as the port authority announced a 2014 throughput of 35.29m teu. Last year's box volumes rose by 4.5% compared to 33.77m teu recorded in 2013.

Bunker Price Fall: Owners saving $9,000 per day on bunker fuel - Falling bunker prices are saving shipowners around $9,000 per day, according to international shipowners association BIMCO. On average, a ship consumes around 30 tonnes of bunker fuel a day, so July's high price of $600 per tonne would cost an owner with a vessel on a spot charter around $18,000 per day.

For more on each of the above and other stories click IMDO Weekly Markets Review (Week 3). In addition to dedicated coverage on Afloat.ie's Ports & Shipping News section.

Published in Ports & Shipping

#RFArefits - Cammell Laird, the Merseyside shipyard completed a £49.5m major refit of Royal Fleet Auxiliary's Fort Victoria (A387), one of the largest vessels operated by the UK Ministry of Defence, writes Jehan Ashmore.

The 10 month refit of the 16,967dwt oiler auxiliary replenishment (AOR) vessel that includes carrying stores and ammunition, was the largest single contract for Cammell Laird in 2014 and since the yard began in 2008 its life support 'cluster' contract to maintain nine of the 13 RFA flotilla.

Already refitted at the yard the oil tanker, RFA Gold Rover (A271) which Afloat.ie reported on of her Dublin Port visit last August.

Work on the Harland & Wollf built RFA Fort Victoria was extensive and among the refit's to do list, this involved overhauling the main engines and upgrading of power generation systems that required steelwork and pipework for both fresh and salt water. 

Added to this the 'Fort' class vessel launched in 1990 had the blasting of old and applying of new paint within the hull's ballast and cargo tanks and to the exterior that also included the superstructure.

Following her refit, RFA Fort Victoria made a short hop across the Mersey to Liverpool Docks and remained there for several days prior to sailing to Scottish waters.

The contract with Cammell Laird, also provides capability insertion allowing the ships to be fully integrated with the Royal Navy.

In September, RFA Diligence (A132) returned from much warmer climes for her refit period which is scheduled to be completed early next month.

Every five years the cluster contract is reviewed based on performance and value for money and the Merseyside facility was given an extension of the contract in November 2012 for a further five years to 2018.

As part of the global reach element to the contract, Cammell Laird will also deliver extensive support to the RFA fleet around the world.

Published in Ports & Shipping
Page 7 of 23

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023