Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: Irish Ferries

#Overhauls- Ulysses flagship of Irish Ferries departed today fresh from annual overhaul having dry-docked at Cammel Laird, Birkenhead on Merseyside, writes Jehan Ashmore.

From Birkenhead the 50,000 gross tonnage Ulysses the 1,875 passenger/ 1,342 car capacity giant proceeded in the early hours along the north Wales coast to Holyhead. The repositioning passage is understood to have almost taken seven hours with an arrival at Anglesey just after 08.00hrs.

Currently occupying a dry-dock of the Merseyside facility is that of Dublin-Holyhead fleetmate, high-speed craft HSC Jonathan Swift. The 800 passenger/200 cars fastferry is also undergoing routine maintenance work. Launched in 1999 as an Austal built Auto Express 86m fastcraft ferry in Fremantle Australia, the 5,000 tonnes catamaran is the only such type of vessel operating between Ireland and the UK.

For almost two decades the ‘Dublin Swift’ as she is marketed has been the workhorse of the Irish Sea operating on the 1 hour 49 minute crossing. Each crossing is at 40knots /80kph on the 60 nautical miles / 111 Kms route which totals annually to an impressive 162,000 Kms.

There is another fastcraft, Manannan but this ferry only operates between the Isle of Man and Liverpool and seasonal calls elsewhere to include Dublin Port.

Providing sailing coverage whilst Ulysses was off service and now that of Jonathan Swift fast is that of Isle of Inishmore which in recent weeks was transferred from Rosslare-Pembroke. The cruiseferry having taken the roster of Ulysses. This is set to change as Ulysses resumes on an afternoon crossing bound to Dublin, permitting Isle of Inishmore to also receive attention of annual overhaul.

Taking her place on the Rosslare-Pembroke service since late last year so to cover demands of seasonal capacity on the busy Dublin route, is Oscar Wilde which does not sail at this time of year to France. The cruiseferry however is to resume service with a crossings from the Wexford port to Cherbourg beginning in March.

Returning to the Dublin-Holyhead route which is also operated by ropax Epsilon. As previously reported on Afloat, the chartered Italian flagged ferry made her first sailing of 2017 on the weekend round trip Dublin-Cherbourg connection.

 

Published in Ferry

#FrenchFerry - The first sailing in 2017 of Epsilon on the Ireland-France route of Dublin-Cherbourg operated by Irish Ferries took place yesterday, writes Jehan Ashmore.

Under overcast skies yet flat calm seas, Epsilon departed Dublin Bay in mid-afternoon where the only vessel at anchorage was asphalt/bitumen tanker Iver Ability. The 106m ship is at the centre of cargo ‘issues’ following an investigation of a fire due to a reaction on board during tranport of bitumen into Dublin Port last summer and has since remained at anchor.

The New Year marks as the fifth year of the chartered Italia flagged Epsilon under Irish Ferries operations but based on ‘economy’ class service on the French route. Three months into service the prefix of the ropax name, Cartour Epsilon was dropped. This was to remove the connection with previous operator, Caronte & Tourist SPA, Italy from where she served routes to Sicily.

At the time of posting Epsilon is docked in Cherbourg having completed the 17 hour 30 minute crossing from Dublin Port with an arrival this morning. As of this afternoon in the Normandy port is where rival Stena Line’s ropax, Stena Horizon departed and is bound for Rosslare tomorrow morning. Also in port is Brittany Ferries Barfleur one of several in the fleet serving on the English Channel in this context Cherbourg-Poole.

In addition the ropax 500 passenger/500 car capacity Epsilon serves during the week Dublin-Holyhead crossings and is due to dock in Dublin tomorrow morning before resuming such duties. Epsilon supports Walsh route regulars the fastcraft Jonathan Swift and flagship Ulysses currently off service, see report on Cammell Laird.

Taking the roster of Ulysses is routine Rosslare-Pembroke ferry Isle of Inishmore which in turn has been replaced on the southern corridor by Oscar Wilde. The cruiseferry during the winter does not operate out of Rosslare routes to France but is scheduled to resume service at the start of March, albeit only serving Cherbourg. The seasonal-only shorter route to Roscoff resuming in May.

Epsilon (E) is the name given to the fifth letter of the Greek alphabet which is apt given the ropax is also the firth vessel to join the current Irish Ferries fleet serving the UK and France. The flagship Ulysses resembles the appearance of a €144m cruiseferry on order to Flensburger Schiffbau (FSG) scheduled for delivery in May 2018. Emissions 'scrubber' technology is not included in the contract price.

The 50,000 gross tonnage cruiseferry will accommodate 1,885 passengers and crew. The newbuild will have 435 cabins, 2,800 lane metres of freight vehicle space with room for 165 freight vehicles and an additional dedicated car deck with capacity for 300 passenger cars.

According to Irish Continental Group (ICG), parent company of Irish Ferries, the cruiseferry will be designed to best meet the operational seasonality of their business. ICG commented that it is likely that the new cruiseferry will be introduced on routes served by Epsilon. 

The same German shipyard have recently received a letter of intent from Brittany Ferries to construct a 42,000 tonnes newbuild notably powered by liquefied natural gas LNG, a first for the Breton based operator. The 42,000 tonnes cruiseferry scheduled for delivery in May 2019 is to serve on the English Channel. The route is also from Normandy on the Caen (Oustreham)-Portsmouth link.
 
In April this year Brittany Ferries will reopen the seasonal Cork-Roscoff sailings served by flagship, Pont-Aven. Last season the cruiseferry was fitted with sulphur emission ‘scrubbers’ to meet an EU Sulphur Directive.

                                                                                                                                                                                                                                                                                                                             

Published in Ferry

#IrishSea - “Averse conditions in the Irish Sea” have prompted the cancellation of six Irish Ferries sailings between Dublin and Holyhead tomorrow (Friday 23 December), as The Irish Times reports.

Passengers scheduled to travel from Dublin on the 8.45am and 10.45am ferries are advised to catch the 8.05am departure instead, while afternoon travellers are asked to make their trip later on the 8.05pm or 8.55pm sailing.

Those coming from Holyhead at 11.50am, meanwhile, will be accommodated on the next sailing some two hours later, though late afternoon travellers will have to wait till the early hours of Saturday morning (24 December).

The cancellations come as Storm Barbara sweeps in from the North Atlantic across the north of Scotland, bringing with it a high risk of stormy weather conditions in the coastal counties of Connacht and Ulster.

Published in Ferry

#IrishFerries - Irish Ferries a division of owners Irish Continental Group (ICG) reported a 1.6pc rise in revenues in the year so far, and said it has a low level of exposure to sterling.

As the Independent.ie writes the company behind Irish Ferries, which operates between Ireland and Britain, said in a trading update that the impact of the plunge in sterling since the Brexit vote in June had so far been offset by lower costs.

The company said it had a low level of net sterling exposure. In the 10 months to the end of October, (ICG) consolidated revenue was €280.2m, up 1.6pc from a year ago, it said.

Net debt stood at €25.6m at the end of the period, compared to €44.3m at the end of 2015. Construction of a new cruise ferry announced on May 31 remains on schedule for delivery in May 2018, the company said.

For more detailed financial trading figures released by ICG click here 

Afloat adds that their ropax ferry MV Kaitaki (formerly Isle of Inishfree) remained on charter, operating in New Zealand, while four container ships (see EUCON trading results report) acquired in late 2015 were fully deployed in the period.

Also previously covered on Afloat, the charterer of the HSC Westpac Express exercised their option to extend the charter for a further period of up to 12 months to October 2017. The charter is subject to usual US government procurement regulations and the charterer has further options to extend the charter up to mid 2021.

The construction of a new 50,000 gross tonnage cruise ferry costing €144m announced in May this year remains on schedule for delivery in May 2018.

Published in Ferry

#NewFerry- Irish Continental Group (ICG) has entered into an agreement, with German company Flensburger Schiffbau-Gesselschaft & Co.KG (FSG) to build a cruise ferry for ICG at a contract price of €144 million.

Afloat adds that the proposed design of the newbuild strongly resembles that of current flagship Ulysses. 

The new cruise ferry will accommodate 1,885 passengers and crew, with 435 cabins and with capacity for 2,800 lane metres of freight (165 freight vehicles) plus an additional dedicated car deck with capacity for 300 passenger cars.

The Agreement between ICG and FSG provides that the cruise ferry is scheduled for delivery in May 2018. 20% of the contract price will be paid in instalments during the construction period. The balance of 80% will be paid on delivery. ICG intend to utilise a combination of existing cash resources and loan facilities to finance the cruise ferry. The pre-delivery instalment payments to FSG will be protected by means of bank guarantees.

This cruise ferry will be designed and built to the highest standards of cruise shipping, and equipped with efficiency and comfort in mind. Emissions scrubber technology (not included in the above price) and ballast water systems will meet current and known future environmental regulations and will deliver optimal fuel consumption while minimising related costs. The cruise ferry will be powered by four main engines delivering 33,600KW of power which will ensure a high degree of service reliability similar to that already achieved by the existing owned fleet of modern cruise ferries.

The cruise ferry will be designed to best meet the operational seasonality of our business. This flexibility in design includes the ability to service all of Irish Ferries existing routes, and will provide even greater route management options. The cruise ferry will also adhere to Ice Class specification which will allow for a wide geographic area of operation.

Passenger facilities will be spread over 4 decks and will offer a choice of 435 cabins to include suites with their own private external balconies, along with deluxe and standard class accommodation. In addition to a superb choice of bars, restaurants (to include both á la carte and self-service options), special provision has been made for premium Club Class passengers, with a dedicated lounge featuring private access direct from the vehicle decks. A choice of state of the art entertainment options and cinemas, dedicated facilities for freight drivers, as well as retail outlets and onboard facilities for pets, will ensure that all our passengers will be comfortable and engaged throughout their journey.

It is likely that this new cruise ferry will be introduced on routes served by the chartered ship MV Epsilon, (currently year round services Dublin - Holyhead midweek, and Ireland - France on weekends). The cruise ferry will provide additional freight and tourism capacity on both routes and will deliver a much enhanced onboard experience for all customers. In addition to increased capacity, the cruise ferry will deliver significant cost savings to the group and improved route and fleet management efficiencies.

Referring to the announcement Eamonn Rothwell, Chief Executive Officer, commented that; "This investment underpins the confidence the Group has in both the freight and passenger tourism markets between Ireland, Britain and France. The construction of a cruise ferry of this size will offer a premium experience for all our customers, in line with our commitment to deliver the best in service, in reliability and flexibility across all our routes. We also expect to be well positioned to accommodate the changing expectations of our customers, and to benefit from significant operational and financial benefits following the delivery in 2018."

Published in Ferry

Irish Ferries has linked up with An Garda Siochana, to support their forthcoming ‘Chris Crossing’ charity boat row across the Irish Sea, the aim being to raise some €50,000 for the National Neurosurgical Centre at Beaumont Hospital.

Planned in memory of Garda Chris Byrne, who passed away in March 2016 as a result of a brain tumour, the event is being undertaken by 12 Gardaí from Dublin’s Store Street station. The 12-15 hours crossing from Dublin to Holyhead will take place in late May/early June, depending on weather conditions.

Irish Ferries will provide transport and other logistics support required to guarantee the success of the undertaking.

As part of the build-up, celebrities from the worlds of sport and entertainment will participate with Gardai in staging on-street rowing demonstrations at two Dublin city centre locations on Saturday, April 30th when they will row the equivalent of 500 metres as part of a Top Gear-themed time challenge. Participants also plan to raise money through a bucket collection at Dublin’s Aviva Stadium prior to the Ireland v Holland soccer international on May 29th.

A wider appeal for subscriptions asks members of the public to text Beaumont to 50300 to make a €4 donation, or online at www.beaumontfundraising.ie

 

Published in Coastal Rowing
Tagged under

#ICGresults- Irish Continental Group plc released today their Preliminary Statement of Results for Year Ended 31 December 2015.

Commenting on the results, Chairman John B McGuckian said, “2015 was another successful year for the group with growth in revenue of 10.5% to €320.6 million and earnings before non-trading items, interest, tax, depreciation and amortisation (EBITDA) of €75.5 million, up 49.5%. During 2015 the Group benefited from lower world fuel prices, stronger Sterling and increased carryings. The Group maintains a pivotal position in facilitating Ireland’s international trade and tourism and is operationally geared to the economic recovery in Ireland. We have seen the benefits of this recovery continue into the early weeks of 2016 which, notwithstanding a weakening in Sterling and assuming current oil prices, gives us confidence that we can look forward in 2016, in the absence of unforeseen developments to further growth in revenue and earnings.”

2015 Overview (see below, attached downloadable preliminary results and charts). 

2015 has been another successful year for the Group, with a positive operational and financial performance in both divisions building upon the continued Irish economic recovery.

The Group has again strengthened its strategic position as the leading maritime transport provider in the Republic of Ireland. Revenue for the year grew by 10.5% to €320.6 million. EBITDA for the year increased by 49.5% to €75.5 million. Adjusted EPS, which excludes non-trading items, and the net interest cost on defined benefit pension obligations, was 87.7% higher at 29.1 cent. The Group’s return on average capital employed (ROACE) also increased significantly to 36.7% in 2015 (2014: 20.5%). The Group has benefited from the improvement in 2015 of the economies in our sphere of operations and the decline in global fuel prices. Sterling strength was a positive for tourism business in Irish Ferries. The strength of Sterling increased average yields during the period and also increased the attractiveness of Ireland as a tourist destination for UK based travellers. However, this benefit is partially offset by Sterling denominated costs. The Group’s total fuel cost was 26.4% lower than the previous year at €39.0 million (2014: €53.0 million). The benefit of lower fuel costs for the Group has been partially offset by a strong dollar versus the Euro, the fuel adjustment mechanism with freight customers where we pass on the reduction in fuel costs and the amendment of EU environmental regulations requiring the Group to consume more expensive fuel grades. The Group invested in its operations in the period through the acquisition of four LoLo container vessels adding to its owned vessel fleet and expansion of its container terminal operations at Belfast Port, both being examples of the continued growth in our operations.

BUSINESS REVIEWS Irish Continental Group operates through two divisions; the Ferries division operating under the Irish Ferries brand offering passenger and RoRo freight services. This division also carries out ship chartering activities. The Container and Terminal division, which includes the container shipping line, Eucon, and two container terminals, Dublin Ferryport Terminals (DFT) and Belfast Container Terminal (BCT), within the two main ports on the island of Ireland.

FERRIES DIVISION Revenue in the division was 10.6% higher than the previous year at €203.9 million (2014: €184.3 million). Revenue in the first half of the year increased 11.3% to €86.5 million (2014: €77.7 million), while in the second half revenue increased 10.1%, to €117.4 million (2014: €106.6 million). EBITDA increased to €63.7 million (2014: €43.1 million) while EBIT was €48.1 million compared with €28.0 million in 2014. The increase in profit was primarily driven by increased freight and passenger revenue and lower fuel prices in the year compared with 2014.

Car and Passenger markets It is estimated that the overall car market, to and from the Republic of Ireland, grew by approximately 1.2% in 2015 to 789,000 cars, while the all-island market, i.e. including routes into Northern Ireland, is estimated to have remained flat. Irish Ferries’ car carryings performed strongly during the year, at 400,900 cars, (2014: 381,800), up 5.0% on the previous year. In the first half Irish Ferries grew its car volumes by 7.1% while in the second half, which includes the busy summer holiday season at 3.6%.

The total sea passenger market (i.e. comprising car, coach and foot passengers) to and from the Republic of Ireland remained flat in 2015, at a total of 3.2 million passengers, while the all-island market decreased by 2%. Irish Ferries’ passenger numbers carried were up 2.0% at 1.676 million (2014: 1.643 million). In the first half of the year, Irish Ferries passenger volumes were up by 2.6% and in the second half of the year, the growth in passenger numbers was 1.5%.

RoRo Freight The RoRo freight market between the Republic of Ireland, and the U.K. and France, continued to grow in 2015 on the back of the Irish economic recovery, with the total number of trucks and trailers up circa 6% to approximately 888,000 units. On an all-island basis, the market was up around 4% to approximately 1.66 million units. Irish Ferries’ carryings, at 272,500 freight units (2014: 247,900), were up 9.9% in the year reflecting a strong performance by Irish Ferries relative to the market (volumes were up 11.5% in the first half and 8.5% in the second half). The freight market enjoyed excellent growth in 2015 helped by favourable economic condition in the Republic of Ireland. These economic factors in addition to the introduction of the ‘Epsilon’ in 2013 with the increased frequency it has provided has allowed us to outperform the market. The Epsilon in its second full year of operation has continued to perform well on both the Ireland – UK and Ireland – France routes.

Chartering The ’Kaitaki’ remained on its 4 year charter to KiwiRail during the year, operating in New Zealand. In an extension of the division’s chartering activities, four LoLo container vessels were purchased in late 2015 for a combined cost of €24.2 million. The vessels are the MV Elbfeeder (built 2008), MV Elbtrader (built 2008) and MV Elbcarrier (built 2007), each which has a capacity of 980 teu (Twenty Foot Equivalent) and a gross tonnage of 8,246 tons together with the MV Ranger (built 2005) which has a capacity for 803 teu and a gross tonnage of 7,852 tons. The three Elb vessels are currently on year-long charters to the Group’s container shipping subsidiary Eucon on routes between Ireland and the Continent whilst the Ranger is on charter to a third party.

CONTAINER AND TERMINAL DIVISION Revenue in the division increased to €118.2 million (2014: €107.0 million). The revenue is derived from container handling and related ancillary revenues at our terminals and in Eucon from a mix of domestic door-to-door, quay-to-quay and feeder services with 71% (2014: 71%) of shipping revenue generated from imports into Ireland. With a flexible chartered fleet and slot charter arrangements Eucon was able to adjust capacity and thereby continue to meet the requirements of customers in a cost effective and efficient manner. EBITDA in the division increased to €11.8 million (2014: €7.4 million) while EBIT rose 93.6% to €9.1 million (2014: €4.7 million) due mainly to increased volumes both in Eucon and in our terminal operations as well as reduced fuel costs. Overall container volumes shipped were up 3.4% compared with the previous year at 286,500 teu (2014: 277,200 teu).

Containers handled at the Group’s terminals in Dublin Ferryport Terminals (DFT) and Belfast Container Terminal (BCT) were up 32.9% at 248,500 lifts (2014: 187,000 lifts). DFT’s volumes were up 6.6%, while BCT’s lifts were up 146.4%. The increase in Belfast arises from the awarding in April 2015 by Belfast Harbour Commissioners (BHC) of the Services Concession to BCT for the operation of a combined container terminal at Victoria Terminal 3 (VT3). The process of combining the two existing container terminals in Belfast began in June and was completed in September.

On 1 January 2015, the EU Sulphur Directive came into force in many parts of Northern Europe, including the North Sea and the English Channel termed as Sulphur Emission Control Area’s (SECA’s). This reduced the permissible level of sulphur in bunker fuel from 1.0% to 0.1% for vessels in these SECA’s requiring the vessels in the Eucon fleet to consume higher cost, low sulphur fuel.

FINANCE EBITDA for the year was €75.5 million (2014: €50.5 million). There was a net outflow of working capital of €1.6 million, due to the higher level of activity in our operations. The Group made payments, in excess of service costs, to the Group’s pension funds of €2.7 million. Cash generated from operations amounted to €71.8 million (2014: €44.4 million).

Interest paid was €2.8 million (2014: €3.6 million) while taxation paid was €0.8 million (2014: €1.1 million). Interest received amounted to €0.1 million (2014: €0.1 million).

Capital expenditure was €35.0 million (2014: €8.0 million) which principally included €24.2 million for the acquisition of container vessels together with the annual refits of the passenger vessels.

The Group’s IAS 19 year end pension deficits were €5.1 million (2014: €24.1 million). Net debt at year end was €44.3 million (2014: €61.3 million) which represents 0.6 times EBITDA (2014: 1.2 times EBITDA). DIVIDEND During the year the Group paid the final dividend for 2014 of 7.035 cent per ICG Unit. The Group also paid an interim dividend for 2015 of 3.638 cent per ICG Unit, and the Board is proposing a final dividend of 7.387 cent per ICG Unit, payable in June 2016, making a total dividend for 2015 of 11.025 cent per ICG Unit, an increase of 5.0% on the prior year.

Subject to shareholder approval at the Annual General Meeting, the final dividend will be paid on 10 June 2016 to shareholders on the register at close of business on 27 May 2016. Irish dividend withholding tax will be deducted where appropriate. THE BOARD In the first half of the year executive directors Tony Kelly and Garry O’Dea retired from the Board on reaching the normal retirement age of 60 years. On 3 March 2016, the Group appointed David Ledwidge as a Director of the Company. David joined ICG in 2006 and in February 2015 was appointed as Chief Financial Officer ("CFO") designate taking up the CFO role in June 2015. He has been with ICG for over 9 years and has played a very significant part in the development of the Company which now looks forward to his contribution at Board level.

CURRENT TRADING & OUTLOOK Since our last update to the market, in the Interim Management Statement of November 2015, trading conditions have remained favourable. Revenue for the year increased by 10.5% for the full year, versus 9.9% for the 9 months to the end of September 2015 resulting in EBITDA for the final quarter of 2015 up €3.1 million at €11.4 million. The improved momentum has continued into the first two months of 2016. In the period to date cars are up 4% on last year and passenger carryings are 1% ahead of 2015. RoRo freight volumes are up 14% on the same period in 2015. In the Container and Terminal Division containers carried are up 12% while port lifts reflecting the expanded operations at Belfast Port are up 53% year to date.

Lower world fuel prices will continue to help performance although the recent weakening of Sterling will affect the Euro value of UK originating revenues. As a result of these factors, and the ongoing improvement in the economic outlook in our sphere of operations, we look forward, in the absence of unforeseen circumstances, to further growth in revenue and earnings for the financial year 2016.

Published in Ports & Shipping

#Director - Irish Continental Group (ICG) parent company of Irish Ferries, yesterday announced the appointment of David Ledwidge as a Director of the Company.

Ledwidge joined the shipping (incl Lo-Lo), transport and leisure group in 2006. In February 2015 he was appointed as Chief Financial Officer designate taking up the CFO role in June 2015.

ICG chairman John B.McGuckian commenting on the board appointment said "The Board is delighted to announce the appointment of David Ledwidge as a Director of the Company. He has been with ICG for over 9 years and has played a very significant part in the development of the Company. We now look forward to David's contribution at Board level".

In 2006 Ledwidge joined the group from Professional Services firm Deloitte. He is a member of the Institute of Chartered Accountants in Ireland and is a Bachelor of Science Graduate from Dublin Institute of Technology.

Published in Ports & Shipping

Irish Ferries ship Epsilon sustained extensive damage to her cargo – estimated by an Afloat source at thousands of Euro – having sailed from Cherbourg Sunday at 17:30 into the teeth of Storm Imogen. The 2011 Italian–built ship hit winds of a constant 60–knots with gusts of 105–knots at times. One observer said it was most likely the 'worst ever' crossing from France and suggested it was 'lucky the ship was not lost'.

Heavy seas and winds blowing up to Force 11 meant the Epsilon, sailing from Cherbourg to Dublin, had to divert into safer waters. The ship was forced to take shelter at sea in waters off the north Devon coast.

The sailing, due to arrive in Dublin at 11am on Monday morning, arrived Tuesday lunchtime.

Epsilon is the most recent addition to the Irish Ferries fleet and offers an economy class service on both the Dublin Port to Holyhead and Dublin Port to Cherbourg routes.

Published in Ports & Shipping
Tagged under

#FerryAward - Voted Ireland’s Best Ferry Company 2016 for the 6th year in succession was Irish Ferries at the Irish Travel Industry Awards (ITAA) held recently in the Mansion House, Dublin.

An initiative of the ITAA, the award in the category of Ferry & Cruise was presented to the company on foot of votes cast by Irish travel agents and suppliers.

Accepting the award, Irish Ferries head of passenger sales Dermot Merrigan thanked travel agents for their support, adding: ‘Irish Ferries is extremely honoured that our efforts to provide the highest possible level of service continue to be recognised, not only by our industry but especially by some of the hardest workers in it – our travel agents.'

The award follows the 'Best Ferry Company 2015' title awarded to the operator at the Irish Travel Trade News Awards in November.

Published in Ferry
Page 7 of 19

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023