Menu

Ireland's sailing, boating & maritime magazine

Route Survey Planned for Beaufort Cable System in Celtic Sea

9th April 2022
Fugro Supporter
File image of the Fugro Supporter, which will be used for the survey in the Celtic Sea later this month Credit: OPT

Fugro Germany Marine GmbH plans to conduct a cable route survey outside Irish territorial waters (12NM), but within the Irish EEZ, along the proposed Beaufort Cable System cable route in the Celtic Sea.

Geophysical and geotechnical operations on the planned cable route are expected to be carried out from Thursday 28 April until Sunday 15 May, weather and work progress permitting.

The survey will be conducted by the Fugro Supporter (callsign C6EC3) on a 24-hour basis. As this vessel will be towing survey equipment as well as conducting stationary work, it will be restricted in ability to manoeuvre.

Mariners are advised to keep continuous watch on VHF radio Channel 16 when navigating the area, to keep their distance and to pass at minimum speed to reduce vessel wash.

Details of coordinates for the survey area and contact information can be found in Marine Notice No 18 of 2022, attached below.

Downloads

Published in News Update
Afloat.ie Team

About The Author

Afloat.ie Team

Email The Author

Afloat.ie is Ireland's dedicated marine journalism team.

Have you got a story for our reporters? Email us here.

We've got a favour to ask

More people are reading Afloat.ie than ever thanks to the power of the internet but we're in stormy seas because advertising revenues across the media are falling fast. Unlike many news sites, we haven’t put up a paywall because we want to keep our marine journalism open.

Afloat.ie is Ireland's only full–time marine journalism team and it takes time, money and hard work to produce our content.

So you can see why we need to ask for your help.

If everyone chipped in, we can enhance our coverage and our future would be more secure. You can help us through a small donation. Thank you.

Direct Donation to Afloat button