Menu

Ireland's sailing, boating & maritime magazine

Marine Notice: Corrib Gas Field Annual Maintenance & Inspection

25th July 2014
Marine Notice: Corrib Gas Field Annual Maintenance & Inspection

#MarineNotice - The latest Marine Notice from the Department of Transport, Tourism and Sport (DTTAS) advises that annual maintenance and inspection activities will shortly be carried out on the Corrib Gas Field.

The works, being carried out in conjunction with the annual pipeline and umbilical maintenance inspection and flowline installation, will commence on Saturday 2 August 2014 and are expected to be completed by the end of the first week in September 2014.

The works will all take place within the 500m Safety Zone surrounding the Corrib subsea facilities. The vessel to be used will be the Normand Subsea (Call sign 2CQP8).

Full details of co-ordinates for the Safety Zone are included in Marine Notice No 46 of 2014, a PDF of which is available to read or download HERE.

Published in Marine Warning
MacDara Conroy

About The Author

MacDara Conroy

Email The Author

MacDara Conroy is a contributor covering all things on the water, from boating and wildlife to science and business

We've got a favour to ask

More people are reading Afloat.ie than ever thanks to the power of the internet but we're in stormy seas because advertising revenues across the media are falling fast. Unlike many news sites, we haven’t put up a paywall because we want to keep our marine journalism open.

Afloat.ie is Ireland's only full–time marine journalism team and it takes time, money and hard work to produce our content.

So you can see why we need to ask for your help.

If everyone chipped in, we can enhance our coverage and our future would be more secure. You can help us through a small donation. Thank you.

Direct Donation to Afloat button