#MarineNotice - The latest Marine Notice from the Department of Transport, Tourism and Sport (DTTAS) advises that annual maintenance and inspection activities will shortly be carried out on the Corrib Gas Field.
The works, being carried out in conjunction with the annual pipeline and umbilical maintenance inspection and flowline installation, will commence on Saturday 2 August 2014 and are expected to be completed by the end of the first week in September 2014.
The works will all take place within the 500m Safety Zone surrounding the Corrib subsea facilities. The vessel to be used will be the Normand Subsea (Call sign 2CQP8).
Full details of co-ordinates for the Safety Zone are included in Marine Notice No 46 of 2014, a PDF of which is available to read or download HERE.