Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Waterways Ireland

Waterways Ireland advises all masters of vessels and water users on the Shannon-Erne Waterway that Inland Fisheries Ireland will be conducting a fish stock survey on Lough Garadice in Co Leitrim next week between Monday 4 and Thursday 7 September.

All nets will be clearly marked by orange buoys marked “IFI Survey”, adds the cross-border body for Ireland’s inland waterways.

Masters of vessels and all water users should proceed with additional caution when operating on Lough Garadice during this period.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels on and users of the Shannon-Erne Waterway that tree trimming and hedge cutting will be carried out at various locations during the autumn/winter period from September 2023 to February 2024.

During this operation, floating pontoons will be located on the water with mechanical plant operating. Mechanical plant will also be in operation along the banks of the waterway.

Masters will be advised by Waterways Ireland staff when making a passage and the co-operation of masters is requested at this time.

The cross-border body for Ireland’s inland waterways says it regrets any inconvenience caused to its customers.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels on the Shannon-Erne Waterway that diving operations will be taking place between Lough Scur and Lock 9 on Wednesday 30 August to remove debris from the navigation channel.

Masters of vessels and all water users should proceed with additional caution in the area during this period, adds the cross-border body for Ireland’s inland waterways.

Published in Inland Waterways

Waterways Ireland advises masters of vessels and waterway users on the Erne System that dredging operations on the Kesh River in Co Fermanagh are continuing.

Dredging at the mouth of the Kesh River (West Section) has been completed as of this week, as previously reported on Afloat.ie.

Dredging on the two other river sections (Central and East) was scheduled to commence on Tuesday 29 August and will continue until Friday 22 September.

During this time the river will be closed to boating traffic from 8am to 6pm Mondays to Fridays, adds the cross-border body for Ireland’s inland waterways.

Published in Inland Waterways

Waterways Ireland advises masters of all craft on the Grand Canal that the lifting bridge at Monasterevin on the Barrow Line will be closed for canal traffic on Thursday 24 August only to facilitate emergency road repairs. The bridge will return to normal operations on Friday 25 August.

Published in Inland Waterways

Waterways Ireland advises masters of vessels and waterway users on the Shannon Navigation that the Rooskey Dry Dock facility is closed for use by the public from Monday 21 August until 1 August 2024 to facilitate upgrade works.

Published in Inland Waterways

Waterways Ireland advises all masters of vessels and waterways users that the Grand Canal’s Circular Line in Dublin (Lock C1 through to Lock C7) is currently closed to navigation due to fallen trees across the canal in the aftermath of Storm Betty at the weekend.

The cross-border body for Ireland’s inland waterways did not provide a timeframe for the line’s reopening but said it “apologies for any inconvenience caused”.

Published in Inland Waterways

Waterways Ireland advises masters of vessels and waterways users on the Shannon Navigation that there will be diving activities taking place in the river around Tarmonbarry Bridge, lock and quay on Thursday 17 August.

The bridge and lock will remain open but delays may be expected. Masters of vessels can divert via the Camlin River if desired.

The cross-border body for Ireland’s inland waterways also advises that two additional temporary green markers have been placed on the east side of Long Island, south of Athlone, to prevent boating traffic veering off the main navigation channel.

Masters of vessels are requested to proceed with additional caution in the area as high-water levels and fast flows continue to exist.

Published in Inland Waterways

Waterways Ireland advises all recreational users of the Erne System and Lower Bann Navigation that blue-green algae is present in a number of locations on these inland waterways.

Blue-green algae blooms can be toxic to humans and potentially lethal to animals under certain conditions. A number of serious incidents involving blue-green algae have been reported in Northern Ireland in recent week.

Waterways Ireland calls on all users of these waterways whether on or adjacent the water — and especially pet owners — to comply with any notices placed by their local authority and avoid contact or immersive activities in areas where blue-green algae is present.

Waterways Ireland’s jetties and slipways remain open, but the public is advised to refrain from immersive activities including swimming and not to allow pets to drink from or swim in affected areas.

The surface of slipways can become slippery due to algae build up, and Waterways Ireland advises additional caution when using slipway facilities in affected areas.

In addition, the public is encouraged to report encounters with blue-green algae blooms on the inland waterways via any of the following means:

Published in Inland Waterways

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that Uisce Éireann will be installing an outfall downstream of Killaloe and Ballina from next Monday 21 August to the end of September.

A work barge will be launched from the carpark adjacent to the Waterways Ireland building in Killaloe and will operate south of the bridge adjacent to the Ballina wastewater treatment plant for the duration of the works.

The outfall will extend from the Ballina plant into the river for a distance of 90 metres.

Two temporary special markers will be installed to mark the limits of the in-river works area downstream of Killaloe and Ballina. A permanent navigation marker will be installed when the works are completed.

Masters of vessels should proceed with additional caution in the vicinity of the works, adds the cross-border body for Ireland’s inland waterways.

Published in Inland Waterways
Page 10 of 68

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020