Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Marine Notice

The Department of Transport has been advised by Vermilion Exploration & Production Ireland Limited of a maintenance campaign that will include an offshore pipeline and subsea structure inspection at the Corrib Gas Field subsea infrastructure.

This maintenance work was due to commence on Tuesday 14 May and will last for approximately 30 days.

A nearshore survey of the pipeline and umbilical of the Corrib subsea infrastructure will also take place. These works are due to commence on Friday 17 May and will last for approximately 10 days. All work dates are subject to weather and operational constraints.

Visual and acoustic surveys will be conducted by means of vessel- and ROV-mounted sensors. Electrical fault-finding will be conducted by ROV-mounted equipment.

The vessel EDT Jane (callsign 5BXW3) will undertake the subsea scope of work as part of the offshore pipeline and subsea structure inspection. All equipment used will be vessel and/or ROV mounted.

Elsewhere, the nearshore survey scope will be undertaken by the vessel Leah C (callsign EIQS5) while the vessels Macbel” (callsign EIHL5) and the Blue Eagle (callsign EI6808) will both provide safety and welfare support to Leah C. The vessels will be listening on VHF Channel 16 throughout the project.

Further information, including a map, coordinates and contact details, can be found in Marine Notice No 23 of 2024 attached below.

Published in Coastal Notes

The Department of Transport has been advised by Asso.Subsea that they are performing trenching trials on behalf of Nexans for CIDAC as part of the Celtic Interconnector Project.

The trenching trials will be located at various points along the planned route between the South East Coast of Ireland and the northern coast of France.

These trials are taking place from this week until Thursday 30 May, subject to weather and operational constraints, and are being conducted within the cable corridor extending around 200m each side of the planned cable centreline.

Works will be conducted by the trenching support vessel vessel Athena (callsign SVDO4). During the trenching trials, the vessel will be restricted in its ability to manoeuvre, and therefore all mariners are advised to provide a wide berth and navigate the area with caution.

The works vessel will keep a listening watch on VHF Channel 16 and will actively transmit an AIS signal.

Further information, including maps, coordinates and contact details, can be found in Marine Notice No 27 of 2024 attached below.

Published in Power From the Sea

The Department of Transport has been advised by Donegal County Council that it intends to begin refurbishment works at Rathmullan Pier and viaduct on the Fanad Peninsula north-east of Letterkenny.

These works are starting with immediate effect and will be ongoing for the next seven months until 30 November.

They are being carried out by marine civil engineering contractors working from a temporary compound at the head of the pier, using work vessels, a work pontoon, heavy civil engineering plant and equipment. Divers may also be employed on site from time to time.

For safety reasons, mariners are advised to avoid attempting to berth at Rathmullan Pier or pontoon as the ladders and stairway are to be removed and replaced, as well as the pontoon itself for the duration of the works.

Mariners are also advised to proceed slowly and with caution within the vicinity of Rathmullan Pier. Wave wash from vessels should be avoided.

For more details, including a map of the works area and contact information, see Marine Notice No 26 of 2024 attached below.

Published in Coastal Notes

The European Communities (Safe Loading and Unloading of Bulk Carriers) (Amendment) Regulations 2024 (SI No 110 of 2024) entered into force on 27 March 2024.

Changes to the regulations for the safe loading and unloading of bulk carriers now apply to all shipping terminals visited by bulk carriers for the loading or unloading of solid bulk cargoes, except those which are only visited by bulk carriers in exceptional circumstances.

The update also clarifies the requirements for regular verifications and unannounced inspections to be carried out by the Maribe Survey Office (MSO), and sets out the revised penalties for infringements.

For further details on the new regulations, see Marine Notice No 22 of 2024 attached below.

Published in Ports & Shipping

The Department of Transport has been notified by JD-Contractor that they will be performing out-of-service cutting and route clearance works on behalf of Nexans for CIDAC as part of the Celtic Interconnector Project.

The works will be located at various points along the planned subsea electricity cable route between the southeast coast of Ireland and the northern coast of France.

Works will begin on Wednesday 24 April and will continue for approximately 10 days, subject to weather and operational constraints.

The out-of-service (OOS) cable-cutting operations will be conducted within the cable corridor extending plus or minus 50 metres each side of planned cable centreline. The relevant waypoints can be found in Marine Notice No 20 of 2024, attached below.

The works will be conducted by the vessel MV Detector (callsign OUIV2) which will display the relevant lights and shapes during periods of restricted manoeuvrability and adhere to the International Regulations for the Prevention of Collisions at Sea (COLREGS) and all licensing requirements.

During OOS cutting operations, the vessel will keep a listening watch on VHF Channel 16 and will actively transmit an AIS signal. A listening watch will also be maintained on VTS VHF channels as appropriate. The vessel will broadcast daily, and at shorter intervals as may be required by passing traffic, the vessel position, operational information and planned operations for the next 24 hours.

Maps and coordinates as well as contact details are included in the Marine Notice below.

Published in Power From the Sea

The Department of Transport has been advised by Dublin Array that they will be conducting geophysical, geotechnical and environmental surveys for the Dublin Array offshore wind farm project.

Site investigation operations for the wind farm and the Expert Corridor Route (ECR) between the coast of Dublin and Wicklow will take place between Friday 19 April and the end of July, subject to weather and operational constraints.

The geophysical survey will be carried out by the vessel Fugro Helmert (callsign C6FT8). During these operations, the vessel will be towing equipment at a depth of up to five metres below the surface and extending some 300 metres astern.

The geotechnical survey will be carried out by the vessel M/V Flat Holm (callsign GHLZ) at fixed stations. The environmental survey will be carried out by the vessel Ros Áine (callsign EIZG5) in daytime hours only.

All vessels will be mobilised from Dun Laoghaire and will be restricted in their ability to manoeuvre, therefore all other mariners are advised to provide a wide berth and navigate with caution in the relevant area.

Coordinates and a map of the survey area, as well as contact details, can be found in Marine Notice No 18 of 2024, attached below.

Published in Power From the Sea

Fuinneamh Sceirde Teoranta (FST) will be undertaking both a geotechnical survey and geophysical survey for the Sceirde Rocks Windfarm Project in the Western Coastal Area (Connemara/Outer Galway Bay) and Atlantic Ocean, between Monday 15 April and Monday 10 June, subject to weather and operational constraints.

These surveys follow last September’s geophysical survey and will be undertaken by the multi-purpose offshore vessel Dina Polaris (callsign CQOF), which is fitted with a geotechnical drilling rig, and the research vessel Lady Kathleen (callsign EIXT2). Both vessels will operate up to 24 hours per day and will be displaying the appropriate lights and shapes.

During operations, the vessels will be restricted in their ability to manoeuvre. Therefore, passing vessels are requested to leave a wide berth during the deployment operations. Radio transmissions will be conducted with other seafarers to notify them of the operations. The vessels will be monitoring VHF Channel 16 at all times for safety purposes.

The equipment for each survey will be deployed within the bounds of the survey areas detailed in Marine Notice No 17 of 2024, attached below.

Published in Power From the Sea

Following cable lay operations set to conclude this weekend, Greenlink Interconnector Ltd will perform cable burial and trenching activities along the planned interconnector route.

These activities will be undertaken between Saturday 13 April and Thursday 20 June, subject to weather and operational constraints.

Operations will take place along the planned interconnector route between the landfall location near Baginbun Beach in Co Wexford and the middle of the Irish Sea. Coordinates and maps can be found in Marine Notice No 21 of 2024, attached below.

The works will be performed by the trenching support vessel Symphony (callsign LXTT). This vessel will have a trenching vehicle deployed or a remotely operated vehicle for survey activities deployed over the side.

As the work vessel will be restricted in its ability to manoeuvre, all other vessels operating within this area are requested to keep a wide berth and pass at minimum speed to reduce vessel wash. The work vessel will be listening to VHF Channel 16 and can set any other channel as required.

For further details, including contact information, see the Marine Notice below.

Published in News Update

Following the first and second legs in February and March, the third leg of this year’s Irish Anglerfish and Megrim Survey (IAMS 2024) is being carried out from Friday 12 to Sunday 21 April.

Surveys will be conducted to the North and North-West Coasts of Ireland by the Marine Institute in fulfilment of Ireland’s obligations under the Common Fisheries Policy (CFP).

Leg 3 is a demersal trawl survey consisting of approximately 50 otter trawls, each of 60 minutes duration, in ICES area 6a. Fishing in 2024 will take place within a three-nautical-mile radius of the positions indicated in Appendices 1 and 2 of Marine Notice No 12 of 2024, a PDF of which is attached below.

The survey will be conducted by the RV Celtic Explorer (callsign EIGB) which will display appropriate lights and signals. The vessel will be towing a Jackson demersal trawl during fishing operations.

The Marine Institute requests that commercial fishing and other marine operators keep a 3nm radius area around the tow points clear of any gear or apparatus during the survey period.

Further details are included in the Marine Notice below.

Published in Fishing

The Department of Transport has been advised that Next Geosolutions will perform shallow geotechnical surveys, pUXO ID surveys and KP5 Omega Loop surveys as part of the Celtic Interconnector Project cable route between the South-East Coast of Ireland and the coast of France.

The survey is expected to be completed over a 10-day period from this Wednesday 10 April, subject to weather and operational constraints.

Survey operations will be conducted within the cable corridor extending around 50m each side of the planned cable centreline.

The survey vessel NG Worker (callsign ICID) will carry out the survey works. Mariners are advised to provide a wide berth and navigate with caution in the area.

During survey operations, the vessel will keep a listening watch on VHF Channel 16 and will actively transmit an Automatic Identification System (AIS) signal. A listening watch will also be maintained on VTS VHF channels as appropriate.

The survey vessel shall broadcast daily, and at shorter intervals as may be required by passing traffic, the vessel position, operational information and planned operations for the next 24 hours. It is requested that fixed fishing gear within 1,000m of the route centreline be removed.

Coordinates and a map of the survey area as well as contact details can be found in Marine Notice No 13 of 2024 attached below.

Published in Power From the Sea
Page 1 of 55

Royal Cork Yacht Club

Royal Cork Yacht Club lays claim to the title of the world's oldest yacht club, founded in 1720. 

It is currently located in Crosshaven, Co. Cork, Ireland and is Cork Harbour’s largest yacht club and the biggest sailing club on the south coast of Ireland.

The club has an international reputation for the staging of sailing events most notable the biennial world famous Cork Week Regatta.

In 2020 RCYC celebrated its tricentenary under its Admiral Colin Morehead.

Royal Cork Yacht Club FAQs

The Royal Cork Yacht Club is the oldest yacht club in the world, and celebrated its 300th anniversary in 2020. It is one of the World’s leading yacht clubs, and is in the forefront of all branches of sailing activity. It is the organiser of the biennial Cork Week, widely regarded as Europe’s premier sailing event. It has hosted many National, European and World Championships. Its members compete at the highest level in all branches of sailing, and the club has a number of World, Olympic, continental and national sailors among its membership.

The Royal Cork Yacht club is in Crosshaven, Co Cork, a village on lower Cork Harbour some 20km south-east of Cork city centre and on the Owenabue river that flows into Cork Harbour.

The club was founded as The Water Club of the Harbour of Cork in 1720, in recognition of the growing popularity of private sailing following the Restoration of King Charles II. The monarch had been known to sail a yacht on the Thames for pleasure, and his interest is said to have inspired Murrough O’Brien, the 6th Lord Inchiquin — who attended his court in the 1660s and whose grandson, William O’Brien, the 9th Lord Inchiquin, founded the club with five friends.Originally based on Haulbowline Island in inner Cork Harbour, the club moved to nearby Cobh (then Cove) in 1806, and took on its current name in 1831. In 1966 the club merged with the Royal Munster Yacht Club and moved to its current premises in Crosshaven.

The Royal Cork Yacht Club today encompasses a wide variety of sailing activities, from young kids in their Optimist dinghies sailing right through the winter months to the not-so-young kids racing National 18s and 1720s during the remaining nine months. There is also enthusiastic sailing in Toppers, Lasers, RS Fevas and other dinghies. The larger keelboats race on various courses set in and around the Cork Harbour area for club competitions. They also take part in events such as the Round Ireland Race, Cowes Week and the Fastnet Race. In many far off waters, right across the globe, overseas club members proudly sail under the Royal Cork burger. The club has a significant number of cruising members, many of whom are content to sail our magnificent south and west coasts. Others head north for the Scottish islands and Scandinavia. Some go south to France, Spain, Portugal and the Mediterranean. The more adventurous have crossed the Atlantic, explored little known places in the Pacific and Indian Oceans while others have circumnavigated the globe.

As of November 2020, the Admiral of the Royal Cork Yacht Club is Colin Morehead, with Kieran O’Connell as Vice-Admiral. The club has three Rear-Admirals: Annamarie Fegan for Dinghies, Daragh Connolly for Keelboats and Mark Rider for Cruising.

As of November 2020, the Royal Cork Yacht Club has approximately 1,800 members.

The Royal Cork Yacht Club’s burgee is a red pennant with the heraldic badge of Ireland (a stylised harp topped with a crown) at its centre. The club’s ensign has a navy blue field with the Irish tricolour in its top left corner and the heraldic badge centred on its right half.

Yes, the Royal Cork Yacht Club organises and runs sailing events and courses for members and visitors all throughout the year and has very active keelboat and dinghy racing fleets. The club also hosts many National, European and World Championships, as well as its biennial Cork Week regatta — widely regarded as Europe’s premier sailing event.

Yes, the Royal Cork Yacht Club has an active junior section with sailing in Optimists, Toppers and other dinghies.

Charles Yes, the Royal Cork Yacht Club regularly runs junior sailing courses covering basic skills, certified by Irish Sailing.

 

The Royal Cork hosts both keelboats and dinghies, with the 1720 Sportsboat — the club’s own design — and National 18 among its most popular. Optimists and Toppers are sailed by juniors, and the club regularly sees action in Lasers, RS Fevas, 29ers and other dinghy classes.

The Royal Cork Yacht Club has a small fleet of 1720 Sportsboats available for ordinary members to charter.

The Royal Cork Yacht Club’s Club House office can provide phone, fax, email, internet and mail holding facilities for a small charge. Club merchandise and postcards may be purchased. Showers and toilet facilities are available 24 hours a day, free of charge. Parking is plentiful and free of charge. Diesel and petrol are available on site. Marina berths are generally available for a fee payable in advance; arrangements must be made before arrival.

Yes, the Royal Cork Yacht Club’s Club House has all of the usual facilities, including bars and restaurant, which are open during normal licensing hours. The restaurant provides a full range of meals, and sandwiches, snacks etc, are available on request.

Normal working hours during the sailing season at the Royal Cork Yacht Club are 9am to 9pm daily. For enquiries contact the RCYC office on 021 483 1023 or email [email protected]

Yes, the Royal Cork Yacht Club caters for all types of events rom weddings, anniversaries, christenings and birthday celebrations to corporate meetings, breakfast meetings, luncheons, private dinners and more. For enquiries contact the Royal Cork Yacht Club office on 021 483 1023 or email [email protected]

New members are invited to apply for membership of the Royal Cork Yacht Club by completing the Nomination Form (available from www.royalcork.com/membership) and returning it to The Secretary, Royal Cork Yacht Club, Crosshaven Co Cork. Nominations are first approved by the Executive Committee at its next meeting, and following a period on display for the members, and are reviewed again at the following meeting at which any objections are considered.

No; while ordinary members of the Royal Cork Yacht Club are usually boat owners, there is no requirement to own a boat when submitting an application for membership.

The annual feel for ordinary members (aged 30+) of the Royal Cork Yacht Club is €645. Family membership (two full members and all children aged 29 and under) is €975, while individuals youth (ages 19-29) and cadet (18 and under) memberships are €205. Other rates are available for seniors, associates and more. All fees quoted are as of the 2020 annual subscription rates.

Memberships of the Royal Cork Yacht Club are renewed annually, usually within 60 days of the club’s Annual General Meeting.
For enquiries contact the Royal Cork Yacht Club office on 021 483 1023 or email [email protected]

©Afloat 2020